docs(04): create phase plan — 7 plans for Phase 4 hardening (audit P1 polish + flake stabilization + SW persistence + visual polish + closure)
Wave structure: - W1 (parallel): 04-01 (Audit P1 polish #11/#14/#15 TDD) + 04-02 (build/CSP hygiene: setimmediate polyfill + dead-code + generate-icons.cjs) - W2: 04-03 (A29 cs-injection-world rewrite; closes flake) - W3: 04-04 (A33 SW state persistence; spike-first + CDP worker.close()) - W4: 04-05 (A34 fetch+XHR network_error; ROADMAP SC #2 + validates Plan 04-01 P1 #11 end-to-end) - W5: 04-06 (dark-logo currentColor + cursor verification + 01-07-SUMMARY back-patch; operator empirical) - W6: 04-07 (04-VERIFICATION.md aggregator + ROADMAP backfill + v1 close prep) Honors locked decisions D-P4-01..05 (full Phase 4 + all 3 P1 polish + both visual items + alpha-independent + ROADMAP backfill). Implements RESEARCH Q1 (setimmediate option a), Q2 (spike-first SW persistence), Q3 (A29 cs-injection-world), Finding 4 (cursor already shipped — verification only). UI-SPEC dark-logo currentColor strategy with inline-SVG injection landed per UI-SPEC §"Implementation amendment". Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
This commit is contained in:
@@ -262,7 +262,14 @@ finalized at plan time):
|
||||
(`permissions.request`, the duplicate offscreen inline string) returns no
|
||||
live references.
|
||||
|
||||
**Plans**: TBD
|
||||
**Plans**: 7 plans (04-01 through 04-07). Wave 1 parallel (04-01 + 04-02) -> Wave 2 sequential (04-03 A29 rewrite -> 04-04 A33 SW persistence -> 04-05 A34 fetch+XHR) -> Wave 5 visual polish (04-06; operator empirical) -> Wave 6 closure (04-07).
|
||||
- [ ] 04-01-PLAN.md — Audit P1 polish #11 + #14 + #15 (TDD; 3 unit tests + 3 src/content/index.ts edits)
|
||||
- [ ] 04-02-PLAN.md — Build/CSP hygiene (setimmediate polyfill replacement + dead-code grep + generate-icons.cjs rename)
|
||||
- [ ] 04-03-PLAN.md — A29 cs-injection-world rewrite (strict-sentinel filter; closes ~1/3 flake)
|
||||
- [ ] 04-04-PLAN.md — A33 SW state persistence (spike-first; 5-min idle + worker.close() CDP; ROADMAP SC #1)
|
||||
- [ ] 04-05-PLAN.md — A34 fetch + XHR network_error empirical (ROADMAP SC #2; validates Plan 04-01 P1 #11 end-to-end)
|
||||
- [ ] 04-06-PLAN.md — Dark-logo currentColor + cursor visibility verification + 01-07-SUMMARY back-patch (UI-SPEC; operator empirical ack)
|
||||
- [ ] 04-07-PLAN.md — Phase 4 closure aggregator + ROADMAP backfill (D-P4-05) + v1 milestone close prep
|
||||
|
||||
## Progress
|
||||
|
||||
@@ -274,4 +281,4 @@ Phases execute in numeric order: 1 → 2 → 3 → 4 → 5.
|
||||
| 1. Stabilize video pipeline | 14/14 | **CLOSED 2026-05-20** via gsd-verifier audit GREEN (17/17 must-haves; commit 586836f); all markers flipped | Functional contract closed 2026-05-19 via Plan 01-13 harness PASS; design/brand contract closed 2026-05-20 via Plan 01-12 brand-fit ack; welcome-tab contract closed 2026-05-20 via Plan 01-10 cycle-2 operator ack "All good" + 5 inter-cycle debug fixes |
|
||||
| 2. Stabilize export pipeline | 0/4 | Plans landed 2026-05-20 (4 plans: Wave 0 RED → Wave 1 Blob URL + meta.urls parallel → Wave 2 harness + operator checkpoint); execution pending | - |
|
||||
| 3. SPEC §10 smoke + DOM/event-log verification | 0/TBD | Not started (absorbed Phase-2 DOM verification per 2026-05-20 re-phasing; ~2-3 plans) | - |
|
||||
| 4. Harden + clean up (optional) | 0/TBD | Not started (deferred backlog: cursor visibility, dark-surface logo, tabs perm gap, ffprobe flakes, ROADMAP backfill, rrweb-version upgrade research, REQ-password-confidentiality v2 candidate) | - |
|
||||
| 4. Harden + clean up (optional) | 0/7 | Plans landed 2026-05-21 (7 plans; 6 waves: W1 parallel pair + W2/3/4 sequential harness chain + W5 visual polish + W6 closure); execution pending | - |
|
||||
|
||||