Files
mokosh/.planning
Mark 1d06d9d70b docs(01-07): write Plan 07 SUMMARY and close phase 1 artifacts
Plan 07 SUMMARY — manual smoke + ffprobe D-12 gate + A3 empirical-playback
gate, three-attempt closure narrative with two pre-staged fallback
activations (base64 wire-format from CONTEXT.md Doc Cascade; D-13
restart-segments from CONTEXT.md), and the process-retro candidate flag.

Structure:

- Frontmatter: dependency graph (requires Plans 01..06; provides D-12/A3
  gates + fixture + REQ closure + D-09..D-11/CON-webm-header-retention
  retirement); patterns established (pre-staged contingency activation;
  three-attempt acceptance); requirements-completed [REQ-video-ring-buffer]
- Accomplishments: D-12 + A3 gates green; 30/30 tests; tsc clean; REQ
  marked Complete; cursor-visibility deferred to Phase 5
- Task Commits: this closure cycle (cd61cbc fixture + 7df72aa REQ/STATE/
  ROADMAP flip + this SUMMARY), plus the prior D-12 fix cycle (5 commits
  c0d9166..bf07619) and A3 fix cycle (6 commits 5530292..872f25d)
- Deviations from ORIGINAL Plan 07: two architectural escalations, both
  resolved by pre-staged fallbacks without re-planning; the closure
  ceremony itself split into 3 atomic commits (spec'd as 1) for
  reviewability
- Issues Encountered: three-attempt journey documented (attempt 1 75-byte
  text → D-12 fix; attempt 2 ffprobe-valid freezes → A3 fix; attempt 3
  clean)
- Process Observation: candidate retro for /gsd-plan-phase to auto-inject
  empirical-acceptance gates BEFORE merging a phase when RESEARCH.md flags
  HIGH-risk assumptions
- Next Phase Readiness: Phase 2 constraints (no competing keepalives;
  T-1-04 sender-check respected) + workflow next steps (code-review +
  verifier per user settings)
- Self-Check: PASSED — all closure artifacts present and verified

Phase 1 is complete; next workflow steps are /gsd-code-review +
/gsd-verify-work, then /gsd-plan-phase 2.
2026-05-15 22:02:11 +02:00
..