7df72aaa60
feat(01-07): close Phase 1 — REQ-video-ring-buffer complete, SPEC §10 #7 satisfied
...
Phase 1 closure 2026-05-15 — both acceptance gates green:
- D-12 ffprobe structural gate: `ffprobe -v error -f matroska -i
tests/fixtures/last_30sec.webm` exit 0 (cd61cbc )
- A3 empirical-playback gate: operator confirmed clean end-to-end Chrome
playback (no ~1 s freeze); ffmpeg `-v warning -i fixture -f null -`
exit 0 with zero decoder errors (only expected muxer DTS-monotonicity
warnings at segment join boundaries — documented D-13 trade-off for
multi-EBML-header WebM concat; Chrome's MSE pipeline handles this
natively, satisfying SPEC §10 #7 )
Changes:
- .planning/REQUIREMENTS.md
* REQ-video-ring-buffer checkbox [ ] -> [x]; description AMENDED to
document the D-13 restart-segments lifecycle replacing D-09..D-11;
SPEC §10 #2 , #3 , #7 noted as green 2026-05-15
* Traceability table row: REQ-video-ring-buffer | Phase 1 | Complete
(was Pending)
- .planning/ROADMAP.md
* Phase 1 list-item flipped [ ] -> [x] with closure date + summary
* Phase 1 Success Criteria 1, 2, 3 individually checked off; criterion 2
re-worded to reflect D-13 segment-cycling (replacing the original
single-continuous-recorder wording from D-09..D-11)
* Plan list: 01-07-PLAN.md flipped [ ] -> [x] with closure note
* Progress table row: 7/7 Complete 2026-05-15 (was 6/7 In Progress)
* Phase 5 P1/P2 list: appended `getDisplayMedia` cursor visibility
constraint (`video: { cursor: 'always' }`) — surfaced as user
observation during Phase 1 smoke 2026-05-15
- .planning/STATE.md
* Frontmatter: status -> phase_complete, completed_phases 0 -> 1,
completed_plans 6 -> 7, percent 86 -> 100; stopped_at + last_activity
rewritten for closure narrative
* Current Position: Phase 1 COMPLETE, next Phase 2 of 5, Plan 7/7
complete, progress bar [██████████] 100% Phase 1
* Performance Metrics: Phase 1 row populated (7 plans, ~50 min); added
Plan 07 row with closure narrative incl. the two debug sessions
* Decisions log: appended [Phase 01-07-closure] decision and
[Phase 01-07-deferred-to-5] note for the cursor-visibility refinement
* Session Continuity: rewritten for closure; resume file points to the
Plan 07 SUMMARY (commit 3)
* Added "Phase 1 Closure Notes" block with ffprobe + ffmpeg gates,
fixture metadata, test counts, criteria green-status, and a process
retro candidate (auto-injection of empirical-acceptance gates when
RESEARCH.md flags HIGH-risk assumptions)
Refs: .planning/debug/resolved/d12-blob-port-transfer-fails.md,
.planning/debug/resolved/webm-playback-freeze.md
2026-05-15 21:58:38 +02:00
1ebfb42b30
docs(01-06): complete vite.config.ts collapse plan
...
- 01-06-SUMMARY.md: detailed write-up — 226 → 21 lines, Outcome A
reconciliation (dist/src/offscreen/index.html), full dist layout
for Plan 07's smoke test, T-1-NEW-06-01 / T-1-NEW-06-02 grep gates
- STATE.md: completed_plans 5 → 6, percent 71 → 86, current plan
advanced 6 → 7, two new decisions logged, session stopped_at updated
- ROADMAP.md: Phase 1 plan progress row 4/7 → 6/7; 01-06-PLAN.md
checked off
REQ-video-ring-buffer remains unchecked — Plan 07 owns the ffprobe gate.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-15 18:17:43 +02:00
9e236cbc7b
docs(01-05): complete SW shrink + port host plan
...
Plan 05 closes: src/background/index.ts is now a pure coordinator with
zero video-buffer state, T-1-04 mitigations on both onConnect and
onMessage, OFFSCREEN_READY handshake, port-based buffer fetch via
'video-keepalive' port, IDB orphan cleanup on install, and chrome.offscreen.hasDocument()
re-sync on SW respawn (audit P1 #8 ). 9/9 vitest tests still green;
tsc clean; no as any / @ts-ignore.
REQ-video-ring-buffer stays pending — Plan 07's ffprobe gate owns the
final completion marker.
2026-05-15 18:07:07 +02:00
05d00509bf
docs(01-04): complete offscreen port keepalive + OFFSCREEN_READY handshake plan
...
