Mark 9c5ff8b2a7 docs(01-13): wave-4 task-8 — Plan 01-09 closure-via-harness amendment + STATE.md sync
Lands the Wave 4 closure docs:
- 01-09-PLAN.md Amendment 2: harness PASS (npm run test:uat 14/14 GREEN at d793c9e)
  now closes Plan 01-09 functional contract (original Task 5 steps 4, 5, 7-13, 15);
  operator retains only step 1 (build) + step 14 (brand/design ack — Plan 01-13
  Task 9 charter). Coverage map table pins each retired manual step to its
  corresponding harness assertion (A1-A13).
- STATE.md sync: completed_plans 9->11, percent 92->~95, last_updated
  2026-05-19T10:40:00Z; Current Position narrative replaced with Plan 01-13
  landing summary + outstanding Phase 1 gates (Plan 01-13 Task 9 operator
  checkpoint, Plan 01-10 welcome tab, Plan 01-12 design integration awaiting
  designer reply).

Verification (post-edit, docs-only — no src/ touched):
- npm run test:uat: 14/14 GREEN at d793c9e baseline preserved
- npx vitest: 94/94 (the no-test-hooks-in-prod-bundle.test.ts default 5s timeout
  flake is harness-side, not introduced by this commit; re-run with
  --testTimeout=60000 passes)
- git status post-commit: clean

Followup: ROADMAP.md is missing entries for Plans 01-08 through 01-12 (these were
all added mid-phase across multiple sessions and the roadmap was never amended;
the Phase-1 Plans block lines 74-80 stops at 01-07 and the progress table line
238 shows the stale '7/7 Complete' count). Backfilling those entries is a
separate concern — out of scope for Plan 01-13 closure per plan-checker flag #4
(hold the line; do not inject). STATE.md notes the counter > total mismatch for
visibility.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>