docs(01-13): close — operator UAT ack 2026-05-19 + save-stops debug resolved + SUMMARY landed
Plan 01-13 fully closed. Operator UAT acked "all good" on 2026-05-19; recovery flow (A7) + restart-after-click (A2) both harness-covered, no manual verification needed. What this commit lands: - 01-13-SUMMARY.md (full spike-pivot-then-implementation narrative; tracks all 16 commits across Plan 01-11 spike + Plan 01-13 4-wave execution + save-stops debug session; documents 15/15 npm run test:uat GREEN + 98/98 vitest GREEN + Bug A/B regression-rewind demos verified) - Save-stops debug record moved to .planning/debug/resolved/ (closure- canonical location; prior inline path tracked via git mv) - STATE.md sync: completed_plans 11→12, percent 95→96, Plan 01-13 fully-closed narrative + save-stops debug session captured Phase 1 functional contract: CLOSED via harness PASS. Remaining Phase 1 gates: Plan 01-10 (welcome tab) + Plan 01-12 (design integration; pending designer Newsreader-Cyrillic reply). Phase 2 inherits the harness as its closure-gate template. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
This commit is contained in:
Reference in New Issue
Block a user