2 Commits

Author SHA1 Message Date
e035fd279d docs(01-09): Amendment 3 + 01-13 SUMMARY reversal note + STATE.md sync + debug records
Plan 01-09 Amendment 3 (2026-05-19) — atomic documentation pass for
the save-does-not-stop-recording charter reversal.

Changes:
- .planning/phases/01-stabilize-video-pipeline/01-09-PLAN.md:
  Amendment 3 block added above <success_criteria> (mirrors
  Amendment 2 placement). Describes the reversed charter,
  references the new debug record, points at the inverted
  test file + harness A14.
- .planning/phases/01-stabilize-video-pipeline/01-13-SUMMARY.md:
  "Subsequent Reversal (2026-05-19)" footer added. Notes that
  npm run test:uat still 15/15 GREEN under the inverted A14
  contract; vitest baseline preserved at 98 GREEN.
- .planning/STATE.md:
  Plan 01-13 closure block extended with CHARTER REVERSAL bullet
  citing the 4 commit SHAs (6ac23fd RED, 7645765 GREEN,
  1baaf45 A14 invert, this commit docs).
- .planning/debug/resolved/01-09-save-stops-recording.md:
  SUPERSEDED 2026-05-19 footer appended (audit trail; original
  fix was technically correct against its charter, reversal is
  UX iteration not technical defect).
- .planning/debug/resolved/01-09-save-does-not-stop-recording.md:
  NEW debug record landed directly in resolved/ (no checkpoint
  cycle — orchestrator-diagnosed reversal). Documents symptom,
  charter clarification cycle, fix shape, RED→GREEN evidence
  with commit SHAs + vitest/harness output, anti-regression
  coverage at unit + E2E layers.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-19 17:50:49 +02:00
285e46f620 docs(01-13): close — operator UAT ack 2026-05-19 + save-stops debug resolved + SUMMARY landed
Plan 01-13 fully closed. Operator UAT acked "all good" on 2026-05-19;
recovery flow (A7) + restart-after-click (A2) both harness-covered, no
manual verification needed.

What this commit lands:
- 01-13-SUMMARY.md (full spike-pivot-then-implementation narrative; tracks
  all 16 commits across Plan 01-11 spike + Plan 01-13 4-wave execution +
  save-stops debug session; documents 15/15 npm run test:uat GREEN +
  98/98 vitest GREEN + Bug A/B regression-rewind demos verified)
- Save-stops debug record moved to .planning/debug/resolved/ (closure-
  canonical location; prior inline path tracked via git mv)
- STATE.md sync: completed_plans 11→12, percent 95→96, Plan 01-13
  fully-closed narrative + save-stops debug session captured

Phase 1 functional contract: CLOSED via harness PASS.
Remaining Phase 1 gates: Plan 01-10 (welcome tab) + Plan 01-12 (design
integration; pending designer Newsreader-Cyrillic reply).

Phase 2 inherits the harness as its closure-gate template.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-19 13:46:49 +02:00