docs(01-12): state + roadmap + requirements — Plan 01-12 closure
Plan 01-12 closure documentation sync per the plan's Wave 7 Task 1 spec. Three docs land together as one atomic closure commit per the Plan 01-13 + 01-14 closure cadence convention. STATE.md changes: - status: verifying → executing (Plan 01-10 welcome tab still pending) - stopped_at: Plan 01-14 → Plan 01-12 closed via Wave 7 brand-fit ack 2026-05-20 'all good'; Plan 01-10 remains as final Phase 1 functional plan - last_updated + last_activity: 2026-05-19 → 2026-05-20 - progress.completed_plans: 12 → 13 (13 plans: 01-01..01-09 + 01-11 spike + 01-12 + 01-13 + 01-14; Plan 01-10 pending) - progress.percent: 86 → 93 - "Plan 01-13 closure" header annotated: brand/design ack subsequently closed via Plan 01-12 Wave 7 2026-05-20 - New "Plan 01-12 closure (2026-05-20)" section: 7-wave execution arc with all 10 commit hashes (3fe018bplan-baseline-revision →34a9ce1Wave 0 →f86fd60+abab6e1Wave 1 →7732a30Wave 2 →110cebcWave 3 →468f16dWave 4 →e8d2881Wave 5 →b909c37Wave 6 +865d394pre-checkpoint +f319c7dSUMMARY); R2 Lora substitution; 16 i18n keys; branded icons; BADGE_REC_COLOR #b2543d; chrome.i18n fallback; A18-A22 harness; pre-checkpoint bundle gates per feedback-pre-checkpoint-bundle-gates.md; setimmediate polyfill discovery logged to deferred-items.md (Phase 5 hardening); operator brand-fit ack; Plan 01-13 Task 9 functional closure - "Outstanding Phase 1 gates" updated: Plan 01-13 Task 9 + Plan 01-12 CLOSED; only Plan 01-10 remains - Performance Metrics table: Plan 01-12 entry appended (~10h cumulative; 10 tasks; ~50+ files) - Decisions section: 2 new entries for Plan 01-12 design integration + Plan 01-13 Task 9 closure linkage - Session Continuity: last/prior session updated to 2026-05-20 / 2026-05-19 ROADMAP.md changes: - Phase 1 Plans list: 01-12-PLAN.md entry flipped from [ ] to [x] with full closure annotation (R2 Lora self-host, tokens.css canonical, 16 i18n keys across en+ru, branded Loom icons, manifest i18n, BADGE_REC_COLOR madder #b2543d, chrome.i18n fallback, harness A18-A22, operator brand-fit ack 2026-05-20 'all good') - Phase 1 plan count: 13 → 14 plans (01-01 through 01-14) - Progress table Phase 1 row: 7/7 Complete → 13/14 Executing with closure-status disambiguation (functional via Plan 01-13; design/brand via Plan 01-12; Plan 01-10 welcome tab remains) REQUIREMENTS.md changes: - REQ-install-clean: [ ] Pending → [x] Complete (2026-05-20) with annotation: fresh build clean; zero remote-font CSP errors; branded icons; en+ru manifest:name resolution; operator brand-fit ack - REQ-manifest-permissions: [ ] Pending → [x] Complete (2026-05-20) with annotation: manifest:name + :description + :action.default_title migrated to __MSG_*__ + default_locale='en'; manifest validation PASS; en↔ru parity; permissions DEC-011 baseline UNCHANGED - Traceability table: both requirements moved from Phase 3/4 Pending to "Phase 1 closure via Plan 01-12" Complete - Footer: last-updated 2026-05-15 → 2026-05-20 with annotation noting the requirements flipped at Plan 01-12 closure No code changes; pure documentation closure sync. Closure commit hashes: - SUMMARY:f319c7d(.planning/phases/01-stabilize-video-pipeline/01-12-SUMMARY.md) - State sync: this commit (.planning/STATE.md + .planning/ROADMAP.md + .planning/REQUIREMENTS.md) Phase 1 status post-closure: - Functional contract: CLOSED via Plan 01-13 harness PASS (2026-05-19) - Design/brand contract: CLOSED via Plan 01-12 brand-fit ack (2026-05-20) - Remaining: Plan 01-10 (welcome tab) — operator-facing onboarding surface; canonical src/shared/tokens.css from Plan 01-12 now available for swap-in Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
This commit is contained in:
@@ -70,7 +70,7 @@ directory + `vite.config.ts` inline string + `src/background/`.
