docs(01-12): state + roadmap + requirements — Plan 01-12 closure
Plan 01-12 closure documentation sync per the plan's Wave 7 Task 1 spec. Three docs land together as one atomic closure commit per the Plan 01-13 + 01-14 closure cadence convention. STATE.md changes: - status: verifying → executing (Plan 01-10 welcome tab still pending) - stopped_at: Plan 01-14 → Plan 01-12 closed via Wave 7 brand-fit ack 2026-05-20 'all good'; Plan 01-10 remains as final Phase 1 functional plan - last_updated + last_activity: 2026-05-19 → 2026-05-20 - progress.completed_plans: 12 → 13 (13 plans: 01-01..01-09 + 01-11 spike + 01-12 + 01-13 + 01-14; Plan 01-10 pending) - progress.percent: 86 → 93 - "Plan 01-13 closure" header annotated: brand/design ack subsequently closed via Plan 01-12 Wave 7 2026-05-20 - New "Plan 01-12 closure (2026-05-20)" section: 7-wave execution arc with all 10 commit hashes (3fe018bplan-baseline-revision →34a9ce1Wave 0 →f86fd60+abab6e1Wave 1 →7732a30Wave 2 →110cebcWave 3 →468f16dWave 4 →e8d2881Wave 5 →b909c37Wave 6 +865d394pre-checkpoint +f319c7dSUMMARY); R2 Lora substitution; 16 i18n keys; branded icons; BADGE_REC_COLOR #b2543d; chrome.i18n fallback; A18-A22 harness; pre-checkpoint bundle gates per feedback-pre-checkpoint-bundle-gates.md; setimmediate polyfill discovery logged to deferred-items.md (Phase 5 hardening); operator brand-fit ack; Plan 01-13 Task 9 functional closure - "Outstanding Phase 1 gates" updated: Plan 01-13 Task 9 + Plan 01-12 CLOSED; only Plan 01-10 remains - Performance Metrics table: Plan 01-12 entry appended (~10h cumulative; 10 tasks; ~50+ files) - Decisions section: 2 new entries for Plan 01-12 design integration + Plan 01-13 Task 9 closure linkage - Session Continuity: last/prior session updated to 2026-05-20 / 2026-05-19 ROADMAP.md changes: - Phase 1 Plans list: 01-12-PLAN.md entry flipped from [ ] to [x] with full closure annotation (R2 Lora self-host, tokens.css canonical, 16 i18n keys across en+ru, branded Loom icons, manifest i18n, BADGE_REC_COLOR madder #b2543d, chrome.i18n fallback, harness A18-A22, operator brand-fit ack 2026-05-20 'all good') - Phase 1 plan count: 13 → 14 plans (01-01 through 01-14) - Progress table Phase 1 row: 7/7 Complete → 13/14 Executing with closure-status disambiguation (functional via Plan 01-13; design/brand via Plan 01-12; Plan 01-10 welcome tab remains) REQUIREMENTS.md changes: - REQ-install-clean: [ ] Pending → [x] Complete (2026-05-20) with annotation: fresh build clean; zero remote-font CSP errors; branded icons; en+ru manifest:name resolution; operator brand-fit ack - REQ-manifest-permissions: [ ] Pending → [x] Complete (2026-05-20) with annotation: manifest:name + :description + :action.default_title migrated to __MSG_*__ + default_locale='en'; manifest validation PASS; en↔ru parity; permissions DEC-011 baseline UNCHANGED - Traceability table: both requirements moved from Phase 3/4 Pending to "Phase 1 closure via Plan 01-12" Complete - Footer: last-updated 2026-05-15 → 2026-05-20 with annotation noting the requirements flipped at Plan 01-12 closure No code changes; pure documentation closure sync. Closure commit hashes: - SUMMARY:f319c7d(.planning/phases/01-stabilize-video-pipeline/01-12-SUMMARY.md) - State sync: this commit (.planning/STATE.md + .planning/ROADMAP.md + .planning/REQUIREMENTS.md) Phase 1 status post-closure: - Functional contract: CLOSED via Plan 01-13 harness PASS (2026-05-19) - Design/brand contract: CLOSED via Plan 01-12 brand-fit ack (2026-05-20) - Remaining: Plan 01-10 (welcome tab) — operator-facing onboarding surface; canonical src/shared/tokens.css from Plan 01-12 now available for swap-in Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
This commit is contained in:
@@ -120,14 +120,26 @@ Requirements for the Phase 1 SPEC. Each maps to one phase in ROADMAP.md.
