chore(02): resume — consume HANDOFF + sync STATE for Phase 2 execution

- Delete HANDOFF.json (one-shot artifact; resume succeeded)
- Update STATE.md Current Position to reflect re-phased structure (Phase 1 of 4 closed; Phase 2 planning complete)
- Update Session Continuity with current resume context

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
This commit is contained in:
2026-05-20 15:08:59 +02:00
parent a440c7d76b
commit 6f052c74f8
2 changed files with 10 additions and 104 deletions

View File

@@ -27,10 +27,10 @@ no server, no password leaks.
## Current Position
Phase: 1 of 5 (Stabilize Video Pipeline) — **COMPLETE** 2026-05-20 via gsd-verifier goal-backward audit GREEN (17/17 must-haves; VERIFICATION.md at `.planning/phases/01-stabilize-video-pipeline/01-VERIFICATION.md`). 14/14 plans landed; 5 operator empirical acks; all gates GREEN (153/153 vitest, 24/24 UAT, Tier-1 grep 12 FORBIDDEN_HOOK_STRINGS, pre-checkpoint bundle gates).
Next phase: 2 of 5 (Stabilize DOM + event-capture privacy) — kickoff pending
Plan: 14 of 14 complete (14 plans: 01-01..01-09 + 01-11 spike + 01-12 + 01-13 + 01-14 + 01-10)
Status: Phase 1 complete; Phase 2 kickoff pending
Phase: 1 of 4 (Stabilize Video Pipeline) — **COMPLETE** 2026-05-20 via gsd-verifier goal-backward audit GREEN (17/17 must-haves; VERIFICATION.md at `.planning/phases/01-stabilize-video-pipeline/01-VERIFICATION.md`). 14/14 plans landed; 5 operator empirical acks; all gates GREEN (153/153 vitest, 24/24 UAT, Tier-1 grep 12 FORBIDDEN_HOOK_STRINGS, pre-checkpoint bundle gates).
Phase 2 of 4 (Stabilize export pipeline) — PLANNING COMPLETE; 4 plans validated (02-01..02-04) + plan-checker iter-2 GREEN; ready for `/gsd-execute-phase 2`
Plan: 14 of 14 complete (Phase 1: 01-01..01-09 + 01-11 spike + 01-12 + 01-13 + 01-14 + 01-10). Phase 2: 0/4 executed (02-01 RED tests → 02-02 Blob URL → 02-03 meta.urls + tabs perm → 02-04 harness A24-A28 + UAT)
Status: Phase 1 complete; Phase 2 execution-ready
Last activity: 2026-05-20
Progress: [██████████] Phase 1 100% · Overall 1/5 phases complete
@@ -214,11 +214,13 @@ Items acknowledged and carried forward from previous milestone close:
## Session Continuity
Last session: 2026-05-20T12:00:00.000Z
Stopped at: Plan 01-10 closed 2026-05-20 via cycle-2 operator ack "All good" (153/153 vitest, 24/24 UAT GREEN) + 5 inter-cycle debug fixes + brand-rename follow-up; Phase 1 final-closure marker flip pending (REQUIREMENTS / ROADMAP / STATE markers + optional /gsd-verify-work 1)
Resume file: None
Last session: 2026-05-20T15:30:00.000Z
Stopped at: /gsd-resume-work loaded HANDOFF.json (a440c7d). Phase 1 closed; Phase 2 planning complete (4 plans validated, plan-checker iter-2 GREEN). Awaiting user direction on `/gsd-execute-phase 2` (canonical) vs `--wave 1` (RED tests only).
Resume file: .planning/phases/02-stabilize-export-pipeline/.continue-here.md (sibling to consumed HANDOFF.json)
Prior session: 2026-05-20T08:00:00.000Z — Plan 01-12 closed via Wave 7 operator brand-fit ack 2026-05-20 'all good' (SUMMARY f319c7d; 147/147 vitest + 21/21 UAT GREEN)
Prior session: 2026-05-20T12:54:42.000Z — /gsd-pause-work saved Phase 2 execution-ready handoff (a440c7d); Phase 1 closed end-to-end via verifier audit GREEN (586836f); alpha distribution shipped (dist-archives/mokosh-build-2026-05-20-6dbed91.zip)
Earlier session: 2026-05-20T12:00:00.000Z — Plan 01-10 closed via cycle-2 operator ack "All good" + 5 inter-cycle debug fixes + brand-rename follow-up
Even earlier: 2026-05-20T08:00:00.000Z — Plan 01-12 closed via Wave 7 operator brand-fit ack 2026-05-20 'all good' (SUMMARY f319c7d; 147/147 vitest + 21/21 UAT GREEN)
Earlier session: 2026-05-19T19:41:05.737Z — Completed Plan 01-14 (commit b467123 + SUMMARY 5254145; 16/16 UAT + 100/100 vitest GREEN)
Even earlier session: 2026-05-17T14:30:13Z — resumed from /gsd-pause-work checkpoint ed82fd6; Bug A icons (a881bf0) + intel-unlock (f768498) committed; /gsd-debug spawned for Bug B state-machine routing (subsequently resolved via the recovery-flow amendment at Plan 01-09 Task 5 step 11)