Milestone v1 (v2.0.0): Mokosh — Session Capture #1

Merged
strategy155 merged 297 commits from gsd/phase-04-harden-clean-up-optional into main 2026-05-31 15:34:17 +00:00
2 changed files with 14 additions and 13 deletions
Showing only changes of commit 0d1726bf75 - Show all commits

View File

@@ -35,7 +35,7 @@ Decimal phases appear between their surrounding integers in numeric order.
- [x] **Phase 1: Stabilize video pipeline** — Collapse offscreen duality, fix MediaRecorder shadow, fix WebM ring buffer playability, replace `chrome.tabCapture` with offscreen `getDisplayMedia` (AMENDED from original DEC-003). **CLOSED 2026-05-20** via gsd-verifier goal-backward audit GREEN (17/17 must-haves: 11 REQs/charters + 6 cross-cutting gates; see `.planning/phases/01-stabilize-video-pipeline/01-VERIFICATION.md`). Closure arc: 2026-05-15 (Plan 01-07) → 2026-05-16 (REOPENED on D-13 multi-EBML bug) → Plan 01-08 (WebM remux via ts-ebml + webm-muxer) → Plans 01-09/01-10 (whole-desktop + welcome-tab UX) → Plan 01-11 (spike-pivot) → Plan 01-12 (Design Integration) → Plan 01-13 (UAT harness 15/15 GREEN, 2026-05-19) → Plan 01-14 (monitorTypeSurfaces picker) → Plan 01-10 cycle-2 ack 'All good' 2026-05-20 + 5 inter-cycle debug fixes + brand-rename polish. 14/14 plans; 5 operator acks; 153/153 vitest + 24/24 UAT + Tier-1 grep 12 FORBIDDEN_HOOK_STRINGS all GREEN.
- [ ] **Phase 2: Stabilize export pipeline** — Close remaining export gaps (screenshot-at-click, meta.json schema, archive layout, manifest permission verification). Mostly already shipped via Plans 01-08 + 01-09 + 01-10 + 01-12 — narrowed scope post-re-phasing.
- [ ] **Phase 3: SPEC §10 smoke verification** — End-to-end install-and-record-and-export pass against all 9 acceptance criteria. **ABSORBS** REQ-rrweb-dom-buffer + REQ-user-event-log verification (originally Phase 2) per 2026-05-20 re-phasing. UAT harness extended with A24+ assertions for rrweb/event-log contracts.
- [ ] **Phase 4: Harden + clean up** _(optional)_ — P1/P2 follow-ups: SW state persistence, fetch interception, `meta.json` fields, `generate-icons.js` ESM/CJS, dead-code; plus deferred items from Phase 1 session (cursor visibility, dark-surface logo, tabs permission gap, 2 ffprobe flakes, ROADMAP backfill verification, rrweb 2.0.0-alpha.4 → stable v2 upgrade research).
- [x] **Phase 4: Harden + clean up** _(optional)_ — P1/P2 follow-ups: SW state persistence, fetch interception, `meta.json` fields, `generate-icons.js` ESM/CJS, dead-code; plus deferred items from Phase 1 session (cursor visibility, dark-surface logo, tabs permission gap, 2 ffprobe flakes, ROADMAP backfill verification, rrweb 2.0.0-alpha.4 → stable v2 upgrade research). **CLOSED 2026-05-26** via gsd-verifier goal-backward audit GREEN (4/4 ROADMAP SCs + 11/11 observable truths + 0 overrides; commit `8ffc6cb`; see `.planning/phases/04-harden-clean-up-optional/04-VERIFICATION.md`). 8 plans landed (04-01..04-08; 04-08 inserted Wave 5.5 after Plan 04-04 SPIKE FAILED was empirically REFUTED-architecture via 2 /gsd-debug sessions on canvas-throttling); 5/5 D-P4-* charters CLOSED; 3 /gsd-debug sessions (canvas-throttling resolved, A33.1 SAVE-ack race fixed at `7e0da63`, dark-mode --mks-mark-stroke decoupling at `a8bcc17`); 1 operator-empirical ack cycle on Plan 04-06 ('Confirmed fixed' 2026-05-26 after TWEAK → debug fix → re-empirical); UAT harness 33→36 GREEN (A33 via 04-08 + A34 via 04-05 + A35 via 04-06 with 5 sub-checks incl. A35.5 light+dark decouple-proof); vitest 171→188 GREEN (with documented 04-CONTEXT #9/#10 ffprobe parallel-vitest flake family); bundle gates 6/6 PASS (Gate 2 `new Function` flipped 1→0 via Plan 04-02 setimmediate 4-mechanism layered mitigation); Tier-1 FORBIDDEN_HOOK_STRINGS unchanged at 12; Tier-2 leak gate added (Plan 04-08 synthetic-display-source dist/ check).
## Phase Details

