Milestone v1 (v2.0.0): Mokosh — Session Capture #1
@@ -104,11 +104,13 @@ Requirements for the Phase 1 SPEC. Each maps to one phase in ROADMAP.md.
|
|||||||
- SPEC §10 acceptance criteria: #7.
|
- SPEC §10 acceptance criteria: #7.
|
||||||
|
|
||||||
- [ ] **REQ-meta-json-schema**: `meta.json` inside the archive conforms to the
|
- [ ] **REQ-meta-json-schema**: `meta.json` inside the archive conforms to the
|
||||||
verbatim schema:
|
verbatim schema (D-P2-02 + D-P2-03 cutover; replaces the 7-field
|
||||||
|
`url: string` shape per audit P1 #10 amendment 2026-05-20):
|
||||||
```json
|
```json
|
||||||
{
|
{
|
||||||
|
"schemaVersion": "2",
|
||||||
"timestamp": "2025-05-15T14:32:10Z",
|
"timestamp": "2025-05-15T14:32:10Z",
|
||||||
"url": "https://...",
|
"urls": ["https://example.com/", "https://app.example.com/dashboard"],
|
||||||
"userAgent": "Chrome/...",
|
"userAgent": "Chrome/...",
|
||||||
"extensionVersion": "1.0.0",
|
"extensionVersion": "1.0.0",
|
||||||
"videoBufferSeconds": 30,
|
"videoBufferSeconds": 30,
|
||||||
@@ -116,7 +118,23 @@ Requirements for the Phase 1 SPEC. Each maps to one phase in ROADMAP.md.
|
|||||||
"totalEvents": 143
|
"totalEvents": 143
|
||||||
}
|
}
|
||||||
```
|
```
|
||||||
All fields required. Binding: CON-meta-json-schema.
|
All 8 fields required. Acceptance:
|
||||||
|
- `schemaVersion === '2'` (marks the D-P2-02 url→urls cutover; future
|
||||||
|
schema bumps increment)
|
||||||
|
- `timestamp` ISO-8601 with `Z` suffix
|
||||||
|
- `urls` is a `string[]` whose entries each match
|
||||||
|
`/^(https?|chrome-extension):\/\//` (per CONTEXT.md `<specifics>`
|
||||||
|
filter rules — exclude chrome://, about:, devtools://, file://). Empty
|
||||||
|
array IS permitted per F2 (whole-desktop-no-tab session is a
|
||||||
|
meaningful operator state); non-empty arrays validate each entry.
|
||||||
|
- `urls` is deduplicated; ordering is first-seen-first across the
|
||||||
|
rolling recording window
|
||||||
|
- `extensionVersion` matches semver
|
||||||
|
- `totalEvents` is a non-negative integer
|
||||||
|
- exactly 8 keys; no extras
|
||||||
|
Binding: CON-meta-json-schema (this REQ-text supersedes the original
|
||||||
|
CON-meta-json-schema 7-field shape — the original is preserved in the
|
||||||
|
SPEC for provenance; this REQ documents the Phase 2 cutover).
|
||||||
|
|
||||||
### Manifest & Install
|
### Manifest & Install
|
||||||
|
|
||||||
@@ -222,7 +240,7 @@ Which phase covers which requirement. See ROADMAP.md for phase details.