|
||||
|
||||
### Manifest & Install
|
||||
|
||||
- [ ] **REQ-manifest-permissions**: `manifest.json` declares exactly the
|
||||
- [x] **REQ-manifest-permissions**: `manifest.json` declares exactly the
|
||||
permission set in DEC-011 (`tabCapture`, `activeTab`, `downloads`, `scripting`,
|
||||
`storage`; `host_permissions: ["<all_urls>"]`) and requests a user gesture
|
||||
for `tabCapture` on first activation. Binding: DEC-011, CON-manifest-permissions.
|
||||
COMPLETED Phase 1 Plan 01-12 (2026-05-20): manifest:name + :description +
|
||||
:action.default_title migrated to `__MSG_*__` placeholders + default_locale='en';
|
||||
manifest validation PASS in pre-checkpoint bundle gates (`tests/i18n/manifest-i18n.test.ts`
|
||||
shape + `tests/i18n/locale-parity.test.ts` en↔ru parity); permissions baseline
|
||||
UNCHANGED (Plan 01-12 added ZERO new permissions). Operator brand-fit ack 2026-05-20.
|
||||
- SPEC §10 acceptance criteria: #1.
|
||||
|
||||
- [ ] **REQ-install-clean**: The extension installs in Chrome without errors
|
||||
via the unpacked-extension load flow.
|
||||
- [x] **REQ-install-clean**: The extension installs in Chrome without errors
|
||||
via the unpacked-extension load flow. COMPLETED Phase 1 Plan 01-12 (2026-05-20):
|
||||
fresh `npm run build` produces clean dist/; load unpacked into Chrome shows
|
||||
manifest:name "Mokosh — Session Capture" (EN) or "Mokosh — Запись сессии" (RU)
|
||||
with no permission warnings, no remote-font CSP errors (0 `googleapis` /
|
||||
0 `https://fonts` in dist/ verified by `tests/build/no-remote-fonts.test.ts`),
|
||||
branded Loom-mark icons rendering at 16/48/128 sizes (8-bit RGBA), and
|
||||
16 i18n keys per locale with en↔ru parity. Operator brand-fit ack 2026-05-20
|
||||
"all good" on the empirical load.
|
||||
- SPEC §10 acceptance criteria: #1.
|
||||
|
||||
### Performance & Security
|
||||
@@ -212,8 +224,8 @@ Which phase covers which requirement. See ROADMAP.md for phase details.
|
||||
| REQ-archive-layout | Phase 3 | Pending |
|
||||
| REQ-meta-json-schema | Phase 3 | Pending |
|
||||
| REQ-archive-export-latency | Phase 3 | Pending |
|
||||
| REQ-manifest-permissions | Phase 3 | Pending |
|
||||
| REQ-install-clean | Phase 4 | Pending |
|
||||
| REQ-manifest-permissions | Phase 3 (originally) → Phase 1 closure via Plan 01-12 i18n migration | Complete (2026-05-20 — manifest __MSG_*__ + default_locale='en' + 16 i18n keys per locale; permissions DEC-011 baseline unchanged; operator brand-fit ack) |
|
||||
| REQ-install-clean | Phase 4 (originally) → Phase 1 closure via Plan 01-12 design integration | Complete (2026-05-20 — fresh build + load unpacked clean; zero remote-font CSP errors; branded icons rendering; en+ru manifest:name resolution; operator brand-fit ack) |
|
||||
|
||||
**Coverage:**
|
||||
- v1 requirements: 11 total
|
||||
@@ -227,4 +239,5 @@ RAM-ceiling check.
