docs(state): record phase 4 plan-phase closure — iter-2 PASSED + 3 cosmetic advisories fixed

state.record-session CLI bug recurred (status: completed because 23/30 partial
match triggered; restored: status=ready_to_execute). total_plans correctly
bumped 23 → 30 (Phase 1: 14 + Phase 2: 4 + Phase 3: 5 + Phase 4: 7).

Phase 4 plan-phase ceremony complete:
- 7 plans across 6 waves (Wave 1: 04-01+04-02 parallel; Waves 2-6 single-plan)
- Plan-checker iter-1: 2 BLOCKER + 4 WARNING (fixed)
- Plan-checker iter-2: VERIFICATION PASSED with 3 cosmetic advisories
- 3 cosmetic advisories now fixed (commit 3c1280e):
  * Dim 11 RESEARCH.md Open Questions (RESOLVED) suffix
  * Dim 12 PATTERNS.md:886 DEPRECATED banner citing Plan 04-04 Option B
  * VALIDATION.md frontmatter revision count 4 → 5

Phase 4 ready for execution: 7 plans (~30 anticipated files; 7 new test files;
A33+A34 harness extensions; setimmediate polyfill replacement; dead-code grep;
SW state persistence spike+impl; dark-logo currentColor; cursor verification
+ stale-note correction; closure aggregator + ROADMAP backfill).

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
This commit is contained in:
2026-05-21 10:21:44 +02:00
parent 3c1280ed2d
commit 55369b80ad

View File

@@ -2,16 +2,16 @@
gsd_state_version: 1.0 gsd_state_version: 1.0
milestone: v2.0.0 milestone: v2.0.0
milestone_name: milestone milestone_name: milestone
status: ready_to_plan status: ready_to_execute
stopped_at: Phase 4 UI-SPEC approved (5/6 PASS + 1 FLAG; thin-design-surface; dark-logo currentColor strategy locked); preferences preserved at .plan-phase-preferences.md; ready for /gsd-plan-phase 4 stopped_at: "Phase 4 plans cleared (iter-2 PASSED + 3 cosmetic advisories fixed); ready for /gsd-execute-phase 4 (5-min idle SC#1 test on dedicated SKIP_LONG_UAT=0 lane)"
last_updated: "2026-05-21T05:46:34.535Z" last_updated: "2026-05-21T08:21:04.003Z"
last_activity: 2026-05-21 last_activity: 2026-05-21
progress: progress:
total_phases: 4 total_phases: 4
completed_phases: 3 completed_phases: 3
total_plans: 23 total_plans: 30
completed_plans: 23 completed_plans: 23
percent: 100 percent: 77
--- ---
# Project State # Project State
@@ -216,9 +216,9 @@ Items acknowledged and carried forward from previous milestone close:
## Session Continuity ## Session Continuity
Last session: 2026-05-21T05:46:34.509Z Last session: 2026-05-21T08:21:03.980Z
Stopped at: Phase 4 UI-SPEC approved (5/6 PASS + 1 FLAG; thin-design-surface; dark-logo currentColor strategy locked); preferences preserved at .plan-phase-preferences.md; ready for /gsd-plan-phase 4 Stopped at: Phase 4 plans cleared (iter-2 PASSED + 3 cosmetic advisories fixed); ready for /gsd-execute-phase 4 (5-min idle SC#1 test on dedicated SKIP_LONG_UAT=0 lane)
Resume file: .planning/phases/04-harden-clean-up-optional/04-UI-SPEC.md Resume file: .planning/phases/04-harden-clean-up-optional/04-01-PLAN.md
Prior session: 2026-05-20T12:54:42.000Z — /gsd-pause-work saved Phase 2 execution-ready handoff (a440c7d); Phase 1 closed end-to-end via verifier audit GREEN (586836f); alpha distribution shipped (dist-archives/mokosh-build-2026-05-20-6dbed91.zip) Prior session: 2026-05-20T12:54:42.000Z — /gsd-pause-work saved Phase 2 execution-ready handoff (a440c7d); Phase 1 closed end-to-end via verifier audit GREEN (586836f); alpha distribution shipped (dist-archives/mokosh-build-2026-05-20-6dbed91.zip)
Earlier session: 2026-05-20T12:00:00.000Z — Plan 01-10 closed via cycle-2 operator ack "All good" + 5 inter-cycle debug fixes + brand-rename follow-up Earlier session: 2026-05-20T12:00:00.000Z — Plan 01-10 closed via cycle-2 operator ack "All good" + 5 inter-cycle debug fixes + brand-rename follow-up