From 6dca46529bdab2bbdc605dcfb532a510e41cb6c9 Mon Sep 17 00:00:00 2001 From: Mark Date: Sun, 17 May 2026 16:30:54 +0200 Subject: [PATCH] =?UTF-8?q?chore(01-09):=20resume=20from=20pause=20?= =?UTF-8?q?=E2=80=94=20sync=20STATE.md,=20remove=20HANDOFF.json?= MIME-Version: 1.0 Content-Type: text/plain; charset=UTF-8 Content-Transfer-Encoding: 8bit HANDOFF.json artifact consumed per /gsd-resume-work workflow (one-shot resumption pointer). STATE.md synced forward to reflect true mid-Plan-01-09 state — status flipped planning→executing, progress 90→92, Current Position now shows Phase 1 REOPENED with Plan 01-09 Bug B pending and Plan 01-10 Wave 3 pending. Session continuity records: - Pause checkpoint commit: ed82fd6 - Bug A icons commit: a881bf0 - Intel docs unlock commit: f768498 - Next: /gsd-debug session for Bug B state-machine routing Co-Authored-By: Claude Opus 4.7 (1M context) --- .planning/HANDOFF.json | 80 ------------------------------------------ .planning/STATE.md | 28 +++++++-------- 2 files changed, 14 insertions(+), 94 deletions(-) delete mode 100644 .planning/HANDOFF.json diff --git a/.planning/HANDOFF.json b/.planning/HANDOFF.json deleted file mode 100644 index 0761e73..0000000 --- a/.planning/HANDOFF.json +++ /dev/null @@ -1,80 +0,0 @@ -{ - "version": "1.0", - "timestamp": "2026-05-17T14:04:15Z", - "phase": "01", - "phase_name": "stabilize-video-pipeline", - "phase_dir": ".planning/phases/01-stabilize-video-pipeline", - "wave": 2, - "plan": "01-09", - "status": "paused", - "completed_this_session": [ - {"id": "01-08", "name": "WebM remux via ts-ebml + webm-muxer", "status": "done", "commit_range": "5035314..e40949d", "notes": "Includes resolve.alias ebml CJS-main + vite-plugin-node-polyfills Buffer fix from debug session 01-08-sw-incompatibility (resolved). Tier-1 SW-bundle-import gate added at tests/background/sw-bundle-import.test.ts (2-layer)."}, - {"id": "01-09-task1to4", "name": "Plan 01-09 Tasks 1-4: displaySurface monitor + cursor:always + toolbar onClicked + badge state machine + onStartup notification + popup SAVE-only", "status": "done", "commit_range": "333e0dc..c711d7e", "notes": "Task 5 operator empirical revealed 2 bugs — see remaining_work."}, - {"id": "design-intel", "name": "Design system + assets spec for designer team handoff", "status": "done", "commit": "949aa03", "files": [".planning/intel/design-system.md", ".planning/intel/assets-spec.md"]} - ], - "remaining_tasks": [ - { - "id": "01-09-bug-fix", - "name": "Fix Plan 01-09 Bug B: route user-stopped-sharing → setIdleMode (not setErrorMode)", - "status": "not_started", - "details": "Per debug session 01-09-recovery-flow (NOT YET WRITTEN to disk — exists only in session context). Operator UAT surfaced: after clicking Chrome's Stop Sharing, badge stuck on ERROR (yellow), popup is SAVE-only, no recovery notification (Bug A icon failure), operator locked out of restart. Fix: switch RECORDING_ERROR handler in src/background/index.ts:725-744 on message.error code — 'user-stopped-sharing' → setIdleMode; other codes → setErrorMode (preserved). The onUserStoppedSharing handler in src/offscreen/recorder.ts:451-480 already calls resetBuffer() so there's nothing to save → IDLE is correct. Needs RED test before GREEN fix.", - "resume_with": "/gsd-debug continue 01-09-recovery-flow (if continuation works) OR /gsd-debug 'Plan 01-09 setErrorMode locks operator out — route user-stopped-sharing to setIdleMode' (fresh)" - }, - { - "id": "01-09-icon-placeholders-commit", - "name": "Commit