Milestone v1 (v2.0.0): Mokosh — Session Capture #1
@@ -70,7 +70,7 @@ directory + `vite.config.ts` inline string + `src/background/`.
|
||||
decoder errors, only expected muxer DTS-monotonicity warnings at segment
|
||||
join boundaries).
|
||||
|
||||
**Plans**: 7 plans
|
||||
**Plans**: 13 plans (01-01 through 01-13)
|
||||
- [x] 01-01-PLAN.md — Doc cascade: amend DEC-003 / DEC-010 / RETIRE constraints / swap manifest permissions (D-A1..D-A6)
|
||||
- [x] 01-02-PLAN.md — Wave-0 test infrastructure: Vitest install + 4 RED test files + fixtures placeholder
|
||||
- [x] 01-03-PLAN.md — Offscreen recorder TDD: ring buffer + codec strict-mode + getDisplayMedia + track-ended cleanup; D-13 fallback skeleton pre-staged
|
||||
@@ -78,6 +78,12 @@ directory + `vite.config.ts` inline string + `src/background/`.
|
||||
- [x] 01-05-PLAN.md — SW shrink: delete legacy buffer + alarms + IndexedDB + tabCapture paths; wire SW-side onConnect host
|
||||
- [x] 01-06-PLAN.md — Build pipeline collapse: delete vite.config.ts inline plugin + top-level offscreen/ dir; declare rollupOptions.input
|
||||
- [x] 01-07-PLAN.md — Manual smoke + ffprobe D-12 acceptance gate + A3 empirical-playback gate; D-12 + A3 debug sessions resolved mid-execution via pre-staged base64 wire format + D-13 restart-segments; regression fixture committed; SPEC §10 #2/#3/#7 functionally green (Closed 2026-05-15)
|
||||
- [x] 01-08-PLAN.md — WebM remux via ts-ebml + webm-muxer (replaces D-13 file-concat; closes SPEC §10 #7 playability per debug d13-multi-ebml-concat-unplayable.md)
|
||||
- [x] 01-09-PLAN.md — Toolbar onClicked direct flow + monitor-only picker + onStartup notification + 3-state badge state machine; closure-by-harness Amendment 2 (Plan 01-13 PASS substitutes for operator UAT)
|
||||
- [ ] 01-10-PLAN.md — Welcome tab (Hero + Loom dial per D-02; first-install onboarding; harness A15-A17)
|
||||
- [x] 01-11-PLAN.md — UAT harness Approach-A spike (PIVOTED to 01-13; carries forward Wave 0 infrastructure + Tier-1 grep gate; falsified hypotheses recorded)
|
||||
- [ ] 01-12-PLAN.md — Design integration (R2 Lora self-host, src/shared/tokens.css canonical, 8 i18n strings + 4 supporting keys, branded Loom icons, manifest i18n; harness A18-A22)
|
||||
- [x] 01-13-PLAN.md — UAT harness via Approach B (extension-internal-page driver + offscreen synthetic stream; 15/15 GREEN; Plan 01-09 functional closure)
|
||||
|
||||
### Phase 2: Stabilize DOM + event capture privacy
|
||||
**Goal**: rrweb captures DOM events on typical pages and the user-event log
|
||||
|
||||
1246
.planning/phases/01-stabilize-video-pipeline/01-12-PLAN.md