docs(01-13): close — operator UAT ack 2026-05-19 + save-stops debug resolved + SUMMARY landed

Plan 01-13 fully closed. Operator UAT acked "all good" on 2026-05-19;
recovery flow (A7) + restart-after-click (A2) both harness-covered, no
manual verification needed.

What this commit lands:
- 01-13-SUMMARY.md (full spike-pivot-then-implementation narrative; tracks
  all 16 commits across Plan 01-11 spike + Plan 01-13 4-wave execution +
  save-stops debug session; documents 15/15 npm run test:uat GREEN +
  98/98 vitest GREEN + Bug A/B regression-rewind demos verified)
- Save-stops debug record moved to .planning/debug/resolved/ (closure-
  canonical location; prior inline path tracked via git mv)
- STATE.md sync: completed_plans 11→12, percent 95→96, Plan 01-13
  fully-closed narrative + save-stops debug session captured

Phase 1 functional contract: CLOSED via harness PASS.
Remaining Phase 1 gates: Plan 01-10 (welcome tab) + Plan 01-12 (design
integration; pending designer Newsreader-Cyrillic reply).

Phase 2 inherits the harness as its closure-gate template.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
This commit is contained in:
2026-05-19 13:46:49 +02:00
parent 89f3337334
commit 285e46f620
3 changed files with 214 additions and 10 deletions

View File

@@ -3,15 +3,15 @@ gsd_state_version: 1.0
milestone: v2.0.0
milestone_name: milestone
status: executing
stopped_at: Plan 01-13 Wave 4 closure docs landed; Plan 01-09 functional contract closed via harness PASS; awaiting operator brand/design ack (Plan 01-13 Task 9) + Plan 01-10 welcome tab + Plan 01-12 design integration (designer reply pending)
last_updated: "2026-05-19T10:40:00Z"
stopped_at: Plan 01-13 FULLY CLOSED (operator UAT ack 2026-05-19; save-stops-recording charter divergence fixed inline via debug session); Plan 01-09 functional contract closed via harness PASS; remaining Phase 1 gates = Plan 01-10 welcome tab + Plan 01-12 design integration (designer reply pending)
last_updated: "2026-05-19T13:40:00Z"
last_activity: 2026-05-19
progress:
total_phases: 5
completed_phases: 0
total_plans: 10
completed_plans: 11
percent: 95
completed_plans: 12
percent: 96
---
# Project State
@@ -35,14 +35,20 @@ Last activity: 2026-05-19
Progress: [█████████▌] 95% (Phase 1) — 0/5 phases fully complete (Phase 1 was 100% on 2026-05-15, reopened by Plan 01-09 operator UAT; functionally closed again 2026-05-19 via Plan 01-13 harness PASS)
### Plan 01-13 landing (2026-05-19)
### Plan 01-13 closure (2026-05-19)
- Puppeteer-based UAT harness at HEAD `d793c9e` (Wave 3D); `npm run test:uat` exits 0 with 14/14 GREEN
- Bug A regression rewind empirically verified (commit body 6a77967 — Plan 01-13 Wave 3C)
- Bug B regression rewind empirically verified (commit body b665919 — Plan 01-13 Wave 3B)
- Plan 01-09 functional contract closed via harness PASS: Task 5 steps 4, 5, 7-13, 15 now covered by harness assertions A1-A13 per `01-09-PLAN.md` Amendment 2
- Operator gates retained on Plan 01-09: Step 1 (build verification) + Step 14 (brand/design ack — the Plan 01-13 Task 9 operator checkpoint)
- Puppeteer-based UAT harness: `npm run test:uat` exits 0 with **15/15 GREEN** (A0-A14)
- Bug A regression rewind empirically verified (commit body 6a77967)
- Bug B regression rewind empirically verified (commit body b665919)
- Plan 01-09 functional contract closed via harness PASS per `01-09-PLAN.md` Amendment 2
- Operator UAT Task 9 ack'd 2026-05-19 ("all good" — recovery + restart-after-click covered by harness A7 + A2)
- **Save-stops-recording charter divergence fixed inline via debug session** (`.planning/debug/resolved/01-09-save-stops-recording.md`):
- Symptom: SAVE created zip but did NOT stop recording (badge stayed REC; Chrome share banner persisted)
- Root cause: implementation 01-09 over-extended "always-on safety net" framing; SPEC intent is one-shot
- Fix: SW SAVE_ARCHIVE handler dispatches STOP_RECORDING + setIdleMode in finally (4f4c3e2)
- Harness regression coverage: A14 added (2b6c24b) — post-SAVE state check (badge='', popup='', no new recovery notif)
- Plan 01-11 closed as spike-pivot (ba5474c SUMMARY); architecture lessons (no `await import(...)` in SW; `track.dispatchEvent('ended')` not `track.stop()`; `__MOKOSH_UAT__` Vite define-token) carried forward into Plan 01-13's Approach B harness
- vitest: 83 → 98 GREEN across Plan 01-13 (+15: Tier-1 grep gate strings + hook contract tests + save-stops unit tests)
### Outstanding Phase 1 gates