docs(phase-04): closure ceremony — milestone v1 complete
phase.complete CLI ran (commit n/a — CLI in-mem only) with documented
defects per recurring state.record-session bug:
- completed_phases stuck at 3 (should be 4)
- percent regressed to 75% (3/4 math; should be 100% — milestone-complete)
- ROADMAP Phase 4 row still [ ] despite roadmap_updated:true claim
Manual fix applied per saved memory (canonical workaround for CLI bug):
STATE.md:
- completed_phases: 3 → 4
- percent: 75 → 100
- progress bar: [█████████▓] 97% → [██████████] 100%
ROADMAP.md:
- Phase 4 row: [ ] → [x] with comprehensive closure annotation
(8 plans + 3 debug sessions + 4 ROADMAP SCs + 5 D-P4-* + UAT
33→36 + vitest 171→188 + bundle gates 6/6 + Tier-1 12 + Tier-2 added
+ operator ack 2026-05-26 + verifier audit PASSED 8ffc6cb)
Phase 4 closed end-to-end. Milestone v1 v2.0.0 complete (status:
milestone_complete already correctly set by CLI). Ready for v1.0 tag +
alpha redistribution per D-P4-04 (user routes out-of-band).
This commit is contained in:
@@ -35,7 +35,7 @@ Decimal phases appear between their surrounding integers in numeric order.
|
|||||||
- [x] **Phase 1: Stabilize video pipeline** — Collapse offscreen duality, fix MediaRecorder shadow, fix WebM ring buffer playability, replace `chrome.tabCapture` with offscreen `getDisplayMedia` (AMENDED from original DEC-003). **CLOSED 2026-05-20** via gsd-verifier goal-backward audit GREEN (17/17 must-haves: 11 REQs/charters + 6 cross-cutting gates; see `.planning/phases/01-stabilize-video-pipeline/01-VERIFICATION.md`). Closure arc: 2026-05-15 (Plan 01-07) → 2026-05-16 (REOPENED on D-13 multi-EBML bug) → Plan 01-08 (WebM remux via ts-ebml + webm-muxer) → Plans 01-09/01-10 (whole-desktop + welcome-tab UX) → Plan 01-11 (spike-pivot) → Plan 01-12 (Design Integration) → Plan 01-13 (UAT harness 15/15 GREEN, 2026-05-19) → Plan 01-14 (monitorTypeSurfaces picker) → Plan 01-10 cycle-2 ack 'All good' 2026-05-20 + 5 inter-cycle debug fixes + brand-rename polish. 14/14 plans; 5 operator acks; 153/153 vitest + 24/24 UAT + Tier-1 grep 12 FORBIDDEN_HOOK_STRINGS all GREEN.
|
- [x] **Phase 1: Stabilize video pipeline** — Collapse offscreen duality, fix MediaRecorder shadow, fix WebM ring buffer playability, replace `chrome.tabCapture` with offscreen `getDisplayMedia` (AMENDED from original DEC-003). **CLOSED 2026-05-20** via gsd-verifier goal-backward audit GREEN (17/17 must-haves: 11 REQs/charters + 6 cross-cutting gates; see `.planning/phases/01-stabilize-video-pipeline/01-VERIFICATION.md`). Closure arc: 2026-05-15 (Plan 01-07) → 2026-05-16 (REOPENED on D-13 multi-EBML bug) → Plan 01-08 (WebM remux via ts-ebml + webm-muxer) → Plans 01-09/01-10 (whole-desktop + welcome-tab UX) → Plan 01-11 (spike-pivot) → Plan 01-12 (Design Integration) → Plan 01-13 (UAT harness 15/15 GREEN, 2026-05-19) → Plan 01-14 (monitorTypeSurfaces picker) → Plan 01-10 cycle-2 ack 'All good' 2026-05-20 + 5 inter-cycle debug fixes + brand-rename polish. 14/14 plans; 5 operator acks; 153/153 vitest + 24/24 UAT + Tier-1 grep 12 FORBIDDEN_HOOK_STRINGS all GREEN.
|
||||||
- [ ] **Phase 2: Stabilize export pipeline** — Close remaining export gaps (screenshot-at-click, meta.json schema, archive layout, manifest permission verification). Mostly already shipped via Plans 01-08 + 01-09 + 01-10 + 01-12 — narrowed scope post-re-phasing.
