Closes Plan 01-11 honestly per GSD spike-pivot pattern. Original
Approach A (Puppeteer sw.evaluate per RESEARCH §1+6) empirically
falsified across Wave 3 execution + feasibility research. Approach B
(extension-internal-page harness + offscreen synthetic stream) proven
via c647f61 prototype; full implementation moves to Plan 01-13.
What this commit does:
- ADDS 01-11-SUMMARY.md (spike-then-pivot framing per GSD artifact-
types.md PLAN→SUMMARY lifecycle; captures retained infrastructure,
falsified hypotheses, working prototype, bridge to 01-13)
- REVERTS frontmatter amendment block in 01-11-PLAN.md; replaces with
closed_as/pivoted_in/closure_note pointing at SUMMARY + 01-13
- DELETES 01-11-PLAN-AMENDMENT-A.md (improvised artifact type — not
recognized in GSD artifact-types.md; content folded into SUMMARY)
Lesson for orchestrator (captured in SUMMARY §Architectural Notes):
when a plan attempts an approach that proves infeasible, the right
move is honest SUMMARY + new plan, NOT in-place rewrite + AMENDMENT
artifact. The project's own pattern (01-08, 01-09, 01-10, 01-11
added mid-phase as new work surfaced) confirms add-new-plan-when-
scope-shifts is the established pattern.
Plan 01-09 closure via harness PASS NOT achieved by 01-11; still
requires operator UAT pending Plan 01-13 landing.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
14 KiB
f44ca3a) + dedicated feasibility research subagent (Verdict-A research, prototype c647f61).
- Approach B (extension-internal-page harness + offscreen-side synthetic MediaStream + chrome.runtime.sendMessage bridge) validated via prototype; industry-standard pattern per MetaMask, eyeo, Chrome MV3 official testing docs convergence.
- Wave 0 infrastructure retained as foundation for 01-13. Waves 1-2 partially retained — offscreen-hooks + types + harness.test.ts skeleton + Tier-1 gate kept; sw-hooks + popup-bridge lib deleted/replaced.
- Spike-then-pivot framing: 01-11 reads retroactively as a SPIKE that delivered useful infrastructure + falsified the original architectural hypothesis + produced a working prototype. Full 14-assertion harness implementation defers to Plan 01-13.
- MOKOSH_UAT Vite define-token chosen over import.meta.env.MODE='test' (per original RESEARCH §6 sketch) because vitest defaults MODE='test' and would have activated hooks during unit tests, clobbering 8 existing chrome. vi.fn() mocks.
- Tier-1 grep gate (no-test-hooks-in-prod-bundle.test.ts) is permanent baseline — verifies __mokoshTest absent from production dist/ on every test run.
metrics:
duration: "~8h cumulative (planning + research + 2 executor attempts + feasibility research + prototype + pivot)"
completed: "2026-05-18 (closed as spike-then-pivot; full harness deferred to 01-13)"
task_count: "Wave 0 (T1) complete; Waves 1-4 partial or not delivered as originally planned"
files_modified: "18 created + 4 modified (some files will be deleted in 01-13 baseline)"
net_loc: "~1500+ (test infrastructure + prototype + Tier-1 gate)"
pivot: "yes — full harness implementation deferred to Plan 01-13"
Phase 1 Plan 11: UAT Harness — Approach A Spike (Pivoted to 01-13)
Attempted to retire operator UAT for functional gates via Puppeteer-driven MV3 extension automation. Approach A (Puppeteer sw.evaluate per original RESEARCH §1+6) empirically falsified across Wave 3 + dedicated feasibility research. Approach B (extension-internal-page harness + offscreen-side synthetic stream) validated via working prototype. Full harness implementation deferred to Plan 01-13.
One-Liner
Approach A spike: shipped two-bundle infrastructure + Tier-1 grep gate + offscreen-hooks scaffolding + empirical falsification of "MV3 SW supports dynamic import" hypothesis + working prototype of Approach B (extension-internal-page harness). Full 14-assertion implementation pivots to Plan 01-13.
