docs(01-10): state + roadmap + requirements — Plan 01-10 closure
State markers sync after Plan 01-10 closure: STATE.md: - progress.completed_plans: 13 → 14 - progress.percent: 93 → 100 (all 14 Phase 1 functional plans complete) - status: executing (Phase 1 final-closure marker flip pending) - stopped_at + Last session timestamps refreshed - Current Position bumped to 14/14 plans complete - Outstanding Phase 1 gates: Plan 01-10 row marked CLOSED; Phase 1 final-closure marker flip listed as remaining work - Plan 01-10 closure section added mirroring existing 01-12/01-13/01-14 patterns: 4 wave commits + 5 inter-cycle debug commits + cycle-2 ack - Performance Metrics: Phase 01 P10 row added (5h, 5 tasks, 14 files) - Decisions: 3 Plan 01-10 architectural decisions added (first-install activation; D-16-toolbar charter preservation; three-pipeline DOM population pattern; startVideoCapture D-01 cleanup gap closure) ROADMAP.md: - Plan 01-10 row flipped to [x] with full closure annotations (commit chain + harness counts + operator ack date) - Plan 01-09 row annotated with closure-cycle follow-up debug commits (a2dfc8cstartVideoCapture no-tab +4bba679notifStartup text split — both landed during Plan 01-10 closure cycle) - Phase 1 plans-count narrative updated: "all 14 functional plans complete; Phase 1 final-closure marker flip pending" - Progress table: Phase 1 plans complete 13/14 → 14/14; status row updated to "Final-closure marker flip pending" REQUIREMENTS.md: - Footer timestamp + closure note updated: Plan 01-10 introduced no new functional REQs (it consumed REQ-video-ring-buffer already-Complete via Plan 01-07) by adding the first-install operator-facing activation surface that complements the always-on capture pipeline. - Phase 1 final functional plan delivered; final-closure marker flip pending (REQUIREMENTS / ROADMAP / STATE markers + optional /gsd-verify-work 1). Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
This commit is contained in:
@@ -239,5 +239,6 @@ RAM-ceiling check.
|
||||
|
||||
---
|
||||
*Requirements defined: 2026-05-15*
|
||||
*Last updated: 2026-05-20 — REQ-install-clean + REQ-manifest-permissions marked Complete on Plan 01-12 closure (design integration + manifest i18n + operator brand-fit ack)*
|
||||
*Last updated: 2026-05-20 — Plan 01-10 closure (welcome tab; first-install activation; canonical mark + canonical tokens + canonical chrome.i18n welcomeHero; 24/24 UAT GREEN; operator cycle-2 ack "All good"). Plan 01-10 introduced no new functional REQs; it consumed REQ-video-ring-buffer (already Complete via Plan 01-07) by adding the first-install operator-facing activation surface that complements the always-on capture pipeline. Phase 1 final functional plan delivered; final-closure marker flip pending (REQUIREMENTS / ROADMAP / STATE markers + optional /gsd-verify-work 1).*
|
||||
*Earlier update: 2026-05-20 — REQ-install-clean + REQ-manifest-permissions marked Complete on Plan 01-12 closure (design integration + manifest i18n + operator brand-fit ack)*
|
||||
*Earlier update: 2026-05-15 — REQ-video-ring-buffer marked Complete on Phase 1 (Plan 01-07) closure*
|
||||
|
||||
Reference in New Issue
Block a user