From 61caf0427337ef99fba1cf6aeaaaadcd9f846b14 Mon Sep 17 00:00:00 2001 From: Mark Date: Thu, 21 May 2026 07:47:10 +0200 Subject: [PATCH] =?UTF-8?q?docs(state):=20record=20phase=204=20UI-SPEC=20s?= =?UTF-8?q?ession=20=E2=80=94=20APPROVED=205/6=20+=201=20FLAG=20non-blocki?= =?UTF-8?q?ng?= MIME-Version: 1.0 Content-Type: text/plain; charset=UTF-8 Content-Transfer-Encoding: 8bit state.record-session CLI bug recurred (status: completed because 23/23 known plans done). Restored: status=ready_to_plan. UI-SPEC.md at: .planning/phases/04-harden-clean-up-optional/04-UI-SPEC.md status: approved · reviewer: gsd-ui-checker · reviewed_at: 2026-05-20 Verdict: 5/6 dimensions PASS + 1 FLAG (Dim 4 inherited type scale exceeds standard thresholds but is locked from Phase 1 operator brand-fit ack 2026-05-20; Phase 4 adds zero new sizes/weights) — non-blocking. Next: /gsd-plan-phase 4 (preferences preserved at .plan-phase-preferences.md auto-deletes when consumed). Co-Authored-By: Claude Opus 4.7 (1M context) --- .planning/STATE.md | 12 ++++++------ 1 file changed, 6 insertions(+), 6 deletions(-) diff --git a/.planning/STATE.md b/.planning/STATE.md index 36844e0..e4e96ac 100644 --- a/.planning/STATE.md +++ b/.planning/STATE.md @@ -3,9 +3,9 @@ gsd_state_version: 1.0 milestone: v2.0.0 milestone_name: milestone status: ready_to_plan -stopped_at: Phase 4 context gathered — full Phase 4 scope locked (5 D-P4-* decisions); ready for /gsd-plan-phase 4 (UI-SPEC gate may trip on 'cursor' or 'logo' keyword; if so, --skip-ui or generate UI-SPEC for the dark-logo work) -last_updated: "2026-05-20T20:17:19.890Z" -last_activity: 2026-05-20 +stopped_at: Phase 4 UI-SPEC approved (5/6 PASS + 1 FLAG; thin-design-surface; dark-logo currentColor strategy locked); preferences preserved at .plan-phase-preferences.md; ready for /gsd-plan-phase 4 +last_updated: "2026-05-21T05:46:34.535Z" +last_activity: 2026-05-21 progress: total_phases: 4 completed_phases: 3 @@ -216,9 +216,9 @@ Items acknowledged and carried forward from previous milestone close: ## Session Continuity -Last session: 2026-05-20T20:17:19.866Z -Stopped at: Phase 4 context gathered — full Phase 4 scope locked (5 D-P4-* decisions); ready for /gsd-plan-phase 4 (UI-SPEC gate may trip on 'cursor' or 'logo' keyword; if so, --skip-ui or generate UI-SPEC for the dark-logo work) -Resume file: .planning/phases/04-harden-clean-up-optional/04-CONTEXT.md +Last session: 2026-05-21T05:46:34.509Z +Stopped at: Phase 4 UI-SPEC approved (5/6 PASS + 1 FLAG; thin-design-surface; dark-logo currentColor strategy locked); preferences preserved at .plan-phase-preferences.md; ready for /gsd-plan-phase 4 +Resume file: .planning/phases/04-harden-clean-up-optional/04-UI-SPEC.md Prior session: 2026-05-20T12:54:42.000Z — /gsd-pause-work saved Phase 2 execution-ready handoff (a440c7d); Phase 1 closed end-to-end via verifier audit GREEN (586836f); alpha distribution shipped (dist-archives/mokosh-build-2026-05-20-6dbed91.zip) Earlier session: 2026-05-20T12:00:00.000Z — Plan 01-10 closed via cycle-2 operator ack "All good" + 5 inter-cycle debug fixes + brand-rename follow-up