What Landed
Infrastructure (Wave 0, commit 96fa8e8) — Retained for 01-13
vite.test.config.ts— extends production config withmode='test'+outDir='dist-test'package.jsonscriptsbuild:test+test:uat(orchestrate build + harness)tests/background/no-test-hooks-in-prod-bundle.test.ts— Tier-1 grep gate (A0 assertion); permanent in test suite- Bonus:
0cd50fd— imported Bug B recovery-flow debug record from prior session (cleanup that was overdue)
Hooks scaffolding (Wave 1, commit cb1a729) — Partially Retained
| File | Status | Reason |
|---|---|---|
src/test-hooks/offscreen-hooks.ts |
RETAINED + EXTENDED in 01-13 | Offscreen IS a DOM document; dynamic import works there |
src/test-hooks/types.ts |
RETAINED in 01-13 | Type contracts valid regardless of arch |
src/test-hooks/sw-hooks.ts |
DELETED in 01-13 | MV3 SW blocks dynamic import — silently kills SW |
src/background/index.ts Wave 1 import block |
REVERTED in 01-13 | Same MV3 SW limit |
Harness scaffolding (Wave 2, commit dbd977c) — Mostly Replaced
| File | Status | Reason |
|---|---|---|
tests/uat/lib/*.ts (popup-bridge) |
DELETED/REPLACED in 01-13 | Wrong architecture; setPopup state changes don't propagate reliably |
tests/uat/harness.test.ts skeleton |
REWIRED in 01-13 | Top-level structure stays; assertions point at new extension-page architecture |
| A0 Tier-1 gate (GREEN here) | RETAINED — permanent | Grep gate is architecture-agnostic |
Working prototype (commit c647f61) — PROVES Approach B; Promoted in 01-13
tests/uat/prototype/extension-page-harness.html + .ts— extension-internal page (privileged chrome.* access) drives assertions via direct chrome.* calls +chrome.runtime.sendMessagebridgetests/uat/prototype/a6.test.ts— Puppeteer driver template- A6 assertion (Bug B regression catch): 5/5 GREEN
- Bug-B regression rewind verified:
if (false)patch onsrc/background/index.ts:759turns 4/5 RED; restoring turns 5/5 GREEN - Total prototype runtime: ~7s end-to-end
Empirical Falsifications (Research Output)
These were the original RESEARCH §1 + §6 hypotheses. All falsified by execution + feasibility research:
- MV3 SW blocks dynamic import.
await import(...)insrc/background/index.tssilently never resolves; SW dies. Verified across two independent investigations. Cited: Chromiumes_modules.md+ w3c/webextensions#212. - Puppeteer
WebWorker.evaluateagainst MV3 SW only exposeschrome.{loadTimes, csi}— NOT extension chrome.* API. CDP-level abstraction treats MV3 SW as a generic worker. - Popup-bridge
chrome.action.setPopupstate changes don't propagate to popup-sidechrome.action.getPopupqueries within waitable timeframes. - Headless
--auto-select-desktop-capture-sourcedoesn't trigger getDisplayMedia resolution in--headless=newfor screen-capture sources.
Test Counts
- Before plan: 83/83 vitest GREEN
- After Wave 0 (
96fa8e8): 84/84 GREEN (+1 Tier-1 grep gate) - After Wave 1 (
cb1a729): 89/89 GREEN (+5 hook contract tests) - After Wave 2 (
dbd977c): 89/89 GREEN (popup-bridge tests stubbed RED-by-design per plan; A0 GREEN) - After prototype (
c647f61): 89/89 vitest unchanged; prototype runs out-of-band vianpx tsx tests/uat/prototype/a6.test.ts(5/5 GREEN, ~7s) - End of plan: 89/89 vitest GREEN; production bundle hook-free (Tier-1 gate enforces)
Deviations from Plan
The plan as written assumed Approach A architecture would work. Across Wave 3 attempted execution + dedicated feasibility research, Approach A architecturally infeasible. Pivoted to Approach B per prototype.