|
||||
|
||||
---
|
||||
*Requirements defined: 2026-05-15*
|
||||
*Last updated: 2026-05-15 — REQ-video-ring-buffer marked Complete on Phase 1 closure*
|
||||
*Last updated: 2026-05-20 — REQ-install-clean + REQ-manifest-permissions marked Complete on Plan 01-12 closure (design integration + manifest i18n + operator brand-fit ack)*
|
||||
*Earlier update: 2026-05-15 — REQ-video-ring-buffer marked Complete on Phase 1 (Plan 01-07) closure*
|
||||
|
||||
@@ -70,7 +70,7 @@ directory + `vite.config.ts` inline string + `src/background/`.
|
||||
decoder errors, only expected muxer DTS-monotonicity warnings at segment
|
||||
join boundaries).
|
||||
|
||||
**Plans**: 13 plans (01-01 through 01-13)
|
||||
**Plans**: 14 plans (01-01 through 01-14). Plan 01-10 (welcome tab) is the final remaining functional plan; all other plans complete.
|
||||
- [x] 01-01-PLAN.md — Doc cascade: amend DEC-003 / DEC-010 / RETIRE constraints / swap manifest permissions (D-A1..D-A6)
|
||||
- [x] 01-02-PLAN.md — Wave-0 test infrastructure: Vitest install + 4 RED test files + fixtures placeholder
|
||||
- [x] 01-03-PLAN.md — Offscreen recorder TDD: ring buffer + codec strict-mode + getDisplayMedia + track-ended cleanup; D-13 fallback skeleton pre-staged
|
||||
@@ -82,7 +82,7 @@ directory + `vite.config.ts` inline string + `src/background/`.
|
||||
- [x] 01-09-PLAN.md — Toolbar onClicked direct flow + monitor-only picker + onStartup notification + 3-state badge state machine; closure-by-harness Amendment 2 (Plan 01-13 PASS substitutes for operator UAT)
|
||||
- [ ] 01-10-PLAN.md — Welcome tab (Hero + Loom dial per D-02; first-install onboarding; harness A15-A17)
|
||||
- [x] 01-11-PLAN.md — UAT harness Approach-A spike (PIVOTED to 01-13; carries forward Wave 0 infrastructure + Tier-1 grep gate; falsified hypotheses recorded)
|
||||
- [ ] 01-12-PLAN.md — Design integration (R2 Lora self-host, src/shared/tokens.css canonical, 8 i18n strings + 4 supporting keys, branded Loom icons, manifest i18n; harness A18-A22)
|
||||
- [x] 01-12-PLAN.md — Design integration (R2 Lora self-host, src/shared/tokens.css canonical, 16 i18n keys across en+ru, branded Loom icons replacing Bug A placeholders, manifest i18n + default_locale='en', BADGE_REC_COLOR madder #b2543d, chrome.i18n.getMessage with `|| <const>` fallback, harness A18-A22; operator brand-fit ack 2026-05-20 'all good')
|
||||
- [x] 01-13-PLAN.md — UAT harness via Approach B (extension-internal-page driver + offscreen synthetic stream; 15/15 GREEN; Plan 01-09 functional closure)
|
||||
- [x] 01-14-PLAN.md — Picker narrowing via monitorTypeSurfaces:'include' (Chrome 119+ picker enhancement; A23 harness regression)
|
||||
|
||||
@@ -242,7 +242,7 @@ Phases execute in numeric order: 1 → 2 → 3 → 4 → 5.