|
|||||||
| REQ-popup-ui | Phase 3 (originally) → **Phase 2** (renumbered) | Pending (largely shipped via Plan 01-09 SAVE-only popup + Plan 01-12 i18n; residual gaps in Phase 2) |
|
| REQ-popup-ui | Phase 3 (originally) → **Phase 2** (renumbered) | Pending (largely shipped via Plan 01-09 SAVE-only popup + Plan 01-12 i18n; residual gaps in Phase 2) |
|
||||||
| REQ-screenshot-on-export | Phase 3 (originally) → **Phase 2** (renumbered) | Pending |
|
| REQ-screenshot-on-export | Phase 3 (originally) → **Phase 2** (renumbered) | Pending |
|
||||||
| REQ-archive-layout | Phase 3 (originally) → **Phase 2** (renumbered) | Pending (substantively shipped via Plans 01-08 webm-remux + JSZip; verification in Phase 2) |
|
| REQ-archive-layout | Phase 3 (originally) → **Phase 2** (renumbered) | Pending (substantively shipped via Plans 01-08 webm-remux + JSZip; verification in Phase 2) |
|
||||||
| REQ-meta-json-schema | Phase 3 (originally) → **Phase 2** (renumbered) | Pending |
|
| REQ-meta-json-schema | Phase 2 | Pending (implementation landed via Plan 02-03; harness validation deferred to Plan 02-04) |
|
||||||
| REQ-archive-export-latency | Phase 3 (originally) → **Phase 2** (renumbered) | Pending |
|
| REQ-archive-export-latency | Phase 3 (originally) → **Phase 2** (renumbered) | Pending |
|
||||||
| REQ-manifest-permissions | Phase 3 (originally) → Phase 1 closure via Plan 01-12 i18n migration | Complete (2026-05-20 — manifest __MSG_*__ + default_locale='en' + 16 i18n keys per locale; permissions DEC-011 baseline unchanged; operator brand-fit ack) |
|
| REQ-manifest-permissions | Phase 3 (originally) → Phase 1 closure via Plan 01-12 i18n migration | Complete (2026-05-20 — manifest __MSG_*__ + default_locale='en' + 16 i18n keys per locale; permissions DEC-011 baseline unchanged; operator brand-fit ack) |
|
||||||
| REQ-install-clean | Phase 4 (originally) → Phase 1 closure via Plan 01-12 design integration | Complete (2026-05-20 — fresh build + load unpacked clean; zero remote-font CSP errors; branded icons rendering; en+ru manifest:name resolution; operator brand-fit ack) |
|
| REQ-install-clean | Phase 4 (originally) → Phase 1 closure via Plan 01-12 design integration | Complete (2026-05-20 — fresh build + load unpacked clean; zero remote-font CSP errors; branded icons rendering; en+ru manifest:name resolution; operator brand-fit ack) |
|
||||||
@@ -245,6 +263,7 @@ RAM-ceiling check.
|
|||||||
|
|
||||||
---
|
---
|
||||||
*Requirements defined: 2026-05-15*
|
*Requirements defined: 2026-05-15*
|
||||||
*Last updated: 2026-05-20 — Plan 01-10 closure (welcome tab; first-install activation; canonical mark + canonical tokens + canonical chrome.i18n welcomeHero; 24/24 UAT GREEN; operator cycle-2 ack "All good"). Plan 01-10 introduced no new functional REQs; it consumed REQ-video-ring-buffer (already Complete via Plan 01-07) by adding the first-install operator-facing activation surface that complements the always-on capture pipeline. Phase 1 final functional plan delivered; final-closure marker flip pending (REQUIREMENTS / ROADMAP / STATE markers + optional /gsd-verify-work 1).*
|
*Updated 2026-05-20 — REQ-meta-json-schema amended for Plan 02-03 (D-P2-02 + D-P2-03 8-field cutover: `url: string` → `urls: string[]`; new `schemaVersion: "2"` field; F2 empty-array permission). Traceability table entry flipped to "Pending (implementation landed via Plan 02-03; harness validation deferred to Plan 02-04)".*
|
||||||
|
*Earlier update: 2026-05-20 — Plan 01-10 closure (welcome tab; first-install activation; canonical mark + canonical tokens + canonical chrome.i18n welcomeHero; 24/24 UAT GREEN; operator cycle-2 ack "All good"). Plan 01-10 introduced no new functional REQs; it consumed REQ-video-ring-buffer (already Complete via Plan 01-07) by adding the first-install operator-facing activation surface that complements the always-on capture pipeline. Phase 1 final functional plan delivered; final-closure marker flip pending (REQUIREMENTS / ROADMAP / STATE markers + optional /gsd-verify-work 1).*
|
||||||
*Earlier update: 2026-05-20 — REQ-install-clean + REQ-manifest-permissions marked Complete on Plan 01-12 closure (design integration + manifest i18n + operator brand-fit ack)*
|
*Earlier update: 2026-05-20 — REQ-install-clean + REQ-manifest-permissions marked Complete on Plan 01-12 closure (design integration + manifest i18n + operator brand-fit ack)*
|
||||||
*Earlier update: 2026-05-15 — REQ-video-ring-buffer marked Complete on Phase 1 (Plan 01-07) closure*
|
*Earlier update: 2026-05-15 — REQ-video-ring-buffer marked Complete on Phase 1 (Plan 01-07) closure*
|
||||||
|
|||||||
Reference in New Issue
Block a user