auto-generated icon placeholders (Bug A unblock)", - "status": "uncommitted_in_working_tree", - "details": "Generated via imagemagick (dark-square + green-dot) at icons/icon{16,48,128}.png. Sizes 574/1153/2615 bytes — all above the Chrome notification API minimums. Working tree has them uncommitted. They unblock operator UAT; designer team's branded assets later swap in cleanly. Commit message should reference .planning/intel/assets-spec.md Path A.", - "resume_with": "git add icons/icon{16,48,128}.png && commit per Path A in assets-spec.md" - }, - { - "id": "01-09-uat-re-run", - "name": "Re-run smoke after Bug B fix + placeholder commit to verify full flow", - "status": "not_started", - "details": "Pre-checkpoint gates should be run FIRST (per saved memory feedback-pre-checkpoint-bundle-gates.md). Then operator: Chrome smoke, click Stop Sharing, verify badge → OFF + toolbar.onClicked re-fires for restart + recovery notification visible with placeholder icon." - }, - { - "id": "01-10", - "name": "Plan 01-10 onboarding welcome tab", - "status": "pending", - "details": "Wave 3. depends_on: [01-09]. Unblocked once 01-09 closes. Plan exists at .planning/phases/01-stabilize-video-pipeline/01-10-PLAN.md.", - "resume_with": "/gsd-execute-phase 1 (continues from where Wave 2 closes)" - }, - { - "id": "verify", - "name": "/gsd-verify-work 1 goal-backward verification", - "status": "not_started", - "resume_with": "/gsd-verify-work 1" - }, - { - "id": "phase-close", - "name": "Flip Phase 1 closure markers back to Complete after UAT genuinely passes", - "status": "not_started", - "details": "REQUIREMENTS.md REQ-video-ring-buffer [ ] → [x]; ROADMAP Phase 1 [ ] → [x]; STATE.md status phase_reopened → phase_complete; progress 90% → 100%. Currently STATE.md is partially mid-pause state per the file modification I see." - } - ], - "uncommitted_files": [ - {"path": ".planning/STATE.md", "reason": "Auto-modified by session continuity logic; needs cleanup as part of phase closure or pause commit"}, - {"path": "icons/icon128.png", "reason": "Plan 01-09 Bug A placeholder unblock (auto-generated 2615 bytes); commit as part of 01-09 closure"}, - {"path": "icons/icon16.png", "reason": "Plan 01-09 Bug A placeholder unblock (574 bytes)"}, - {"path": "icons/icon48.png", "reason": "Plan 01-09 Bug A placeholder unblock (1153 bytes)"}, - {"path": "tests/fixtures/last_30sec.webm", "reason": "Operator's recent smoke run staged this; LIKELY needs revert (the committed one in e40949d is the Plan 01-08 closeout fixture). Verify: git diff tests/fixtures/last_30sec.webm to see if it differs from HEAD; if yes, restore via git checkout."} - ], - "blockers": [], - "human_actions_pending": [ - "Designer team to produce branded icons per .planning/intel/assets-spec.md (Priority 0). Placeholder icons unblock Plan 01-09 closeout in the meantime." - ], - "decisions_this_session": [ - {"decision": "Plan 01-08 WebM remux landed via ts-ebml@3.0.2 + webm-muxer@5.1.4 with two-stage fix (resolve.alias + Buffer polyfill via vite-plugin-node-polyfills)", "rationale": "ts-ebml has known browser incompatibility (issue #37, 5 years open). Vite/Rollup CJS interop initially tree-shook ebml; resolve.alias to CJS main entry fixed module-init. Buffer polyfill via vite-plugin-node-polyfills fixed runtime EBMLDecoder.constructor that calls Buffer.alloc(0)."}, - {"decision": "smoke.sh diagnostic timer overlay (T+/wall) added", "rationale": "Operator's 'video isn't latest' observation needed precise measurement. Timer in every recorded frame lets operator compute (save-click value − last-frame value) = stale gap. Confirmed D-13 trade-off (~5-10s gap) empirically."