- Mark .planning/debug/d12-blob-port-transfer-fails.md as
status: resolved; fill in the Resolution section with the
applied fix (5 commit hashes, files changed), verification
output (15/15 tests, tsc clean, vite build green, zero
as-any/ts-ignore in fix-touched files), and inline answers
to the specialist-review questions raised by the planner.
Move the file to .planning/debug/resolved/.
- Update STATE.md frontmatter (stopped_at) + Decisions log
+ Session Continuity to record the D-12 fix landing and
the open Plan 07 ffprobe gate (still requires operator
smoke.sh + ffprobe re-run before Phase 1 can close).
- Land smoke.sh — the operator's D-12 acceptance-gate harness
that surfaced the original failure. Self-contained: dedicated
/tmp/mokosh-smoke-profile, auto-accept desktop-capture picker,
Downloads polling, ffprobe gate, fixture staging.
REQ-video-ring-buffer remains NOT-complete — Plan 07 owns it,
operator must re-run ./smoke.sh to verify the fix end-to-end
in Chrome.
Refs: debug session d12-blob-port-transfer-fails (resolved).