|
- [ ] **Phase 2: Stabilize export pipeline** — Close remaining export gaps (screenshot-at-click, meta.json schema, archive layout, manifest permission verification). Mostly already shipped via Plans 01-08 + 01-09 + 01-10 + 01-12 — narrowed scope post-re-phasing.
|
||||||
- [ ] **Phase 3: SPEC §10 smoke verification** — End-to-end install-and-record-and-export pass against all 9 acceptance criteria. **ABSORBS** REQ-rrweb-dom-buffer + REQ-user-event-log verification (originally Phase 2) per 2026-05-20 re-phasing. UAT harness extended with A24+ assertions for rrweb/event-log contracts.
|
- [ ] **Phase 3: SPEC §10 smoke verification** — End-to-end install-and-record-and-export pass against all 9 acceptance criteria. **ABSORBS** REQ-rrweb-dom-buffer + REQ-user-event-log verification (originally Phase 2) per 2026-05-20 re-phasing. UAT harness extended with A24+ assertions for rrweb/event-log contracts.
|
||||||
- [ ] **Phase 4: Harden + clean up** _(optional)_ — P1/P2 follow-ups: SW state persistence, fetch interception, `meta.json` fields, `generate-icons.js` ESM/CJS, dead-code; plus deferred items from Phase 1 session (cursor visibility, dark-surface logo, tabs permission gap, 2 ffprobe flakes, ROADMAP backfill verification, rrweb 2.0.0-alpha.4 → stable v2 upgrade research).
|
- [x] **Phase 4: Harden + clean up** _(optional)_ — P1/P2 follow-ups: SW state persistence, fetch interception, `meta.json` fields, `generate-icons.js` ESM/CJS, dead-code; plus deferred items from Phase 1 session (cursor visibility, dark-surface logo, tabs permission gap, 2 ffprobe flakes, ROADMAP backfill verification, rrweb 2.0.0-alpha.4 → stable v2 upgrade research). **CLOSED 2026-05-26** via gsd-verifier goal-backward audit GREEN (4/4 ROADMAP SCs + 11/11 observable truths + 0 overrides; commit `8ffc6cb`; see `.planning/phases/04-harden-clean-up-optional/04-VERIFICATION.md`). 8 plans landed (04-01..04-08; 04-08 inserted Wave 5.5 after Plan 04-04 SPIKE FAILED was empirically REFUTED-architecture via 2 /gsd-debug sessions on canvas-throttling); 5/5 D-P4-* charters CLOSED; 3 /gsd-debug sessions (canvas-throttling resolved, A33.1 SAVE-ack race fixed at `7e0da63`, dark-mode --mks-mark-stroke decoupling at `a8bcc17`); 1 operator-empirical ack cycle on Plan 04-06 ('Confirmed fixed' 2026-05-26 after TWEAK → debug fix → re-empirical); UAT harness 33→36 GREEN (A33 via 04-08 + A34 via 04-05 + A35 via 04-06 with 5 sub-checks incl. A35.5 light+dark decouple-proof); vitest 171→188 GREEN (with documented 04-CONTEXT #9/#10 ffprobe parallel-vitest flake family); bundle gates 6/6 PASS (Gate 2 `new Function` flipped 1→0 via Plan 04-02 setimmediate 4-mechanism layered mitigation); Tier-1 FORBIDDEN_HOOK_STRINGS unchanged at 12; Tier-2 leak gate added (Plan 04-08 synthetic-display-source dist/ check).
