--- gsd_state_version: 1.0 milestone: v2.0.0 milestone_name: milestone status: executing stopped_at: Completed Plan 01-05 — SW shrink + onConnect host wired (T-1-04 sender check, OFFSCREEN_READY handshake, port-based buffer fetch, IDB orphan cleanup, hasDocument re-sync); 9/9 tests still green; Plan 06 next (vite.config.ts collapse) last_updated: "2026-05-15T16:06:29.434Z" last_activity: 2026-05-15 progress: total_phases: 5 completed_phases: 0 total_plans: 7 completed_plans: 5 percent: 71 --- # Project State ## Project Reference See: .planning/PROJECT.md (updated 2026-05-15) **Core value:** When an operator hits a bug, one click MUST produce a self-contained archive that lets support reproduce what happened — in under 5 s, no server, no password leaks. **Current focus:** Phase 1 — Stabilize Video Pipeline ## Current Position Phase: 1 (Stabilize Video Pipeline) — EXECUTING Plan: 6 of 7 Status: Ready to execute Last activity: 2026-05-15 REQUIREMENTS.md, ROADMAP.md, STATE.md written) Progress: [███████░░░] 71% ## Performance Metrics **Velocity:** - Total plans completed: 0 - Average duration: — - Total execution time: — **By Phase:** | Phase | Plans | Total | Avg/Plan | |-------|-------|-------|----------| | 1. Stabilize video pipeline | 0 | — | — | | 2. Stabilize DOM + event capture privacy | 0 | — | — | | 3. Stabilize export pipeline | 0 | — | — | | 4. SPEC §10 smoke verification | 0 | — | — | | 5. Harden + clean up | 0 | — | — | **Recent Trend:** - Last 5 plans: — - Trend: — *Updated after each plan completion* | Phase 01 P01 | 4min | 6 tasks | 6 files | | Phase 01 P02 | 4min | 5 tasks | 8 files | | Phase 1 P03 | 8min | 3 tasks | 5 files | | Phase 01 P04 | 4min | 3 tasks | 1 files | | Phase 01 P05 | 8min | 2 tasks | 1 files | ## Accumulated Context ### Decisions Decisions are logged in PROJECT.md Key Decisions table (DEC-001 through DEC-012, all SPEC-Accepted and locked for Phase 1). Recent decisions affecting current work: - Phase 1 framing: roadmap treats the existing codebase as a partially-broken first attempt to be remediated against the SPEC, not as greenfield. The 7 P0 defects from the audit are split across phases 1–3 along commit boundaries; phase 4 is end-to-end SPEC §10 smoke verification. - All 12 SPEC decisions (`DEC-001`..`DEC-012`) are LOCKED for Phase 1. Changing any of them requires a formal ADR; none are formally LOCKED in the ingest classification, so a future ADR can revise. - [Phase ?]: Doc cascade: amendments append (do not replace) original DEC/CON blocks to preserve SPEC provenance — Established convention for future SPEC-amending phases; downstream readers see both old + new with citation - [Phase ?]: Manifest: drop alarms permission entirely rather than retain for re-use — Plan 05 deletes the alarms code path; declaring unused permissions expands attack surface (T-1-02) - [Phase ?]: Pinned vitest at ^4 (4.1.6 latest stable; 5.x still beta on 2026-05-15) - [Phase ?]: Phase 1 Wave-0 test infra: 4 RED tests committed against not-yet-existent src/offscreen/recorder.ts — pins contracts for Plans 03+04 - [Phase ?]: Reverted premature REQ-video-ring-buffer Complete marking left by Plan 01-01; satisfied by Plans 03+04+07, not by Wave-0 RED tests - [Phase 01-03]: Bundled OffscreenLogger into Task 2 commit (Rule 3 blocking dependency — recorder.ts cannot typecheck without the import) - [Phase 01-03]: Defensive bootstrap guard (typeof chrome check) lets pure ring-buffer test import recorder module without chrome stub - [Phase 01-03]: Removed SW-side VIDEO_CHUNK/VIDEO_CHUNK_SAVED branches + IndexedDB helpers inline (tsc-clean requires; Plan 05 owns remaining SW shrink) - [Phase 01-04]: Kept Plan 03's defensive bootstrap guard (typeof chrome / per-API existence checks) instead of Plan 04's verbatim unguarded block — Plan 04's verbatim block regressed ring-buffer and codec-check tests (they don't stub full chrome surface); restored guard preserves Plan 02 RED contract while satisfying Plan 04's new GREEN contract. Rule 1 deviation. - [Phase 01-04]: T-1-04 SW-side sender check documented redundantly (4 places in recorder.ts) for Plan 05 executor visibility — Offscreen is trusting party; SW is validating party. Documenting in module header, port-name constant, threat-mitigation comment near bootstrap, and inline at connectPort makes the contract impossible to miss when grepping for T-1-04 during Plan 05. - [Phase 01-04]: REFACTOR pass NOT skipped: stale 'Plan 04 wires this' comments replaced with actual D-17/Pattern 5 citations — Forward-pointing TODO-style comments became misleading after the work landed; minimal correctness-preserving comment update with all 9 tests still GREEN. - [Phase ?]: [Phase 01-05]: Deleted broken checkPermissions / requestPermissions flow (Rule 1) - [Phase ?]: [Phase 01-05]: REQUEST_PERMISSIONS collapsed — under getDisplayMedia (D-01) no runtime perm check is meaningful; the broken 'tabCapture' permission check was sending recording-start into the never-granted branch - [Phase ?]: [Phase 01-05]: Added chrome.offscreen.hasDocument() in initialize() — Rule 2 robustness, audit P1 #8 mitigation across SW respawns - [Phase ?]: [Phase 01-05]: SW is now a pure coordinator — onConnect host bound to 'video-keepalive' port with T-1-04 sender check; getVideoBufferFromOffscreen replaces synchronous SW-local buffer fetch; OFFSCREEN_READY handshake closes the audit P1 #12 race - [Phase ?]: [Phase 01-05]: indexedDB.deleteDatabase('VideoRecorderDB') in onInstalled — T-1-NEW-05-02 / RESEARCH.md Runtime State Inventory cleanup of orphaned IDB from pre-Phase-01 builds ### Pending Todos None yet. ### Blockers/Concerns - (informational) `chrome.tabCapture` requires a user gesture on first activation — Phase 3 (P0-4) restores this by moving the call into the popup click handler; until Phase 3 lands, recording cannot start cleanly even if Phase 1's pipeline is correct. Phases 1–3 should not be re-ordered. ## Deferred Items Items acknowledged and carried forward from previous milestone close: | Category | Item | Status | Deferred At | |----------|------|--------|-------------| | *(none)* | | | | ## Session Continuity Last session: 2026-05-15T16:06:29.412Z Stopped at: Completed Plan 01-05 — SW shrink + onConnect host wired (T-1-04 sender check, OFFSCREEN_READY handshake, port-based buffer fetch, IDB orphan cleanup, hasDocument re-sync); 9/9 tests still green; Plan 06 next (vite.config.ts collapse) intel synthesis. Coverage validated: 11/11 v1 REQs mapped. Resume file: .planning/phases/01-stabilize-video-pipeline/01-06-PLAN.md