Plan 01-09 closure via harness PASS (the original Task 5 redirect target) NOT achieved — Plan 01-09 still requires operator UAT pending Plan 01-13 landing.
Architectural Notes Worth Carrying Forward
- Drive Chrome FROM INSIDE the extension, not FROM OUTSIDE. MetaMask/eyeo/Chrome-docs convergence: extension-internal pages have FULL chrome.* API access as privileged contexts. Puppeteer drives the page; page drives chrome.*. SW state queried indirectly via
chrome.runtime.sendMessage. track.dispatchEvent(new Event('ended'))for synthesizing user-stopped-sharing, NOTtrack.stop()(which does NOT fireendedper W3C spec + empirical Chrome 148 verification).__MOKOSH_UAT__Vite define-token overimport.meta.env.MODE='test'— vitest defaultsMODE='test', which would activate hooks during unit tests and clobber chrome.* mocks.- MV3 SW blocks dynamic import — never use
await import(...)insrc/background/index.ts. Test-mode SW augmentation must be done via build-time inclusion (Vite plugin) or eager static import, not runtime import gate. - Pages CAN call
chrome.offscreen.createDocument— confirmed empirically. Chrome docs don't say this explicitly. Architectural unlock for the prototype. - Spike-then-pivot framing is a legitimate plan outcome — when a plan attempts an approach that proves infeasible, the right move is honest SUMMARY + new plan, not in-place rewrite + AMENDMENT artifact. (Lesson for the orchestrator.)
Self-Check: PARTIAL — Closed as Spike-Pivot
- FOUND:
vite.test.config.ts(Wave 0) - FOUND:
tests/background/no-test-hooks-in-prod-bundle.test.ts(Tier-1 gate, A0 GREEN) - FOUND:
src/test-hooks/offscreen-hooks.ts(carries to 01-13) - FOUND:
src/test-hooks/types.ts(carries to 01-13) - FOUND:
tests/uat/prototype/extension-page-harness.{html,ts} - FOUND:
tests/uat/prototype/a6.test.ts(5/5 GREEN) - FOUND:
tests/uat/lib/*.ts(wrong arch — to delete/replace in 01-13) - FOUND:
src/test-hooks/sw-hooks.ts(broken — to delete in 01-13) - FOUND:
96fa8e8(Wave 0 infrastructure) - FOUND:
0cd50fd(bonus debug record import) - FOUND:
cb1a729(Wave 1 — partial retained; sw-hooks broken) - FOUND:
dbd977c(Wave 2 — popup-bridge wrong arch) - FOUND:
f44ca3a(Wave 3 partial — abandoned) - FOUND:
c647f61(prototype — proves Approach B; PROVENANCE for 01-13) - NOT-DELIVERED: A1-A13 functional assertions (deferred to 01-13)
- NOT-DELIVERED: Plan 01-09 closure via harness PASS (still requires operator UAT pending 01-13)
Known Stubs (To Be Resolved in 01-13)
tests/uat/lib/*.ts— popup-bridge architecture stubs from Wave 2dbd977c. Wrong architecture; 01-13 deletes or rewrites.src/test-hooks/sw-hooks.ts+ dynamic-import block insrc/background/index.ts— BROKEN (MV3 SW limit). 01-13 deletes both.tests/uat/prototype/*— proof-of-concept code, not production-quality. 01-13 promotes to production paths undertests/uat/proper.
Bridge to Plan 01-13
Plan 01-13 implements full UAT harness via Approach B (extension-internal-page architecture). Inputs:
- This SUMMARY (pivot rationale + retained infrastructure + falsified hypotheses)
- Plan 01-11-RESEARCH.md (original research; partially historical now)
- Feasibility research findings (Verdict-A architecture details, embedded in
c647f61commit body + this SUMMARY) - Prototype files (
tests/uat/prototype/*,src/test-hooks/offscreen-hooks.ts,vite.test.config.ts) - The 14-assertion scope from original Plan 01-11 PLAN.md
01-13 will land all 14 assertions reliably, close Plan 01-09 functional contract via harness PASS, and become the standard closure gate for future phases.