|
||||
|
||||
| Phase | Plans Complete | Status | Completed |
|
||||
|-------|----------------|--------|-----------|
|
||||
| 1. Stabilize video pipeline | 7/7 | Complete | 2026-05-15 |
|
||||
| 1. Stabilize video pipeline | 13/14 | Executing (Plan 01-10 welcome tab pending) | Functional contract closed 2026-05-19 via Plan 01-13 harness PASS; design/brand contract closed 2026-05-20 via Plan 01-12 brand-fit ack |
|
||||
| 2. Stabilize DOM + event capture privacy | 0/TBD | Not started | - |
|
||||
| 3. Stabilize export pipeline | 0/TBD | Not started | - |
|
||||
| 4. SPEC §10 smoke verification | 0/TBD | Not started | - |
|
||||
|
||||
@@ -2,16 +2,16 @@
|
||||
gsd_state_version: 1.0
|
||||
milestone: v2.0.0
|
||||
milestone_name: milestone
|
||||
status: verifying
|
||||
stopped_at: Completed Plan 01-14 (commit b467123 + SUMMARY 5254145; 16/16 UAT + 100/100 vitest GREEN)
|
||||
last_updated: "2026-05-19T19:41:05.778Z"
|
||||
last_activity: 2026-05-19
|
||||
status: executing
|
||||
stopped_at: Plan 01-12 closed via Wave 7 operator brand-fit ack 2026-05-20 'all good' (147/147 vitest, 21/21 UAT GREEN); Plan 01-10 (welcome tab) remains as final Phase 1 functional plan
|
||||
last_updated: "2026-05-20T08:00:00.000Z"
|
||||
last_activity: 2026-05-20
|
||||
progress:
|
||||
total_phases: 5
|
||||
completed_phases: 0
|
||||
total_plans: 14
|
||||
completed_plans: 12
|
||||
percent: 86
|
||||
completed_plans: 13
|
||||
percent: 93
|
||||
---
|
||||
|
||||
# Project State
|
||||
@@ -27,15 +27,37 @@ no server, no password leaks.
|
||||
|
||||
## Current Position
|
||||
|
||||
Phase: 1 of 5 (Stabilize Video Pipeline) — Plan 01-09 closed-by-harness 2026-05-19; awaiting Plan 01-13 operator brand/design ack + Plan 01-10 welcome tab + Plan 01-12 design integration (designer reply pending)
|
||||
Phase: 1 of 5 (Stabilize Video Pipeline) — Plan 01-12 closed-by-brand-fit-ack 2026-05-20; Plan 01-13 closed-by-harness 2026-05-19; awaiting Plan 01-10 (welcome tab) as final Phase 1 functional plan
|
||||
Next phase: 2 of 5 (Stabilize DOM + event-capture privacy)
|
||||
Plan: 11 of 10 complete (counter > total because Plans 01-11 spike-pivot + 01-13 harness were added mid-phase past the original 10-plan ceiling; ROADMAP.md plan count needs sync as separate concern)
|
||||
Status: Phase complete — ready for verification
|
||||
Last activity: 2026-05-19
|
||||
Plan: 13 of 13 complete (13 plans: 01-01..01-09 + 01-11 spike + 01-12 + 01-13 + 01-14; Plan 01-10 still pending)
|
||||
Status: Executing — Plan 01-10 (welcome tab) remains
|
||||
Last activity: 2026-05-20
|
||||
|
||||
Progress: [█████████░] 86%
|
||||
Progress: [█████████▓] 93%
|
||||
|
||||
### Plan 01-13 closure (2026-05-19)
|
||||
### Plan 01-12 closure (2026-05-20)
|
||||
|
||||
- Design integration landed end-to-end across 7 waves (10 plan tasks + 1 operator empirical checkpoint)
|
||||
- 9 implementation commits: `3fe018b` (plan baseline revision post-01-14) → `34a9ce1` (Wave 0 RED scaffolds) → `f86fd60` + `abab6e1` (Wave 1 fonts + tokens.css) → `7732a30` (Wave 2 icons) → `110cebc` (Wave 3 manifest i18n + _locales) → `468f16d` (Wave 4 source adoption) → `e8d2881` (Wave 5 Vite define + welcome conditional) → `b909c37` (Wave 6 A18-A22) + 1 pre-checkpoint commit `865d394`
|
||||
- SUMMARY: `f319c7d` (`.planning/phases/01-stabilize-video-pipeline/01-12-SUMMARY.md`)
|
||||
- **R2 designer substitution**: Newsreader → Lora (Cyreal foundry; OFL-1.1; full Latin + Cyrillic) per designer reply 2026-05-19. Canonical token value `--mks-font-display: "Lora", "Iowan Old Style", "Times New Roman", serif`.
|
||||
- **MV3 CSP self-host invariant verified**: zero `googleapis` / `https://fonts` references in `dist/` (per `tests/build/no-remote-fonts.test.ts`); 8 local @font-face rules in `src/shared/tokens.css`; ~155 KB font bundle ships under `src/shared/fonts/` with LICENSE + README attribution.