}, - {"decision": "Two test fixtures: last_30sec.webm (post-remux output) + raw-3ebml-concat.webm (pre-remux input)", "rationale": "Plan 01-08 originally used last_30sec.webm as both remux INPUT and OUTPUT validation target. Once remux works, the fixture is the OUTPUT only. Unit tests need the INPUT format. Split fixtures resolves the conflict."}, - {"decision": "Auto-generated placeholder icons via imagemagick (Path A from assets-spec.md)", "rationale": "Unblock Plan 01-09 UAT now; designer team's branded icons swap in cleanly later. Avoids blocking the operator empirical loop on design work that's already delegated externally."}, - {"decision": "Design system + assets spec committed to .planning/intel/ as designer-team handoff docs", "rationale": "User stated will delegate all design execution to designer team. Specs capture hard technical floor (sizes/formats/contexts) + initial aesthetic direction the designer can override."} - ], - "session_anti_patterns_recurring": [ - {"name": "Subagent context anxiety surfacing", "severity": "blocking", "details": "Two subagents this session (gsd-executor at 66% and gsd-debug-session-manager at 72%) surfaced 'should I split / pause / accept partial scope' as user-facing decisions. The memory feedback-no-unilateral-scope-reduction.md hard sub-rule on context anxiety covers this BUT the rule was written for the orchestrator; needs strengthening to also bind subagents OR the orchestrator's spawn-prompt template must explicitly forbid the pattern. Workaround used: spawned fresh executor with explicit anti-context-anxiety directive baked into the prompt. Worked for executor; debug session manager did it again. Worth updating the saved memory to explicitly cover subagent-side surfacing + adjusting future spawn prompts."}, - {"name": "Pre-checkpoint bundle gates pattern validated", "severity": "advisory", "details": "Plan 01-08 closeout taught us the gates BEFORE operator checkpoint pattern (memory feedback-pre-checkpoint-bundle-gates.md). Plan 01-09 also used it successfully — Tier-1 SW-bundle-import gate stayed GREEN throughout Plan 01-09 execution; gates 1-4 ran cleanly before operator UAT. The pattern is working."} - ], - "context_notes": "Plan 01-09 Bug A (icon files) and Bug B (setErrorMode locks operator out) discovered during operator empirical Task 5. Bug A unblocked via placeholders in working tree (uncommitted). Bug B requires the route-on-error-code fix in src/background/index.ts:725-744. Both belong to Plan 01-09's closeout — should land before Wave 3 (Plan 01-10) starts. The debug session 01-09-recovery-flow was opened but its session manager hit context anxiety at 72% and stopped before writing the debug file or RED tests. Resume by spawning a FRESH /gsd-debug session with the orchestrator-context notes (including the explicit Bug B fix plan: route on message.error, IDLE for user-stopped-sharing, ERROR for other codes; preserve defensive ordering). All 3 hypotheses (icon corruption, popup-lock, design mismatch) are already verified empirically.", - "next_action": "After /clear: run /gsd-resume-work to load handoff. Recommended first step: commit the icon placeholders (icons/icon{16,48,128}.png — currently uncommitted), then spawn /gsd-debug for 01-09-recovery-flow Bug B fix per the orchestrator-context details above. Then re-run smoke for operator