docs(state): record phase 4 plan-phase closure — iter-2 PASSED + 3 cosmetic advisories fixed
state.record-session CLI bug recurred (status: completed because 23/30 partial
match triggered; restored: status=ready_to_execute). total_plans correctly
bumped 23 → 30 (Phase 1: 14 + Phase 2: 4 + Phase 3: 5 + Phase 4: 7).
Phase 4 plan-phase ceremony complete:
- 7 plans across 6 waves (Wave 1: 04-01+04-02 parallel; Waves 2-6 single-plan)
- Plan-checker iter-1: 2 BLOCKER + 4 WARNING (fixed)
- Plan-checker iter-2: VERIFICATION PASSED with 3 cosmetic advisories
- 3 cosmetic advisories now fixed (commit 3c1280e):
* Dim 11 RESEARCH.md Open Questions (RESOLVED) suffix
* Dim 12 PATTERNS.md:886 DEPRECATED banner citing Plan 04-04 Option B
* VALIDATION.md frontmatter revision count 4 → 5
Phase 4 ready for execution: 7 plans (~30 anticipated files; 7 new test files;
A33+A34 harness extensions; setimmediate polyfill replacement; dead-code grep;
SW state persistence spike+impl; dark-logo currentColor; cursor verification
+ stale-note correction; closure aggregator + ROADMAP backfill).
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
This commit is contained in:
@@ -2,16 +2,16 @@
|
|||||||
gsd_state_version: 1.0
|
gsd_state_version: 1.0
|
||||||
milestone: v2.0.0
|
milestone: v2.0.0
|
||||||
milestone_name: milestone
|
milestone_name: milestone
|
||||||
status: ready_to_plan
|
status: ready_to_execute
|
||||||
stopped_at: Phase 4 UI-SPEC approved (5/6 PASS + 1 FLAG; thin-design-surface; dark-logo currentColor strategy locked); preferences preserved at .plan-phase-preferences.md; ready for /gsd-plan-phase 4
|
stopped_at: "Phase 4 plans cleared (iter-2 PASSED + 3 cosmetic advisories fixed); ready for /gsd-execute-phase 4 (5-min idle SC#1 test on dedicated SKIP_LONG_UAT=0 lane)"
|
||||||
last_updated: "2026-05-21T05:46:34.535Z"
|
last_updated: "2026-05-21T08:21:04.003Z"
|
||||||
last_activity: 2026-05-21
|
last_activity: 2026-05-21
|
||||||
progress:
|
progress:
|
||||||
total_phases: 4
|
total_phases: 4
|
||||||
completed_phases: 3
|
completed_phases: 3
|
||||||
total_plans: 23
|
total_plans: 30
|
||||||
completed_plans: 23
|
completed_plans: 23
|
||||||
percent: 100
|
percent: 77
|
||||||
---
|
---
|
||||||
|
|
||||||
# Project State
|
# Project State
|
||||||
@@ -216,9 +216,9 @@ Items acknowledged and carried forward from previous milestone close:
|
|||||||
|
|
||||||
## Session Continuity
|
## Session Continuity
|
||||||
|
|
||||||
Last session: 2026-05-21T05:46:34.509Z
|
Last session: 2026-05-21T08:21:03.980Z
|
||||||
Stopped at: Phase 4 UI-SPEC approved (5/6 PASS + 1 FLAG; thin-design-surface; dark-logo currentColor strategy locked); preferences preserved at .plan-phase-preferences.md; ready for /gsd-plan-phase 4
|
Stopped at: Phase 4 plans cleared (iter-2 PASSED + 3 cosmetic advisories fixed); ready for /gsd-execute-phase 4 (5-min idle SC#1 test on dedicated SKIP_LONG_UAT=0 lane)
|
||||||
Resume file: .planning/phases/04-harden-clean-up-optional/04-UI-SPEC.md
|
Resume file: .planning/phases/04-harden-clean-up-optional/04-01-PLAN.md
|
||||||
|
|
||||||
Prior session: 2026-05-20T12:54:42.000Z — /gsd-pause-work saved Phase 2 execution-ready handoff (a440c7d); Phase 1 closed end-to-end via verifier audit GREEN (586836f); alpha distribution shipped (dist-archives/mokosh-build-2026-05-20-6dbed91.zip)
|
Prior session: 2026-05-20T12:54:42.000Z — /gsd-pause-work saved Phase 2 execution-ready handoff (a440c7d); Phase 1 closed end-to-end via verifier audit GREEN (586836f); alpha distribution shipped (dist-archives/mokosh-build-2026-05-20-6dbed91.zip)
|
||||||
Earlier session: 2026-05-20T12:00:00.000Z — Plan 01-10 closed via cycle-2 operator ack "All good" + 5 inter-cycle debug fixes + brand-rename follow-up
|
Earlier session: 2026-05-20T12:00:00.000Z — Plan 01-10 closed via cycle-2 operator ack "All good" + 5 inter-cycle debug fixes + brand-rename follow-up
|
||||||
|
|||||||