|
||||
- **16 i18n keys across `_locales/{en,ru}/messages.json`**: extName + extDesc + tooltipOff + tooltipRecPrefix + tooltipErr + popupSavePrompt + popupSaveCta + popupSaveDone + popupSaving + popupSaveDoneShort + popupEmptyState + popupInfoText + notifStartup + notifRecovery + welcomeHeroRu + welcomeHeroEn. EN extName = "Mokosh — Session Capture" (D-07); EN extDesc = "Thirty seconds ago, always at hand." (D-08); RU extName = "Mokosh — Запись сессии"; RU extDesc = "Тридцать секунд назад, всегда под рукой." en↔ru parity verified by `tests/i18n/locale-parity.test.ts`.
|
||||
- **Branded Loom-mark icons** (D-01): 8-bit RGBA via `rsvg-convert`; replaces Bug A placeholders (was 16-bit RGB at 574/1153/2615 B; now 406/784/1952 B 8-bit RGBA). Clears Chrome imageUtil silent-rejection floors (16≥200B, 48≥500B, 128≥1024B).
|
||||
- **BADGE_REC_COLOR** flipped from material-green `#00C853` to madder `#b2543d` (= --mks-madder-600 per D-04 loom palette).
|
||||
- **src/popup/style.css** carries ZERO hex literals (every color via `var(--mks-*)`); imports `../shared/tokens.css`. src/popup/index.ts + src/background/index.ts read `chrome.i18n.getMessage('<key>') || '<en-const-fallback>'` at every operator-facing site.
|
||||
- **UAT harness A18-A22** following Plan 01-13 Approach B pattern (page-side `assertA*` + host-side `driveA*` + harness orchestrator). FORBIDDEN_HOOK_STRINGS at 13 entries (+1 over 01-14's 12 baseline for `data-mks-key` completeness). Full A1-A14 + A18-A22 + A23 chain runs in ~95s under Puppeteer headless.
|
||||
- **Pre-checkpoint bundle gates** per feedback-pre-checkpoint-bundle-gates.md established: SW CSP grep (new Function/eval) + SW Node-globals grep (Buffer.*) + DOM-globals grep + manifest validation + en↔ru parity. Discovery: setimmediate polyfill `new Function` in SW chunk via `vite-plugin-node-polyfills` — VERIFIED pre-existing across Phase 1 history; NOT a Plan 01-12 regression; logged at `.planning/phases/01-stabilize-video-pipeline/deferred-items.md` for Phase 5 hardening.
|
||||
- **vitest: 100 → 147 GREEN** (+47 across 6 new test files at tests/build/ + tests/i18n/).
|
||||
- **UAT harness: 16/16 → 21/21 GREEN** (A18-A22 added; A22 skip-gates on Plan 01-10 absent).
|
||||
- **Operator empirical brand-fit ack 2026-05-20 verbatim "all good"** on fresh build + load unpacked + branded-surface verification (toolbar Loom icon, popup loom palette + Lora display heading, manifest:name resolution to "Mokosh — Session Capture", Russian copy rendering with Lora, notification copy via chrome.i18n).
|
||||
- **Plan 01-13 Task 9 (operator brand/design ack on loaded extension) functionally CLOSED** via this checkpoint — same operator + same empirical surface coverage; the LAST remaining Phase 1 brand-design gate.
|
||||
|
||||
### Outstanding Phase 1 gates
|
||||
|
||||
- **Plan 01-10 (welcome tab):** still pending — operator-facing onboarding surface (Russian copy; first-run only). Canonical `src/shared/tokens.css` from Plan 01-12 is now available for swap-in (no placeholder welcome-tokens.css needed). When Plan 01-10 lands, harness A22 flips from skip-gate to 1-check GREEN.
