docs(01-06): complete vite.config.ts collapse plan

- 01-06-SUMMARY.md: detailed write-up — 226 → 21 lines, Outcome A
  reconciliation (dist/src/offscreen/index.html), full dist layout
  for Plan 07's smoke test, T-1-NEW-06-01 / T-1-NEW-06-02 grep gates
- STATE.md: completed_plans 5 → 6, percent 71 → 86, current plan
  advanced 6 → 7, two new decisions logged, session stopped_at updated
- ROADMAP.md: Phase 1 plan progress row 4/7 → 6/7; 01-06-PLAN.md
  checked off

REQ-video-ring-buffer remains unchecked — Plan 07 owns the ffprobe gate.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
This commit is contained in:
2026-05-15 18:17:43 +02:00
parent 6aeeda495c
commit 1ebfb42b30
3 changed files with 321 additions and 11 deletions

View File

@@ -3,15 +3,15 @@ gsd_state_version: 1.0
milestone: v2.0.0
milestone_name: milestone
status: executing
stopped_at: Completed Plan 01-05SW shrink + onConnect host wired (T-1-04 sender check, OFFSCREEN_READY handshake, port-based buffer fetch, IDB orphan cleanup, hasDocument re-sync); 9/9 tests still green; Plan 06 next (vite.config.ts collapse)
last_updated: "2026-05-15T16:06:29.434Z"
stopped_at: Completed Plan 01-06vite.config.ts collapse (226 -> 21 lines), orphan offscreen/ dir deleted, dist build green, crxjs Outcome A confirmed and SW URL reconciled (chrome.runtime.getURL('src/offscreen/index.html')); 9/9 tests still green; Plan 07 next (ffprobe acceptance gate)
last_updated: "2026-05-15T16:16:50.760Z"
last_activity: 2026-05-15
progress:
total_phases: 5
completed_phases: 0
total_plans: 7
completed_plans: 5
percent: 71
completed_plans: 6
percent: 86
---
# Project State
@@ -28,12 +28,12 @@ no server, no password leaks.
## Current Position
Phase: 1 (Stabilize Video Pipeline) — EXECUTING
Plan: 6 of 7
Plan: 7 of 7
Status: Ready to execute
Last activity: 2026-05-15
REQUIREMENTS.md, ROADMAP.md, STATE.md written)
Progress: [███████░░░] 71%
Progress: [█████████░] 86%
## Performance Metrics
@@ -64,6 +64,7 @@ Progress: [███████░░░] 71%
| Phase 1 P03 | 8min | 3 tasks | 5 files |
| Phase 01 P04 | 4min | 3 tasks | 1 files |
| Phase 01 P05 | 8min | 2 tasks | 1 files |
| Phase 1 P06 | 3min | 2 tasks | 2 files |
## Accumulated Context
@@ -98,6 +99,8 @@ current work:
- [Phase ?]: [Phase 01-05]: Added chrome.offscreen.hasDocument() in initialize() — Rule 2 robustness, audit P1 #8 mitigation across SW respawns
- [Phase ?]: [Phase 01-05]: SW is now a pure coordinator — onConnect host bound to 'video-keepalive' port with T-1-04 sender check; getVideoBufferFromOffscreen replaces synchronous SW-local buffer fetch; OFFSCREEN_READY handshake closes the audit P1 #12 race
- [Phase ?]: [Phase 01-05]: indexedDB.deleteDatabase('VideoRecorderDB') in onInstalled — T-1-NEW-05-02 / RESEARCH.md Runtime State Inventory cleanup of orphaned IDB from pre-Phase-01 builds
- [Phase ?]: [Phase 01-06]: Collapsed vite.config.ts from 226 -> 21 lines (RESEARCH.md Example B verbatim); deleted 174-line inline copy-offscreen plugin (audit P0 #1 root cause) and the orphan offscreen/ top-level directory (D-08)
- [Phase ?]: [Phase 01-06]: crxjs Outcome A confirmed — dist/src/offscreen/index.html (preserves src/ prefix from rollupOptions.input key). SW URL adjusted to chrome.runtime.getURL('src/offscreen/index.html'); RESEARCH.md Pitfall 5 binding empirically verified
### Pending Todos
@@ -120,7 +123,7 @@ Items acknowledged and carried forward from previous milestone close:
## Session Continuity
Last session: 2026-05-15T16:06:29.412Z
Stopped at: Completed Plan 01-05SW shrink + onConnect host wired (T-1-04 sender check, OFFSCREEN_READY handshake, port-based buffer fetch, IDB orphan cleanup, hasDocument re-sync); 9/9 tests still green; Plan 06 next (vite.config.ts collapse)
Last session: 2026-05-15T16:16:50.743Z
Stopped at: Completed Plan 01-06vite.config.ts collapse (226 -> 21 lines), orphan offscreen/ dir deleted, dist build green, crxjs Outcome A confirmed and SW URL reconciled (chrome.runtime.getURL('src/offscreen/index.html')); 9/9 tests still green; Plan 07 next (ffprobe acceptance gate)
intel synthesis. Coverage validated: 11/11 v1 REQs mapped.
Resume file: .planning/phases/01-stabilize-video-pipeline/01-06-PLAN.md
Resume file: None