|
||||||
|
|
||||||
## Phase Details
|
## Phase Details
|
||||||
|
|
||||||
|
|||||||
@@ -2,16 +2,16 @@
|
|||||||
gsd_state_version: 1.0
|
gsd_state_version: 1.0
|
||||||
milestone: v2.0.0
|
milestone: v2.0.0
|
||||||
milestone_name: milestone
|
milestone_name: milestone
|
||||||
status: executing
|
status: milestone_complete
|
||||||
stopped_at: "Completed 04-07-PLAN.md (Phase 4 closure aggregator — 04-VERIFICATION.md created end-to-end; 4/4 ROADMAP SC closed; 3/3 audit P1 polish closed; 6/6 cross-cutting hardening items GREEN; UAT 36/36 + vitest 188/188 + 6/6 pre-checkpoint bundle gates + Tier-1=12 + Tier-2 NEW; D-P4-05 ROADMAP backfill verified; STATE.md/ROADMAP.md/REQUIREMENTS.md/PROJECT.md marker flips landed. Phase 4 row + completed_phases bump deferred to closure ceremony post gsd-verifier audit)"
|
stopped_at: Milestone complete (Phase 04 was final phase)
|
||||||
last_updated: "2026-05-26T11:30:00Z"
|
last_updated: 2026-05-26T12:32:04.189Z
|
||||||
last_activity: 2026-05-26
|
last_activity: 2026-05-26
|
||||||
progress:
|
progress:
|
||||||
total_phases: 4
|
total_phases: 4
|
||||||
completed_phases: 3
|
completed_phases: 4
|
||||||
total_plans: 31
|
total_plans: 31
|
||||||
completed_plans: 30
|
completed_plans: 31
|
||||||
percent: 97
|
percent: 100
|
||||||
---
|
---
|
||||||
|
|
||||||
# Project State
|
# Project State
|
||||||
@@ -23,17 +23,17 @@ See: .planning/PROJECT.md (updated 2026-05-15)
|
|||||||
**Core value:** When an operator hits a bug, one click MUST produce a
|
**Core value:** When an operator hits a bug, one click MUST produce a
|
||||||
self-contained archive that lets support reproduce what happened — in under 5 s,
|
self-contained archive that lets support reproduce what happened — in under 5 s,
|
||||||
no server, no password leaks.
|
no server, no password leaks.
|
||||||
**Current focus:** Phase 04 — harden-clean-up-optional
|
**Current focus:** Milestone complete
|
||||||
|
|
||||||
## Current Position
|
## Current Position
|
||||||
|
|
||||||
Phase: 04 (harden-clean-up-optional) — EXECUTING (Plan 04-07 closed; awaiting independent gsd-verifier audit for Phase 4 formal closure ceremony)
|
Phase: 04
|
||||||
Phase 4 of 4 (Hardening — optional) — Plans 04-01..04-08 all closed (8/8); Plan 04-07 (this plan) created `.planning/phases/04-harden-clean-up-optional/04-VERIFICATION.md` aggregator + marker flips. ROADMAP SC #1 + #2 + #3 + #4 all CLOSED; D-P4-02 + D-P4-03 + D-P4-05 all CLOSED; D-P4-01 + D-P4-04 honored throughout.
|
Phase 4 of 4 (Hardening — optional) — Plans 04-01..04-08 all closed (8/8); Plan 04-07 (this plan) created `.planning/phases/04-harden-clean-up-optional/04-VERIFICATION.md` aggregator + marker flips. ROADMAP SC #1 + #2 + #3 + #4 all CLOSED; D-P4-02 + D-P4-03 + D-P4-05 all CLOSED; D-P4-01 + D-P4-04 honored throughout.
|
||||||
Plan: 8 of 8 (Plan 04-07 = CLOSED via THIS execution)
|
Plan: Not started
|
||||||
Status: v1 milestone close-prep complete; pending independent gsd-verifier audit + closure-ceremony marker flips (ROADMAP Phase 4 row [x] + `completed_phases: 3 → 4` + `status: executing → completed` happen at closure ceremony — NOT during this plan)
|
Status: Milestone complete
|
||||||
Last activity: 2026-05-26
|
Last activity: 2026-05-26
|
||||||
|
|
||||||
Progress: [█████████▓] 97%
|
Progress: [██████████] 100% — Milestone v1 complete (Phase 4 verifier PASSED 2026-05-26; 4/4 phases closed; 31/31 plans landed)
|
||||||
|
|
||||||
### Plan 04-07 closure (2026-05-26)
|
### Plan 04-07 closure (2026-05-26)
|
||||||
|
|
||||||
@@ -159,7 +159,7 @@ Progress: [█████████▓] 97%
|
|||||||
|
|
||||||
**Velocity:**
|
**Velocity:**
|
||||||
|
|
||||||
- Total plans completed: 9
|
- Total plans completed: 17
|
||||||
- Average duration: —
|
- Average duration: —
|
||||||
- Total execution time: —
|
- Total execution time: —
|
||||||
|
|
||||||
@@ -174,6 +174,7 @@ Progress: [█████████▓] 97%
|
|||||||
| 5. Harden + clean up | 0 | — | — |
|
| 5. Harden + clean up | 0 | — | — |
|
||||||
| 02 | 4 | - | - |
|
| 02 | 4 | - | - |
|
||||||
| 03 | 5 | - | - |
|
| 03 | 5 | - | - |
|
||||||
|
| 04 | 8 | - | - |
|
||||||
|
|
||||||
**Recent Trend:**
|
**Recent Trend:**
|
||||||
|
|
||||||
|
|||||||