|
||||
|
||||
### Plan 01-13 closure (2026-05-19; brand/design ack subsequently closed via Plan 01-12 Wave 7 2026-05-20)
|
||||
|
||||
- Puppeteer-based UAT harness: `npm run test:uat` exits 0 with **15/15 GREEN** (A0-A14)
|
||||
- Bug A regression rewind empirically verified (commit body 6a77967)
|
||||
@@ -59,9 +81,9 @@ Progress: [█████████░] 86%
|
||||
|
||||
### Outstanding Phase 1 gates
|
||||
|
||||
- **Plan 01-13 Task 9 (operator checkpoint):** orchestrator-owned; brand/design ack on loaded extension (Plan 01-13 charter carves visual presentation out of harness scope)
|
||||
- **Plan 01-10 (welcome tab):** Wave 3 still pending — operator-facing onboarding surface (Russian copy; first-run only)
|
||||
- **Plan 01-12 (design integration):** awaiting designer reply on Newsreader typography (one designer follow-up already documented in MEMORY intel-unlock f768498 — Newsreader has no Cyrillic glyphs, alternative font selection pending)
|
||||
- ~~**Plan 01-13 Task 9 (operator checkpoint):**~~ CLOSED 2026-05-20 via Plan 01-12 Wave 7 brand-fit ack "all good"
|
||||
- ~~**Plan 01-12 (design integration):**~~ CLOSED 2026-05-20 (R2 Lora substitution + tokens.css canonical + 16 i18n keys + branded icons + manifest i18n; SUMMARY f319c7d)
|
||||
- **Plan 01-10 (welcome tab):** still pending — operator-facing onboarding surface (Russian copy; first-run only). Canonical `src/shared/tokens.css` from Plan 01-12 is now available for swap-in.
|
||||
|
||||
## Performance Metrics
|
||||
|
||||
@@ -95,6 +117,7 @@ Progress: [█████████░] 86%
|
||||
| Phase 1 P06 | 3min | 2 tasks | 2 files |
|
||||
| Phase 1 P07 | ~10min closure + 2 debug sessions (D-12 + A3) | 2 tasks (checkpoint + auto) | 6 files (fixture + REQUIREMENTS + ROADMAP + STATE + SUMMARY + plan-final-commit) |
|
||||
| Phase 01 P14 | 49m | 1 tasks | 7 files |
|
||||
| Phase 01 P12 | ~10h cumulative (7 waves; 10 plan tasks + 1 operator empirical checkpoint) | 10 tasks (7 waves + Wave 7 pre-checkpoint + brand-fit ack) | ~50+ files (8 WOFF2 + 3 PNG + 2 _locales + tokens.css + 6 unit-test files + harness + scripts + 4 source files modified) |
|
||||
|
||||
## Accumulated Context
|
||||
|
||||
@@ -136,6 +159,8 @@ current work:
|
||||
- [Phase 01-07-closure]: Phase 1 closed 2026-05-15: D-12 + A3 acceptance gates both passed. Operator-confirmed Chrome playback clean (no ~1 s freeze); ffmpeg `-v warning -i tests/fixtures/last_30sec.webm -f null -` exit 0 with zero decoder errors (only expected muxer DTS-monotonicity warnings at segment join boundaries — non-blocking, documented D-13 trade-off for multi-EBML-header concat); ffprobe + empirical playback both green; 30/30 vitest green (the 2 webm-playback empirical dry-runs flipped GREEN after the fresh fixture committed in cd61cbc); REQ-video-ring-buffer marked Complete; SPEC §10 #2, #3, #7 functionally satisfied (end-to-end Phase 4 smoke still owns the full §10 sweep). Three atomic closure commits land the fixture + REQ/STATE/ROADMAP flip + SUMMARY. Process note: Plan 01-07 surfaced TWO unanticipated-cascade failures (D-12 then A3); both had pre-staged fallbacks (base64 wire-format and D-13 restart-segments) that activated cleanly. Candidate retro: should `/gsd-plan-phase` auto-inject empirical-acceptance gates (ffmpeg dry-run + Chrome playback) before merging a phase when RESEARCH.md flags HIGH-risk assumptions?
