Project State

Project Reference

See: .planning/PROJECT.md (updated 2026-05-15)

Core value: When an operator hits a bug, one click MUST produce a self-contained archive that lets support reproduce what happened — in under 5 s, no server, no password leaks. Current focus: Phase 1 — Stabilize video pipeline

Current Position

Phase: 1 of 5 (Stabilize video pipeline) Plan: 0 of TBD in current phase Status: Ready to plan Last activity: 2026-05-15 — bootstrap from intel synthesis (PROJECT.md, REQUIREMENTS.md, ROADMAP.md, STATE.md written)

Progress: [░░░░░░░░░░] 0%

Performance Metrics

Velocity:

  • Total plans completed: 0
  • Average duration: —
  • Total execution time: —

By Phase:

Phase Plans Total Avg/Plan
1. Stabilize video pipeline 0
2. Stabilize DOM + event capture privacy 0
3. Stabilize export pipeline 0
4. SPEC §10 smoke verification 0
5. Harden + clean up 0

Recent Trend:

  • Last 5 plans: —
  • Trend: —

Updated after each plan completion

Accumulated Context

Decisions

Decisions are logged in PROJECT.md Key Decisions table (DEC-001 through DEC-012, all SPEC-Accepted and locked for Phase 1). Recent decisions affecting current work:

  • Phase 1 framing: roadmap treats the existing codebase as a partially-broken first attempt to be remediated against the SPEC, not as greenfield. The 7 P0 defects from the audit are split across phases 13 along commit boundaries; phase 4 is end-to-end SPEC §10 smoke verification.
  • All 12 SPEC decisions (DEC-001..DEC-012) are LOCKED for Phase 1. Changing any of them requires a formal ADR; none are formally LOCKED in the ingest classification, so a future ADR can revise.

Pending Todos

None yet.

Blockers/Concerns

  • (informational) chrome.tabCapture requires a user gesture on first activation — Phase 3 (P0-4) restores this by moving the call into the popup click handler; until Phase 3 lands, recording cannot start cleanly even if Phase 1's pipeline is correct. Phases 13 should not be re-ordered.

Deferred Items

Items acknowledged and carried forward from previous milestone close:

Category Item Status Deferred At
(none)

Session Continuity

Last session: 2026-05-15 — bootstrap Stopped at: Wrote PROJECT.md, REQUIREMENTS.md, ROADMAP.md, STATE.md from intel synthesis. Coverage validated: 11/11 v1 REQs mapped. Resume file: None — ready for /gsd-plan-phase 1.