docs(01-10): state + roadmap + requirements — Plan 01-10 closure

State markers sync after Plan 01-10 closure:

STATE.md:
- progress.completed_plans: 13 → 14
- progress.percent: 93 → 100 (all 14 Phase 1 functional plans complete)
- status: executing (Phase 1 final-closure marker flip pending)
- stopped_at + Last session timestamps refreshed
- Current Position bumped to 14/14 plans complete
- Outstanding Phase 1 gates: Plan 01-10 row marked CLOSED;
  Phase 1 final-closure marker flip listed as remaining work
- Plan 01-10 closure section added mirroring existing 01-12/01-13/01-14
  patterns: 4 wave commits + 5 inter-cycle debug commits + cycle-2 ack
- Performance Metrics: Phase 01 P10 row added (5h, 5 tasks, 14 files)
- Decisions: 3 Plan 01-10 architectural decisions added
  (first-install activation; D-16-toolbar charter preservation;
  three-pipeline DOM population pattern; startVideoCapture D-01
  cleanup gap closure)

ROADMAP.md:
- Plan 01-10 row flipped to [x] with full closure annotations
  (commit chain + harness counts + operator ack date)
- Plan 01-09 row annotated with closure-cycle follow-up debug
  commits (a2dfc8c startVideoCapture no-tab + 4bba679 notifStartup
  text split — both landed during Plan 01-10 closure cycle)
- Phase 1 plans-count narrative updated: "all 14 functional plans
  complete; Phase 1 final-closure marker flip pending"
- Progress table: Phase 1 plans complete 13/14 → 14/14;
  status row updated to "Final-closure marker flip pending"

REQUIREMENTS.md:
- Footer timestamp + closure note updated: Plan 01-10 introduced
  no new functional REQs (it consumed REQ-video-ring-buffer
  already-Complete via Plan 01-07) by adding the first-install
  operator-facing activation surface that complements the always-on
  capture pipeline.
- Phase 1 final functional plan delivered; final-closure marker
  flip pending (REQUIREMENTS / ROADMAP / STATE markers + optional
  /gsd-verify-work 1).

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
This commit is contained in:
2026-05-20 12:10:56 +02:00
parent 52dc2e6a6e
commit d1ef77a7d1
3 changed files with 52 additions and 19 deletions