|
||||
decoder errors, only expected muxer DTS-monotonicity warnings at segment
|
||||
join boundaries).
|
||||
|
||||
**Plans**: 13 plans (01-01 through 01-13)
|
||||
**Plans**: 14 plans (01-01 through 01-14). Plan 01-10 (welcome tab) is the final remaining functional plan; all other plans complete.
|
||||
- [x] 01-01-PLAN.md — Doc cascade: amend DEC-003 / DEC-010 / RETIRE constraints / swap manifest permissions (D-A1..D-A6)
|
||||
- [x] 01-02-PLAN.md — Wave-0 test infrastructure: Vitest install + 4 RED test files + fixtures placeholder
|
||||
- [x] 01-03-PLAN.md — Offscreen recorder TDD: ring buffer + codec strict-mode + getDisplayMedia + track-ended cleanup; D-13 fallback skeleton pre-staged
|
||||
@@ -82,7 +82,7 @@ directory + `vite.config.ts` inline string + `src/background/`.
|
||||
- [x] 01-09-PLAN.md — Toolbar onClicked direct flow + monitor-only picker + onStartup notification + 3-state badge state machine; closure-by-harness Amendment 2 (Plan 01-13 PASS substitutes for operator UAT)
|
||||
- [ ] 01-10-PLAN.md — Welcome tab (Hero + Loom dial per D-02; first-install onboarding; harness A15-A17)
|
||||
- [x] 01-11-PLAN.md — UAT harness Approach-A spike (PIVOTED to 01-13; carries forward Wave 0 infrastructure + Tier-1 grep gate; falsified hypotheses recorded)
|
||||
- [ ] 01-12-PLAN.md — Design integration (R2 Lora self-host, src/shared/tokens.css canonical, 8 i18n strings + 4 supporting keys, branded Loom icons, manifest i18n; harness A18-A22)
|
||||
- [x] 01-12-PLAN.md — Design integration (R2 Lora self-host, src/shared/tokens.css canonical, 16 i18n keys across en+ru, branded Loom icons replacing Bug A placeholders, manifest i18n + default_locale='en', BADGE_REC_COLOR madder #b2543d, chrome.i18n.getMessage with `|| <const>` fallback, harness A18-A22; operator brand-fit ack 2026-05-20 'all good')
|
||||
- [x] 01-13-PLAN.md — UAT harness via Approach B (extension-internal-page driver + offscreen synthetic stream; 15/15 GREEN; Plan 01-09 functional closure)
|
||||
- [x] 01-14-PLAN.md — Picker narrowing via monitorTypeSurfaces:'include' (Chrome 119+ picker enhancement; A23 harness regression)
|
||||
|
||||
@@ -242,7 +242,7 @@ Phases execute in numeric order: 1 → 2 → 3 → 4 → 5.
|
||||
|
||||
| Phase | Plans Complete | Status | Completed |
|
||||
|-------|----------------|--------|-----------|
|
||||
| 1. Stabilize video pipeline | 7/7 | Complete | 2026-05-15 |
|
||||
| 1. Stabilize video pipeline | 13/14 | Executing (Plan 01-10 welcome tab pending) | Functional contract closed 2026-05-19 via Plan 01-13 harness PASS; design/brand contract closed 2026-05-20 via Plan 01-12 brand-fit ack |
|
||||
| 2. Stabilize DOM + event capture privacy | 0/TBD | Not started | - |
|
||||
| 3. Stabilize export pipeline | 0/TBD | Not started | - |
|
||||
| 4. SPEC §10 smoke verification | 0/TBD | Not started | - |
|
||||
|
||||
Reference in New Issue