- Add 01-04-SUMMARY.md with TDD RED/GREEN/REFACTOR gate records,
acceptance grep gates, threat mitigations (T-1-04, T-1-NEW-04-01),
Plan 05 SW-side handoff (REQUIRED sender.id === chrome.runtime.id
check), and 1 Rule 1 deviation documented
- Advance STATE.md Plan counter 4 → 5, progress 43% → 57%
- Append 3 decisions to STATE.md Accumulated Context
- Update ROADMAP.md: 01-04-PLAN checkbox → [x], phase progress row 3/7 → 4/7
REQ-video-ring-buffer NOT marked complete — still pending Plan 07
ffprobe D-12 gate per the requirement's traceability.
2026-05-15 17:54:04 +02:00
30e5efd364
docs(01-03): complete offscreen recorder TDD plan
...
- Add 01-03-SUMMARY.md documenting RED -> GREEN gate (Plan 02 tests now
pass), 3 Rule-3 auto-fixes (OffscreenLogger inline, defensive
bootstrap, SW dead-code removal), and Plan 04 / 05 handoff notes.
- Update STATE.md: advance plan counter to 4 of 7 (43%), append
metrics + 3 execution decisions, record session.
- Update ROADMAP.md: mark Plan 01-03 [x] complete.
REQ-video-ring-buffer remains NOT complete — still pending Plans 04
(port keepalive) and 07 (ffprobe acceptance gate).
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-15 17:42:21 +02:00
edc605d475
docs(01-02): complete wave-0 test infrastructure plan
...
- 01-02-SUMMARY.md created (Vitest 4.1.6 installed; 4 RED test files
pinning Plans 03+04 contracts; tests/fixtures/.gitkeep marker)
- STATE.md advanced: plan 2/7 -> 3/7; progress 14% -> 29%; metric row
added; 3 decisions logged; session continuity updated
- ROADMAP.md progress row updated: Phase 1 = 2/7 In Progress
- REQUIREMENTS.md: REVERTED premature [x] + "Complete" marking of
REQ-video-ring-buffer (Plan 01-01 mistakenly marked it; the requirement
is satisfied by Plans 03+04+07's implementation + ffprobe gate, not by
RED test scaffolding). Now reads "[ ]" + "In Progress" — honest state.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com >
2026-05-15 17:28:49 +02:00
13b67f5136
docs(01-01): complete doc-cascade plan
...
Plan 01-01 (Wave-0 doc cascade) complete. Six tasks landed atomically
in commits 125c032 , fb88830 , b1ed2cb , 597d967 , 32bc996 , 4a5194e . Every
code-touching plan in Phase 1 (01-02..01-07) now reads a consistent
baseline: getDisplayMedia replaces tabCapture in DEC-003; long-lived
port replaces alarms in DEC-010; manifest.json carries the final
Phase-1 permissions set (desktopCapture, activeTab, downloads,
scripting, storage, offscreen).
SUMMARY: .planning/phases/01-stabilize-video-pipeline/01-01-SUMMARY.md
2026-05-15 17:19:48 +02:00
32bc99642e
docs(01-01): amend Phase 1 description + Success Criterion #2 per D-A5
...
Rewrite the Phase 1 one-liner in the Phases list to call out the
chrome.tabCapture -> getDisplayMedia swap, and rewrite Success
Criterion #2 to describe the new operator-selected screen/window
capture and the absence of tab-reattach logic. Phases 2-5 sections are
untouched. The verbatim phrase 'no tab re-attach logic' is preserved
as written in the plan to document the amendment in-place; the
original 'recorder re-attaches to the new active tab' wording is gone.
2026-05-15 17:16:07 +02:00
178fdd5b77
docs(01): create phase 1 plans for video pipeline stabilization .planning/phases/01-stabilize-video-pipeline/01-01-PLAN.md .planning/phases/01-stabilize-video-pipeline/01-02-PLAN.md .planning/phases/01-stabilize-video-pipeline/01-03-PLAN.md .planning/phases/01-stabilize-video-pipeline/01-04-PLAN.md .planning/phases/01-stabilize-video-pipeline/01-05-PLAN.md .planning/phases/01-stabilize-video-pipeline/01-06-PLAN.md .planning/phases/01-stabilize-video-pipeline/01-07-PLAN.md .planning/ROADMAP.md
2026-05-15 16:37:45 +02:00
89ca09ccec
docs: bootstrap .planning/ via /gsd-ingest-docs (2 docs) /home/parf/projects/work/repremium/.planning/PROJECT.md /home/parf/projects/work/repremium/.planning/REQUIREMENTS.md /home/parf/projects/work/repremium/.planning/ROADMAP.md /home/parf/projects/work/repremium/.planning/STATE.md /home/parf/projects/work/repremium/.planning/intel /home/parf/projects/work/repremium/.planning/INGEST-CONFLICTS.md /home/parf/projects/work/repremium/.ingest-manifest.yaml
2026-05-15 15:16:30 +02:00