docs(roadmap): re-phase milestone — remove Phase 2 (DOM/event-capture privacy)
Per operator charter shift 2026-05-20: "we don't care about privacy hardening.
At least here." Archive flow is internal-only (no external transmission),
which reframes the password-masking P0-5 defect from privacy-regulation
gravity to operator-hygiene polish.
Re-phasing applied across 4 planning artifacts:
ROADMAP.md:
- Original Phase 2 ("Stabilize DOM + event-capture privacy") REMOVED entirely
(summary list + Phase Details section + Progress table row).
- DOM + event-log VERIFICATION (REQ-rrweb-dom-buffer + REQ-user-event-log)
ABSORBED by new Phase 3 (SPEC §10 smoke verification).
- Phase numbering: old 3 → new 2 (export), old 4 → new 3 (smoke), old 5 → new 4
(optional harden). Dependency chains updated accordingly.
- Overview blurb + journey narrative + success criteria refreshed.
- Phase 3 (smoke) explicitly NOT-in-scope: P0-5 password masking dropped.
REQUIREMENTS.md traceability:
- REQ-rrweb-dom-buffer: Phase 2 → Phase 3 (verification scope; UAT harness
A24+ extension planned).
- REQ-user-event-log: Phase 2 → Phase 3 (same context).
- REQ-password-confidentiality: Phase 2 → Out of Scope (v1) — DEFERRED per
charter shift.
- REQ-popup-ui, REQ-screenshot-on-export, REQ-archive-layout,
REQ-meta-json-schema, REQ-archive-export-latency: Phase 3 → Phase 2
(renumbered; substantively shipped via Plans 01-08 + 01-09 + 01-12;
residual gaps in Phase 2).
- Coverage: 10 mapped + 1 out-of-scope (was 11 mapped).
PROJECT.md:
- CON-sensitive-data-masking: DEFERRED 2026-05-20 (preserves audit trail
via strikethrough; rationale documented).
- DEC-004 amendment: rrweb 5000-event cap retained; masking deferred. Cites
rrweb 2.0.0-alpha.4 maskInputSelector→maskInputFn API change.
STATE.md:
- frontmatter total_phases: 5 → 4.
- stopped_at narrative captures the re-phasing event.
CLI bug note: this re-phasing was attempted via `gsd-sdk query phase.remove 2`
+ canonical `/gsd-remove-phase 2` Skill invocation, but BOTH paths produced
corrupted output (cascading rename via reverse-iteration loop at
phase.cjs:670-679 collapsed all subsequent phases to "Phase 2", plus a
mysterious "2026"→"2002" date corruption). Recovery applied as manual edits
in this commit. CLI bug logged as upstream GSD-framework concern; not a
Mokosh-side issue.
Plan: next is `/gsd-discuss-phase 2` (new Phase 2 = export pipeline; narrowed
scope per re-phasing — ~2-3 plans expected since Plans 01-08 + 01-09 + 01-10
+ 01-12 already shipped most surface).
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
This commit is contained in:
@@ -216,21 +216,27 @@ Which phase covers which requirement. See ROADMAP.md for phase details.
|
||||
| Requirement | Phase | Status |
|
||||
|-------------|-------|--------|
|
||||
| REQ-video-ring-buffer | Phase 1 | Complete 2026-05-20 (Plans 01-08 WebM remux + 01-14 monitorTypeSurfaces; verified via gsd-verifier audit; fixture `tests/fixtures/last_30sec.webm` ffprobe + ffmpeg dry-run GREEN; Chrome playback confirmed) |
|
||||
| REQ-rrweb-dom-buffer | Phase 2 | Pending |
|
||||
| REQ-user-event-log | Phase 2 | Pending |
|
||||
| REQ-password-confidentiality | Phase 2 | Pending |
|
||||
| REQ-popup-ui | Phase 3 | Pending |
|
||||
| REQ-screenshot-on-export | Phase 3 | Pending |
|
||||
| REQ-archive-layout | Phase 3 | Pending |
|
||||
| REQ-meta-json-schema | Phase 3 | Pending |
|
||||
| REQ-archive-export-latency | Phase 3 | Pending |
|
||||
| REQ-rrweb-dom-buffer | Phase 2 (originally) → **Phase 3** (post-2026-05-20 re-phasing) | Pending (verification absorbed by smoke phase; UAT harness A24+ extension planned) |
|
||||
| REQ-user-event-log | Phase 2 (originally) → **Phase 3** (post-2026-05-20 re-phasing) | Pending (same verification context as REQ-rrweb-dom-buffer) |
|
||||
| REQ-password-confidentiality | Phase 2 (originally) → **Out of Scope (v1)** | DEFERRED per 2026-05-20 charter shift ("we don't care about privacy hardening. At least here.") — archive flow is internal-only (no external transmission); P0-5 password masking re-classified as Phase 4 optional hardening or v2 work |
|
||||
| REQ-popup-ui | Phase 3 (originally) → **Phase 2** (renumbered) | Pending (largely shipped via Plan 01-09 SAVE-only popup + Plan 01-12 i18n; residual gaps in Phase 2) |
|
||||
| REQ-screenshot-on-export | Phase 3 (originally) → **Phase 2** (renumbered) | Pending |
|
||||
| REQ-archive-layout | Phase 3 (originally) → **Phase 2** (renumbered) | Pending (substantively shipped via Plans 01-08 webm-remux + JSZip; verification in Phase 2) |
|
||||
| REQ-meta-json-schema | Phase 3 (originally) → **Phase 2** (renumbered) | Pending |
|
||||
| REQ-archive-export-latency | Phase 3 (originally) → **Phase 2** (renumbered) | Pending |
|
||||
| REQ-manifest-permissions | Phase 3 (originally) → Phase 1 closure via Plan 01-12 i18n migration | Complete (2026-05-20 — manifest __MSG_*__ + default_locale='en' + 16 i18n keys per locale; permissions DEC-011 baseline unchanged; operator brand-fit ack) |
|
||||
| REQ-install-clean | Phase 4 (originally) → Phase 1 closure via Plan 01-12 design integration | Complete (2026-05-20 — fresh build + load unpacked clean; zero remote-font CSP errors; branded icons rendering; en+ru manifest:name resolution; operator brand-fit ack) |
|
||||
|
||||
**Coverage:**
|
||||
- v1 requirements: 11 total
|
||||
- Mapped to phases: 11
|
||||
- Mapped to phases: 10 (REQ-password-confidentiality deferred to Out of Scope v1 per 2026-05-20)
|
||||
- Unmapped: 0 ✓
|
||||
- Out of Scope: 1 (REQ-password-confidentiality)
|
||||
|
||||
**2026-05-20 re-phasing note:** Original Phase 2 ("Stabilize DOM + event-capture
|
||||
privacy") REMOVED entirely. REQ-rrweb-dom-buffer + REQ-user-event-log
|
||||
verification ABSORBED by new Phase 3 (SPEC §10 smoke + DOM/event-log). All
|
||||
subsequent phases renumbered: old 3 → new 2, old 4 → new 3, old 5 → new 4.
|
||||
|
||||
Note on CON-ram-ceiling (SPEC §10 #9): tracked as a non-functional constraint
|
||||
verified in Phase 4 (smoke verification) rather than as a standalone
|
||||
|
||||
Reference in New Issue