--- gsd_state_version: 1.0 milestone: v2.0.0 milestone_name: milestone status: executing stopped_at: Completed 01-01 doc cascade — Plan 01-02 next last_updated: "2026-05-15T15:19:25.904Z" last_activity: 2026-05-15 progress: total_phases: 5 completed_phases: 0 total_plans: 7 completed_plans: 1 percent: 14 --- # Project State ## Project Reference See: .planning/PROJECT.md (updated 2026-05-15) **Core value:** When an operator hits a bug, one click MUST produce a self-contained archive that lets support reproduce what happened — in under 5 s, no server, no password leaks. **Current focus:** Phase 1 — Stabilize Video Pipeline ## Current Position Phase: 1 (Stabilize Video Pipeline) — EXECUTING Plan: 2 of 7 Status: Ready to execute Last activity: 2026-05-15 REQUIREMENTS.md, ROADMAP.md, STATE.md written) Progress: [█░░░░░░░░░] 14% ## Performance Metrics **Velocity:** - Total plans completed: 0 - Average duration: — - Total execution time: — **By Phase:** | Phase | Plans | Total | Avg/Plan | |-------|-------|-------|----------| | 1. Stabilize video pipeline | 0 | — | — | | 2. Stabilize DOM + event capture privacy | 0 | — | — | | 3. Stabilize export pipeline | 0 | — | — | | 4. SPEC §10 smoke verification | 0 | — | — | | 5. Harden + clean up | 0 | — | — | **Recent Trend:** - Last 5 plans: — - Trend: — *Updated after each plan completion* | Phase 01 P01 | 4min | 6 tasks | 6 files | ## Accumulated Context ### Decisions Decisions are logged in PROJECT.md Key Decisions table (DEC-001 through DEC-012, all SPEC-Accepted and locked for Phase 1). Recent decisions affecting current work: - Phase 1 framing: roadmap treats the existing codebase as a partially-broken first attempt to be remediated against the SPEC, not as greenfield. The 7 P0 defects from the audit are split across phases 1–3 along commit boundaries; phase 4 is end-to-end SPEC §10 smoke verification. - All 12 SPEC decisions (`DEC-001`..`DEC-012`) are LOCKED for Phase 1. Changing any of them requires a formal ADR; none are formally LOCKED in the ingest classification, so a future ADR can revise. - [Phase ?]: Doc cascade: amendments append (do not replace) original DEC/CON blocks to preserve SPEC provenance — Established convention for future SPEC-amending phases; downstream readers see both old + new with citation - [Phase ?]: Manifest: drop alarms permission entirely rather than retain for re-use — Plan 05 deletes the alarms code path; declaring unused permissions expands attack surface (T-1-02) ### Pending Todos None yet. ### Blockers/Concerns - (informational) `chrome.tabCapture` requires a user gesture on first activation — Phase 3 (P0-4) restores this by moving the call into the popup click handler; until Phase 3 lands, recording cannot start cleanly even if Phase 1's pipeline is correct. Phases 1–3 should not be re-ordered. ## Deferred Items Items acknowledged and carried forward from previous milestone close: | Category | Item | Status | Deferred At | |----------|------|--------|-------------| | *(none)* | | | | ## Session Continuity Last session: 2026-05-15T15:19:25.886Z Stopped at: Completed 01-01 doc cascade — Plan 01-02 next intel synthesis. Coverage validated: 11/11 v1 REQs mapped. Resume file: .planning/phases/01-stabilize-video-pipeline/01-02-PLAN.md