# Project State ## Project Reference See: .planning/PROJECT.md (updated 2026-05-15) **Core value:** When an operator hits a bug, one click MUST produce a self-contained archive that lets support reproduce what happened — in under 5 s, no server, no password leaks. **Current focus:** Phase 1 — Stabilize video pipeline ## Current Position Phase: 1 of 5 (Stabilize video pipeline) Plan: 0 of TBD in current phase Status: Ready to plan Last activity: 2026-05-15 — bootstrap from intel synthesis (PROJECT.md, REQUIREMENTS.md, ROADMAP.md, STATE.md written) Progress: [░░░░░░░░░░] 0% ## Performance Metrics **Velocity:** - Total plans completed: 0 - Average duration: — - Total execution time: — **By Phase:** | Phase | Plans | Total | Avg/Plan | |-------|-------|-------|----------| | 1. Stabilize video pipeline | 0 | — | — | | 2. Stabilize DOM + event capture privacy | 0 | — | — | | 3. Stabilize export pipeline | 0 | — | — | | 4. SPEC §10 smoke verification | 0 | — | — | | 5. Harden + clean up | 0 | — | — | **Recent Trend:** - Last 5 plans: — - Trend: — *Updated after each plan completion* ## Accumulated Context ### Decisions Decisions are logged in PROJECT.md Key Decisions table (DEC-001 through DEC-012, all SPEC-Accepted and locked for Phase 1). Recent decisions affecting current work: - Phase 1 framing: roadmap treats the existing codebase as a partially-broken first attempt to be remediated against the SPEC, not as greenfield. The 7 P0 defects from the audit are split across phases 1–3 along commit boundaries; phase 4 is end-to-end SPEC §10 smoke verification. - All 12 SPEC decisions (`DEC-001`..`DEC-012`) are LOCKED for Phase 1. Changing any of them requires a formal ADR; none are formally LOCKED in the ingest classification, so a future ADR can revise. ### Pending Todos None yet. ### Blockers/Concerns - (informational) `chrome.tabCapture` requires a user gesture on first activation — Phase 3 (P0-4) restores this by moving the call into the popup click handler; until Phase 3 lands, recording cannot start cleanly even if Phase 1's pipeline is correct. Phases 1–3 should not be re-ordered. ## Deferred Items Items acknowledged and carried forward from previous milestone close: | Category | Item | Status | Deferred At | |----------|------|--------|-------------| | *(none)* | | | | ## Session Continuity Last session: 2026-05-15 — bootstrap Stopped at: Wrote PROJECT.md, REQUIREMENTS.md, ROADMAP.md, STATE.md from intel synthesis. Coverage validated: 11/11 v1 REQs mapped. Resume file: None — ready for `/gsd-plan-phase 1`.