diff --git a/.planning/STATE.md b/.planning/STATE.md index abe438d..2179583 100644 --- a/.planning/STATE.md +++ b/.planning/STATE.md @@ -2,16 +2,16 @@ gsd_state_version: 1.0 milestone: v2.0.0 milestone_name: milestone -status: ready_to_plan -stopped_at: Phase 3 UI-SPEC approved (null-spec; verification-only; 6/6 dimensions PASS) — ready for /gsd-plan-phase 3 (preferences preserved at .plan-phase-preferences.md) -last_updated: "2026-05-20T16:05:48.025Z" +status: ready_to_execute +stopped_at: Phase 3 plans created — 5 plans validated GREEN iter-1 by plan-checker (1 cosmetic warning resolved); ready for /gsd-execute-phase 3 +last_updated: "2026-05-20T17:05:06.655Z" last_activity: 2026-05-20 progress: total_phases: 4 completed_phases: 2 - total_plans: 18 + total_plans: 23 completed_plans: 18 - percent: 50 + percent: 78 --- # Project State @@ -215,9 +215,9 @@ Items acknowledged and carried forward from previous milestone close: ## Session Continuity -Last session: 2026-05-20T16:05:47.999Z -Stopped at: Phase 3 UI-SPEC approved (null-spec; verification-only; 6/6 dimensions PASS) -Resume file: .planning/phases/03-spec-10-smoke-verification-dom-event-log-verification/03-UI-SPEC.md +Last session: 2026-05-20T17:05:06.634Z +Stopped at: Phase 3 plans created — 5 plans validated GREEN iter-1 by plan-checker; ready for /gsd-execute-phase 3 +Resume file: .planning/phases/03-spec-10-smoke-verification-dom-event-log-verification/03-01-PLAN.md Prior session: 2026-05-20T12:54:42.000Z — /gsd-pause-work saved Phase 2 execution-ready handoff (a440c7d); Phase 1 closed end-to-end via verifier audit GREEN (586836f); alpha distribution shipped (dist-archives/mokosh-build-2026-05-20-6dbed91.zip) Earlier session: 2026-05-20T12:00:00.000Z — Plan 01-10 closed via cycle-2 operator ack "All good" + 5 inter-cycle debug fixes + brand-rename follow-up diff --git a/.planning/phases/03-spec-10-smoke-verification-dom-event-log-verification/.plan-phase-preferences.md b/.planning/phases/03-spec-10-smoke-verification-dom-event-log-verification/.plan-phase-preferences.md deleted file mode 100644 index b54d707..0000000 --- a/.planning/phases/03-spec-10-smoke-verification-dom-event-log-verification/.plan-phase-preferences.md +++ /dev/null @@ -1,45 +0,0 @@ ---- -context: phase-3-plan-preferences -captured: 2026-05-20 -expires_when: /gsd-plan-phase 3 completes ---- - -# Phase 3 plan-phase preferences (captured pre-UI-SPEC exit) - -User invoked `/gsd-plan-phase 3` 2026-05-20 and answered both initial gate -questions before workflow exited at UI-SPEC gate. These preferences should be -re-honored on next `/gsd-plan-phase 3` invocation (after `/gsd-ui-phase 3` -completes): - -## UI Design Contract gate - -**Decision:** Generate UI-SPEC.md first → run `/gsd-ui-phase 3` before -re-running plan-phase. - -**Caveat to revisit:** Phase 3 is verification-only — the "page" keyword that -tripped the gate refers to Puppeteer test fixture pages (synthetic HTML for -rrweb DOM probing), not user-facing UI. /gsd-ui-phase may produce a thin -UI-SPEC.md or recommend skipping. Either is acceptable. If it surfaces an -"is this a UI phase?" question, answer "no — internal test fixtures only". - -## Research gate - -**Decision:** Research first (light) → spawn gsd-phase-researcher before -planning. - -**Scope for researcher:** light investigation of -- `puppeteer.Page.metrics()` API for optional RAM scaffolding (D-P3-04) -- Any new rrweb 2.0.0-alpha.4 testing patterns relevant to DOM verification -- Verification of alpha-pin safety vs stable v2 ship status (informational — - upgrade itself is deferred to Phase 4 per D-P3-03) - -Researcher should NOT investigate: -- rrweb v2 upgrade implementation path (deferred to Phase 4) -- Full rrweb maskInputFn or data-sensitive masking (out of scope v1 per - charter shift) -- Programmatic RAM measurement via chrome.devtools Memory API (deferred) - -## Auto-cleanup - -Delete this file when /gsd-plan-phase 3 successfully completes planner -spawn (after honoring these preferences). diff --git a/.planning/phases/03-spec-10-smoke-verification-dom-event-log-verification/03-RESEARCH.md b/.planning/phases/03-spec-10-smoke-verification-dom-event-log-verification/03-RESEARCH.md index 57d7721..d5c447b 100644 --- a/.planning/phases/03-spec-10-smoke-verification-dom-event-log-verification/03-RESEARCH.md +++ b/.planning/phases/03-spec-10-smoke-verification-dom-event-log-verification/03-RESEARCH.md @@ -517,7 +517,7 @@ human_verification: **If the table is mostly LOW risk:** confirmed. The only MEDIUM is A6; planner-side flag. -## Open Questions +## Open Questions (RESOLVED) 1. **Wave structure: parallel or sequential for Plans 03-01..04?** - What we know: Plan 02-04 ran A24-A28 sequentially within a single plan (one author). Phase 3's 5-plan structure is finer-grained per D-P3-01.