docs(state): record phase 1 context session .planning/STATE.md

This commit is contained in:
2026-05-15 15:40:51 +02:00
parent 05f7d1bf64
commit 4909f3155a

View File

@@ -1,3 +1,19 @@
---
gsd_state_version: 1.0
milestone: v2.0.0
milestone_name: milestone
status: planning
stopped_at: Phase 1 context gathered
last_updated: "2026-05-15T13:40:45.486Z"
last_activity: 2026-05-15 — bootstrap from intel synthesis (PROJECT.md,
progress:
total_phases: 5
completed_phases: 0
total_plans: 0
completed_plans: 0
percent: 0
---
# Project State # Project State
## Project Reference ## Project Reference
@@ -22,6 +38,7 @@ Progress: [░░░░░░░░░░] 0%
## Performance Metrics ## Performance Metrics
**Velocity:** **Velocity:**
- Total plans completed: 0 - Total plans completed: 0
- Average duration: — - Average duration: —
- Total execution time: — - Total execution time: —
@@ -37,6 +54,7 @@ Progress: [░░░░░░░░░░] 0%
| 5. Harden + clean up | 0 | — | — | | 5. Harden + clean up | 0 | — | — |
**Recent Trend:** **Recent Trend:**
- Last 5 plans: — - Last 5 plans: —
- Trend: — - Trend: —
@@ -54,6 +72,7 @@ current work:
first attempt to be remediated against the SPEC, not as greenfield. The first attempt to be remediated against the SPEC, not as greenfield. The
7 P0 defects from the audit are split across phases 13 along commit 7 P0 defects from the audit are split across phases 13 along commit
boundaries; phase 4 is end-to-end SPEC §10 smoke verification. boundaries; phase 4 is end-to-end SPEC §10 smoke verification.
- All 12 SPEC decisions (`DEC-001`..`DEC-012`) are LOCKED for Phase 1. - All 12 SPEC decisions (`DEC-001`..`DEC-012`) are LOCKED for Phase 1.
Changing any of them requires a formal ADR; none are formally LOCKED in the Changing any of them requires a formal ADR; none are formally LOCKED in the
ingest classification, so a future ADR can revise. ingest classification, so a future ADR can revise.
@@ -79,7 +98,7 @@ Items acknowledged and carried forward from previous milestone close:
## Session Continuity ## Session Continuity
Last session: 2026-05-15 — bootstrap Last session: 2026-05-15T13:40:45.462Z
Stopped at: Wrote PROJECT.md, REQUIREMENTS.md, ROADMAP.md, STATE.md from Stopped at: Phase 1 context gathered
intel synthesis. Coverage validated: 11/11 v1 REQs mapped. intel synthesis. Coverage validated: 11/11 v1 REQs mapped.
Resume file: None — ready for `/gsd-plan-phase 1`. Resume file: .planning/phases/01-stabilize-video-pipeline/01-CONTEXT.md