docs(state): record phase 1 context session .planning/STATE.md
This commit is contained in:
@@ -1,3 +1,19 @@
|
|||||||
|
---
|
||||||
|
gsd_state_version: 1.0
|
||||||
|
milestone: v2.0.0
|
||||||
|
milestone_name: milestone
|
||||||
|
status: planning
|
||||||
|
stopped_at: Phase 1 context gathered
|
||||||
|
last_updated: "2026-05-15T13:40:45.486Z"
|
||||||
|
last_activity: 2026-05-15 — bootstrap from intel synthesis (PROJECT.md,
|
||||||
|
progress:
|
||||||
|
total_phases: 5
|
||||||
|
completed_phases: 0
|
||||||
|
total_plans: 0
|
||||||
|
completed_plans: 0
|
||||||
|
percent: 0
|
||||||
|
---
|
||||||
|
|
||||||
# Project State
|
# Project State
|
||||||
|
|
||||||
## Project Reference
|
## Project Reference
|
||||||
@@ -22,6 +38,7 @@ Progress: [░░░░░░░░░░] 0%
|
|||||||
## Performance Metrics
|
## Performance Metrics
|
||||||
|
|
||||||
**Velocity:**
|
**Velocity:**
|
||||||
|
|
||||||
- Total plans completed: 0
|
- Total plans completed: 0
|
||||||
- Average duration: —
|
- Average duration: —
|
||||||
- Total execution time: —
|
- Total execution time: —
|
||||||
@@ -37,6 +54,7 @@ Progress: [░░░░░░░░░░] 0%
|
|||||||
| 5. Harden + clean up | 0 | — | — |
|
| 5. Harden + clean up | 0 | — | — |
|
||||||
|
|
||||||
**Recent Trend:**
|
**Recent Trend:**
|
||||||
|
|
||||||
- Last 5 plans: —
|
- Last 5 plans: —
|
||||||
- Trend: —
|
- Trend: —
|
||||||
|
|
||||||
@@ -54,6 +72,7 @@ current work:
|
|||||||
first attempt to be remediated against the SPEC, not as greenfield. The
|
first attempt to be remediated against the SPEC, not as greenfield. The
|
||||||
7 P0 defects from the audit are split across phases 1–3 along commit
|
7 P0 defects from the audit are split across phases 1–3 along commit
|
||||||
boundaries; phase 4 is end-to-end SPEC §10 smoke verification.
|
boundaries; phase 4 is end-to-end SPEC §10 smoke verification.
|
||||||
|
|
||||||
- All 12 SPEC decisions (`DEC-001`..`DEC-012`) are LOCKED for Phase 1.
|
- All 12 SPEC decisions (`DEC-001`..`DEC-012`) are LOCKED for Phase 1.
|
||||||
Changing any of them requires a formal ADR; none are formally LOCKED in the
|
Changing any of them requires a formal ADR; none are formally LOCKED in the
|
||||||
ingest classification, so a future ADR can revise.
|
ingest classification, so a future ADR can revise.
|
||||||
@@ -79,7 +98,7 @@ Items acknowledged and carried forward from previous milestone close:
|
|||||||
|
|
||||||
## Session Continuity
|
## Session Continuity
|
||||||
|
|
||||||
Last session: 2026-05-15 — bootstrap
|
Last session: 2026-05-15T13:40:45.462Z
|
||||||
Stopped at: Wrote PROJECT.md, REQUIREMENTS.md, ROADMAP.md, STATE.md from
|
Stopped at: Phase 1 context gathered
|
||||||
intel synthesis. Coverage validated: 11/11 v1 REQs mapped.
|
intel synthesis. Coverage validated: 11/11 v1 REQs mapped.
|
||||||
Resume file: None — ready for `/gsd-plan-phase 1`.
|
Resume file: .planning/phases/01-stabilize-video-pipeline/01-CONTEXT.md
|
||||||
|
|||||||