View File

@@ -70,7 +70,7 @@ directory + `vite.config.ts` inline string + `src/background/`.
decoder errors, only expected muxer DTS-monotonicity warnings at segment
join boundaries).
**Plans**: 14 plans (01-01 through 01-14). Plan 01-10 (welcome tab) is the final remaining functional plan; all other plans complete.
**Plans**: 14 plans (01-01 through 01-14). All 14 functional plans complete; Phase 1 final-closure marker flip pending.
- [x] 01-01-PLAN.md — Doc cascade: amend DEC-003 / DEC-010 / RETIRE constraints / swap manifest permissions (D-A1..D-A6)
- [x] 01-02-PLAN.md — Wave-0 test infrastructure: Vitest install + 4 RED test files + fixtures placeholder
- [x] 01-03-PLAN.md — Offscreen recorder TDD: ring buffer + codec strict-mode + getDisplayMedia + track-ended cleanup; D-13 fallback skeleton pre-staged
@@ -79,8 +79,8 @@ directory + `vite.config.ts` inline string + `src/background/`.
- [x] 01-06-PLAN.md — Build pipeline collapse: delete vite.config.ts inline plugin + top-level offscreen/ dir; declare rollupOptions.input
- [x] 01-07-PLAN.md — Manual smoke + ffprobe D-12 acceptance gate + A3 empirical-playback gate; D-12 + A3 debug sessions resolved mid-execution via pre-staged base64 wire format + D-13 restart-segments; regression fixture committed; SPEC §10 #2/#3/#7 functionally green (Closed 2026-05-15)
- [x] 01-08-PLAN.md — WebM remux via ts-ebml + webm-muxer (replaces D-13 file-concat; closes SPEC §10 #7 playability per debug d13-multi-ebml-concat-unplayable.md)
- [x] 01-09-PLAN.md — Toolbar onClicked direct flow + monitor-only picker + onStartup notification + 3-state badge state machine; closure-by-harness Amendment 2 (Plan 01-13 PASS substitutes for operator UAT)
- [ ] 01-10-PLAN.md — Welcome tab (Hero + Loom dial per D-02; first-install onboarding; harness A15-A17)
- [x] 01-09-PLAN.md — Toolbar onClicked direct flow + monitor-only picker + onStartup notification + 3-state badge state machine; closure-by-harness Amendment 2 (Plan 01-13 PASS substitutes for operator UAT). Closure-cycle follow-up debug `a2dfc8c` (startVideoCapture no-tab cleanup; D-01 dead-code removal) + `4bba679` (notifStartup text split into notifStartupCta + notifRecordingStarted) landed during Plan 01-10 closure 2026-05-20.
- [x] 01-10-PLAN.md — Welcome tab (Hero + Loom dial per D-02; first-install onboarding; chrome.runtime.onInstalled + chrome.storage.local flag-gating + chrome.tabs.create + canonical mokosh-mark.svg via Vite ?url import + canonical src/shared/tokens.css @import + chrome.i18n.getMessage for welcomeHeroRu + welcomeHeroEn; harness A15-A17 with A17.7 --mks-rec probe + A17.8 mark-bundling invariant; D-16-toolbar charter preserved). Closure 2026-05-20 via cycle-2 operator ack "All good" + 5 inter-cycle debug fixes (89e1e09 → 49f087f → 8f329d8 → b112cb7 → 4bba679 → d48a715 → 0854baf → a2dfc8c → d21ed17) + brand-rename follow-up "AI Call Recorder" → "Mokosh"; 153/153 vitest + 24/24 UAT GREEN.
- [x] 01-11-PLAN.md — UAT harness Approach-A spike (PIVOTED to 01-13; carries forward Wave 0 infrastructure + Tier-1 grep gate; falsified hypotheses recorded)
- [x] 01-12-PLAN.md — Design integration (R2 Lora self-host, src/shared/tokens.css canonical, 16 i18n keys across en+ru, branded Loom icons replacing Bug A placeholders, manifest i18n + default_locale='en', BADGE_REC_COLOR madder #b2543d, chrome.i18n.getMessage with `|| <const>` fallback, harness A18-A22; operator brand-fit ack 2026-05-20 'all good')
- [x] 01-13-PLAN.md — UAT harness via Approach B (extension-internal-page driver + offscreen synthetic stream; 15/15 GREEN; Plan 01-09 functional closure)
@@ -242,7 +242,7 @@ Phases execute in numeric order: 1 → 2 → 3 → 4 → 5.
| Phase | Plans Complete | Status | Completed |
|-------|----------------|--------|-----------|
| 1. Stabilize video pipeline | 13/14 | Executing (Plan 01-10 welcome tab pending) | Functional contract closed 2026-05-19 via Plan 01-13 harness PASS; design/brand contract closed 2026-05-20 via Plan 01-12 brand-fit ack |
| 1. Stabilize video pipeline | 14/14 | Final-closure marker flip pending (all functional plans complete; awaiting REQUIREMENTS / ROADMAP / STATE markers + optional /gsd-verify-work 1) | Functional contract closed 2026-05-19 via Plan 01-13 harness PASS; design/brand contract closed 2026-05-20 via Plan 01-12 brand-fit ack; welcome-tab contract closed 2026-05-20 via Plan 01-10 cycle-2 operator ack "All good" + 5 inter-cycle debug fixes |
| 2. Stabilize DOM + event capture privacy | 0/TBD | Not started | - |
| 3. Stabilize export pipeline | 0/TBD | Not started | - |
| 4. SPEC §10 smoke verification | 0/TBD | Not started | - |