|
||||
- [Phase 01-07-deferred-to-5]: getDisplayMedia cursor visibility constraint (`video: { cursor: 'always' }`) surfaced as a user observation during Phase 1 smoke 2026-05-15. Captured frames lack the screen cursor despite it being the highest-signal cue for reproducing pointer-driven bugs. Constraint is opt-in per the getDisplayMedia spec; Chrome implements CursorCaptureConstraint (always/motion/never). Logged to Phase 5 P1/P2 hardening list — not blocking Phase 1 closure.
|
||||
- [Phase ?]: Plan 01-14 — monitorTypeSurfaces:'include' shipped as top-level DisplayMediaStreamOptions constraint (W3C spec §6.1; Chrome ≥ 119 picker narrowing); A23 harness gate + Tier-1 grep lockstep extension to 12 strings; 100/100 vitest + 16/16 UAT GREEN. types.ts NOT modified — new cell/op are module-internal.
|
||||
- [Phase 01-12]: Design integration landed end-to-end via 7 waves + operator brand-fit ack 2026-05-20 "all good". R2 designer substitution (Newsreader → Lora; Cyreal foundry; OFL-1.1; full Cyrillic via reply 2026-05-19) baked in; src/shared/tokens.css canonical with 8 local @font-face rules + zero remote URLs (MV3 CSP self-host invariant); 16 i18n keys per locale across en + ru with parity; branded Loom-mark icons replace Bug A placeholders (8-bit RGBA); src/popup + src/background migrated to chrome.i18n.getMessage with `|| <const>` fallback; BADGE_REC_COLOR flipped from material-green #00C853 to madder #b2543d (= --mks-madder-600 per D-04). UAT harness A18-A22 GREEN. Pre-checkpoint bundle gates established per feedback-pre-checkpoint-bundle-gates.md (5 grep gates pre-checkpoint; setimmediate polyfill new Function in SW chunk verified pre-existing across Phase 1 history — logged to deferred-items.md for Phase 5 hardening). vitest 100 → 147 GREEN (+47); UAT 16 → 21 GREEN (+A18-A22; A22 skip-gates on Plan 01-10 absent).
|
||||
- [Phase 01-12]: Plan 01-13 Task 9 (operator brand/design ack on loaded extension) functionally closed via Plan 01-12 Wave 7 brand-fit ack 2026-05-20 (same operator + same empirical surface coverage). This was the LAST remaining Phase 1 brand-design gate.
|
||||
|
||||
### Pending Todos
|
||||
|
||||
@@ -158,11 +183,12 @@ Items acknowledged and carried forward from previous milestone close:
|
||||
|
||||
## Session Continuity
|
||||
|
||||
Last session: 2026-05-19T19:41:05.737Z
|
||||
Stopped at: Completed Plan 01-14 (commit b467123 + SUMMARY 5254145; 16/16 UAT + 100/100 vitest GREEN)
|
||||
Last session: 2026-05-20T08:00:00.000Z
|
||||
Stopped at: Plan 01-12 closed via Wave 7 operator brand-fit ack 2026-05-20 'all good' (SUMMARY f319c7d; 147/147 vitest + 21/21 UAT GREEN); Plan 01-10 (welcome tab) remains as final Phase 1 functional plan
|
||||
Resume file: None
|
||||
|
||||
Prior session: 2026-05-17T14:30:13Z — resumed from /gsd-pause-work checkpoint ed82fd6; Bug A icons (a881bf0) + intel-unlock (f768498) committed; /gsd-debug spawned for Bug B state-machine routing (subsequently resolved via the recovery-flow amendment at Plan 01-09 Task 5 step 11)
|
||||
Prior session: 2026-05-19T19:41:05.737Z — Completed Plan 01-14 (commit b467123 + SUMMARY 5254145; 16/16 UAT + 100/100 vitest GREEN)
|
||||
Earlier session: 2026-05-17T14:30:13Z — resumed from /gsd-pause-work checkpoint ed82fd6; Bug A icons (a881bf0) + intel-unlock (f768498) committed; /gsd-debug spawned for Bug B state-machine routing (subsequently resolved via the recovery-flow amendment at Plan 01-09 Task 5 step 11)
|
||||
|
||||
## Phase 1 Closure Notes
|
||||
|
||||
|
||||
Reference in New Issue
Block a user