View File

@@ -2,16 +2,16 @@
gsd_state_version: 1.0
milestone: v2.0.0
milestone_name: milestone
status: executing
stopped_at: "Completed 04-07-PLAN.md (Phase 4 closure aggregator — 04-VERIFICATION.md created end-to-end; 4/4 ROADMAP SC closed; 3/3 audit P1 polish closed; 6/6 cross-cutting hardening items GREEN; UAT 36/36 + vitest 188/188 + 6/6 pre-checkpoint bundle gates + Tier-1=12 + Tier-2 NEW; D-P4-05 ROADMAP backfill verified; STATE.md/ROADMAP.md/REQUIREMENTS.md/PROJECT.md marker flips landed. Phase 4 row + completed_phases bump deferred to closure ceremony post gsd-verifier audit)"
last_updated: "2026-05-26T11:30:00Z"
status: milestone_complete
stopped_at: Milestone complete (Phase 04 was final phase)
last_updated: 2026-05-26T12:32:04.189Z
last_activity: 2026-05-26
progress:
total_phases: 4
completed_phases: 3
completed_phases: 4
total_plans: 31
completed_plans: 30
percent: 97
completed_plans: 31
percent: 100
---
# Project State
@@ -23,17 +23,17 @@ See: .planning/PROJECT.md (updated 2026-05-15)
**Core value:** When an operator hits a bug, one click MUST produce a
self-contained archive that lets support reproduce what happened — in under 5 s,
no server, no password leaks.
**Current focus:** Phase 04 — harden-clean-up-optional
**Current focus:** Milestone complete
## Current Position
Phase: 04 (harden-clean-up-optional) — EXECUTING (Plan 04-07 closed; awaiting independent gsd-verifier audit for Phase 4 formal closure ceremony)
Phase: 04
Phase 4 of 4 (Hardening — optional) — Plans 04-01..04-08 all closed (8/8); Plan 04-07 (this plan) created `.planning/phases/04-harden-clean-up-optional/04-VERIFICATION.md` aggregator + marker flips. ROADMAP SC #1 + #2 + #3 + #4 all CLOSED; D-P4-02 + D-P4-03 + D-P4-05 all CLOSED; D-P4-01 + D-P4-04 honored throughout.
Plan: 8 of 8 (Plan 04-07 = CLOSED via THIS execution)
Status: v1 milestone close-prep complete; pending independent gsd-verifier audit + closure-ceremony marker flips (ROADMAP Phase 4 row [x] + `completed_phases: 3 → 4` + `status: executing → completed` happen at closure ceremony — NOT during this plan)
Plan: Not started
Status: Milestone complete
Last activity: 2026-05-26
Progress: [█████████] 97%
Progress: [█████████] 100% — Milestone v1 complete (Phase 4 verifier PASSED 2026-05-26; 4/4 phases closed; 31/31 plans landed)
### Plan 04-07 closure (2026-05-26)
@@ -159,7 +159,7 @@ Progress: [█████████▓] 97%
**Velocity:**
- Total plans completed: 9
- Total plans completed: 17
- Average duration: —
- Total execution time: —
@@ -174,6 +174,7 @@ Progress: [█████████▓] 97%
| 5. Harden + clean up | 0 | — | — |
| 02 | 4 | - | - |
| 03 | 5 | - | - |
| 04 | 8 | - | - |
**Recent Trend:**