Commit Graph

6 Commits

Author SHA1 Message Date
113f52d33e docs(phase-02): evolve PROJECT.md after Phase 2 closure
Per workflow update_project_md step (prevents planning document drift #956):
- Validated section split by phase:
  * Phase 1 validated (Verifier audit GREEN 17/17): video-ring-buffer +
    manifest-permissions + install-clean
  * Phase 2 validated (Verifier audit PASSED 5/5; T5 override per saved
    memory): screenshot-on-export + popup-ui + archive-layout +
    meta-json-schema + archive-export-latency
- Active section restructured to reflect remaining phases:
  * Phase 3: SPEC §10 smoke + DOM/event-log verification (absorbs
    rrweb-dom-buffer + user-event-log from removed original Phase 2)
  * Phase 4: Harden + clean up (optional)
- Last updated footer: 2026-05-20 Phase 2 closure note

Audit closures referenced: P0-6 (Blob URL pipeline) + P1 #10 (meta.urls
schema migration).

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-20 17:45:45 +02:00
df8c086ff0 docs(02): sync CON-manifest-permissions constraint with DEC-011 Amendment 1
Plan-checker iteration 2 surfaced an informational stale-reference: the
Constraints section's CON-manifest-permissions bullet still listed the
original SPEC §7 5-permission set (`tabCapture`, `activeTab`, `downloads`,
`scripting`, `storage`). This was superseded by:

- Phase 01 DEC-003 Amendment (retired `tabCapture`; added `desktopCapture`
  + `offscreen` + `notifications`)
- Phase 02 DEC-011 Amendment 1 (added `tabs` for D-P2-02 meta.urls feature
  at commit 9dcfcf0)

Updated CON-manifest-permissions to reflect the current 8-entry locked set
with strikethrough on the original 5 + cross-ref to DEC-011 Amendment 1.

Plan-checker iteration 2 verdict: GREEN; Phase 2 plans cleared for
/gsd-execute-phase 2.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-20 14:53:09 +02:00
9dcfcf0793 fix(02): revise plans per checker (B1 + 4 flags) — add tabs permission for D-P2-02
- BLOCKER B1: add `tabs` to manifest.json permissions (DEC-011 Amendment 1
  cites Phase 2 D-P2-02 meta.urls feature as justification). Honors
  D-P2-02 "all tabs visible" wording verbatim. Updates manifest-i18n test
  expected permission list lockstep.
- F1: add A28 harness assertion for REQ-archive-layout strict zip-layout
  verification (5 entries, no extras).
- F2: createArchive empty-tracker fallback removed; logs warn + sets
  urls:[] instead of fake [extension-origin URL]. 02-01 RED test pins
  empty-tracker → urls:[].
- F3: 02-02 Task 3 prose deliberation struck; typed `blob-url-mint-failed`
  throw is the resolved-only contract.
- F4: 02-02 Task 3 verify block adds full-suite `npm test` after focused
  test runs.
- A27 strict-mode (Plan 02-04): REQUIRES both URLs in meta.urls; FAILS
  on length < 2.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-20 14:25:20 +02:00
6dbed91efd docs(roadmap): re-phase milestone — remove Phase 2 (DOM/event-capture privacy)
Per operator charter shift 2026-05-20: "we don't care about privacy hardening.
At least here." Archive flow is internal-only (no external transmission),
which reframes the password-masking P0-5 defect from privacy-regulation
gravity to operator-hygiene polish.

Re-phasing applied across 4 planning artifacts:

ROADMAP.md:
- Original Phase 2 ("Stabilize DOM + event-capture privacy") REMOVED entirely
  (summary list + Phase Details section + Progress table row).
- DOM + event-log VERIFICATION (REQ-rrweb-dom-buffer + REQ-user-event-log)
  ABSORBED by new Phase 3 (SPEC §10 smoke verification).
- Phase numbering: old 3 → new 2 (export), old 4 → new 3 (smoke), old 5 → new 4
  (optional harden). Dependency chains updated accordingly.
- Overview blurb + journey narrative + success criteria refreshed.
- Phase 3 (smoke) explicitly NOT-in-scope: P0-5 password masking dropped.

REQUIREMENTS.md traceability:
- REQ-rrweb-dom-buffer: Phase 2 → Phase 3 (verification scope; UAT harness
  A24+ extension planned).
- REQ-user-event-log: Phase 2 → Phase 3 (same context).
- REQ-password-confidentiality: Phase 2 → Out of Scope (v1) — DEFERRED per
  charter shift.
- REQ-popup-ui, REQ-screenshot-on-export, REQ-archive-layout,
  REQ-meta-json-schema, REQ-archive-export-latency: Phase 3 → Phase 2
  (renumbered; substantively shipped via Plans 01-08 + 01-09 + 01-12;
  residual gaps in Phase 2).
- Coverage: 10 mapped + 1 out-of-scope (was 11 mapped).

PROJECT.md:
- CON-sensitive-data-masking: DEFERRED 2026-05-20 (preserves audit trail
  via strikethrough; rationale documented).
- DEC-004 amendment: rrweb 5000-event cap retained; masking deferred. Cites
  rrweb 2.0.0-alpha.4 maskInputSelector→maskInputFn API change.

STATE.md:
- frontmatter total_phases: 5 → 4.
- stopped_at narrative captures the re-phasing event.

CLI bug note: this re-phasing was attempted via `gsd-sdk query phase.remove 2`
+ canonical `/gsd-remove-phase 2` Skill invocation, but BOTH paths produced
corrupted output (cascading rename via reverse-iteration loop at
phase.cjs:670-679 collapsed all subsequent phases to "Phase 2", plus a
mysterious "2026"→"2002" date corruption). Recovery applied as manual edits
in this commit. CLI bug logged as upstream GSD-framework concern; not a
Mokosh-side issue.

Plan: next is `/gsd-discuss-phase 2` (new Phase 2 = export pipeline; narrowed
scope per re-phasing — ~2-3 plans expected since Plans 01-08 + 01-09 + 01-10
+ 01-12 already shipped most surface).

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-20 13:25:11 +02:00
b1ed2cbf49 docs(01-01): amend PROJECT.md DEC-003/DEC-010 + Constraints per D-A3
Rewrite DEC-003 and DEC-010 rows in the Key Decisions table to reflect
the Phase 01 amendments (getDisplayMedia + long-lived port keepalive),
each citing the .planning/intel/decisions.md amendment block as the
canonical source. Swap the two Constraints bullets that cited
chrome.alarms keepalive and tabCapture binding for replacement
bullets bound to CON-display-capture-binding.
2026-05-15 17:14:59 +02:00
89ca09ccec docs: bootstrap .planning/ via /gsd-ingest-docs (2 docs) /home/parf/projects/work/repremium/.planning/PROJECT.md /home/parf/projects/work/repremium/.planning/REQUIREMENTS.md /home/parf/projects/work/repremium/.planning/ROADMAP.md /home/parf/projects/work/repremium/.planning/STATE.md /home/parf/projects/work/repremium/.planning/intel /home/parf/projects/work/repremium/.planning/INGEST-CONFLICTS.md /home/parf/projects/work/repremium/.ingest-manifest.yaml 2026-05-15 15:16:30 +02:00