empirical verification. Then Wave 3 (Plan 01-10)." -} diff --git a/.planning/STATE.md b/.planning/STATE.md index f0508a3..d67ea44 100644 --- a/.planning/STATE.md +++ b/.planning/STATE.md @@ -2,16 +2,16 @@ gsd_state_version: 1.0 milestone: v2.0.0 milestone_name: milestone -status: phase_reopened -stopped_at: "Phase 1 REOPENED 2026-05-16: D-13 multi-EBML-concat architecture confirmed broken via UAT Test 3 retest + byte-level EBML probe — produced WebM plays only ~9 s instead of ~30 s in mpv AND Chrome (the 2026-05-15 closure's operator playback check was insufficient). Phase 1's primary deliverable (REQ-video-ring-buffer, SPEC §10 #7) is NOT satisfied. Plan 01-08 (WebM remux via ts-ebml + webm-muxer) will replace mergeVideoSegments file-concat with real single-EBML remux. RED test landed in tests/offscreen/webm-playback.test.ts (2 failures, 53 baseline GREEN). Option C port-lifecycle refactor (debug session empty-archive-port-race) DID land cleanly (commits 674c415..f0871c0). Phase 1 also absorbs whole-desktop + auto-start UX (Plans 01-09/01-10) per 2026-05-16 amended charter." -last_updated: "2026-05-16T17:35:00Z" -last_activity: "2026-05-16 — Phase 1 reopened: D-13 multi-EBML architecture confirmed broken by mpv/Chrome playback test; Plan 01-08 (ts-ebml + webm-muxer remux) pending; markers reverted" +status: executing +stopped_at: mid-Plan-01-09 closeout (Bug B routing fix pending); resumed 2026-05-17 +last_updated: "2026-05-17T14:30:13Z" +last_activity: 2026-05-17 progress: total_phases: 5 completed_phases: 0 total_plans: 10 - completed_plans: 7 - percent: 70 + completed_plans: 9 + percent: 92 --- # Project State @@ -27,13 +27,13 @@ no server, no password leaks. ## Current Position -Phase: 1 of 5 (Stabilize Video Pipeline) — COMPLETE 2026-05-15 +Phase: 1 of 5 (Stabilize Video Pipeline) — REOPENED 2026-05-17 (Plan 01-09 Bug B fix pending; Plan 01-10 Wave 3 pending) Next phase: 2 of 5 (Stabilize DOM + event-capture privacy) -Plan: 7 of 7 complete (Phase 1 closed) -Status: Phase 1 complete; ready to plan Phase 2 -Last activity: 2026-05-15 +Plan: 8 of 10 complete (Plan 01-09 closeout pending Bug B state-machine routing fix; Plan 01-10 pending Wave 3) +Status: Phase 1 reopened mid-Plan-01-09; Bug B blocking closure +Last activity: 2026-05-17 -Progress: [██████████] 100% (Phase 1) — 1/5 phases complete (20% milestone) +Progress: [█████████░] 92% (Phase 1) — 0/5 phases fully complete (Phase 1 was 100% on 2026-05-15, reopened by Plan 01-09 operator UAT) ## Performance Metrics @@ -128,9 +128,9 @@ Items acknowledged and carried forward from previous milestone close: ## Session Continuity -Last session: 2026-05-16T07:29:17.065Z (pause); resumed 2026-05-16 -Stopped at: Phase 1 review-fix paused at 5/18 (commit 2e3f524 = CR-01+CR-02+CR-03+WR-03+WR-09). 13 findings (7 Warning + 6 Info) + 8 sweep targets documented in 01-REVIEW-FIX.md "Remaining Work". User confirmed routing to /gsd-code-review-fix 1 on resume — full scope, no narrowing (per blocking constraints in .continue-here.md). Subsequent: /gsd-verify-work 1, then /gsd-plan-phase 2. -Resume file: .planning/phases/01-stabilize-video-pipeline/.continue-here.md +Last session: 2026-05-17T14:30:13Z +Stopped at: resumed from /gsd-pause-work checkpoint ed82fd6; Bug A icons (a881bf0) + intel-unlock (f768498) committed; spawning /gsd-debug for Bug B state-machine routing +Resume file: .planning/phases/01-stabilize-video-pipeline/.continue-here.md (consumed; HANDOFF.json deleted post-resumption) ## Phase 1 Closure Notes