docs(01-12): state + roadmap + requirements — Plan 01-12 closure
Plan 01-12 closure documentation sync per the plan's Wave 7 Task 1
spec. Three docs land together as one atomic closure commit per the
Plan 01-13 + 01-14 closure cadence convention.
STATE.md changes:
- status: verifying → executing (Plan 01-10 welcome tab still pending)
- stopped_at: Plan 01-14 → Plan 01-12 closed via Wave 7 brand-fit
ack 2026-05-20 'all good'; Plan 01-10 remains as final Phase 1
functional plan
- last_updated + last_activity: 2026-05-19 → 2026-05-20
- progress.completed_plans: 12 → 13 (13 plans: 01-01..01-09 + 01-11
spike + 01-12 + 01-13 + 01-14; Plan 01-10 pending)
- progress.percent: 86 → 93
- "Plan 01-13 closure" header annotated: brand/design ack subsequently
closed via Plan 01-12 Wave 7 2026-05-20
- New "Plan 01-12 closure (2026-05-20)" section: 7-wave execution arc
with all 10 commit hashes (3fe018b plan-baseline-revision → 34a9ce1
Wave 0 → f86fd60 + abab6e1 Wave 1 → 7732a30 Wave 2 → 110cebc Wave 3
→ 468f16d Wave 4 → e8d2881 Wave 5 → b909c37 Wave 6 + 865d394
pre-checkpoint + f319c7d SUMMARY); R2 Lora substitution; 16 i18n
keys; branded icons; BADGE_REC_COLOR #b2543d; chrome.i18n fallback;
A18-A22 harness; pre-checkpoint bundle gates per
feedback-pre-checkpoint-bundle-gates.md; setimmediate polyfill
discovery logged to deferred-items.md (Phase 5 hardening); operator
brand-fit ack; Plan 01-13 Task 9 functional closure
- "Outstanding Phase 1 gates" updated: Plan 01-13 Task 9 + Plan 01-12
CLOSED; only Plan 01-10 remains
- Performance Metrics table: Plan 01-12 entry appended (~10h
cumulative; 10 tasks; ~50+ files)
- Decisions section: 2 new entries for Plan 01-12 design integration
+ Plan 01-13 Task 9 closure linkage
- Session Continuity: last/prior session updated to 2026-05-20 /
2026-05-19
ROADMAP.md changes:
- Phase 1 Plans list: 01-12-PLAN.md entry flipped from [ ] to [x]
with full closure annotation (R2 Lora self-host, tokens.css
canonical, 16 i18n keys across en+ru, branded Loom icons, manifest
i18n, BADGE_REC_COLOR madder #b2543d, chrome.i18n fallback,
harness A18-A22, operator brand-fit ack 2026-05-20 'all good')
- Phase 1 plan count: 13 → 14 plans (01-01 through 01-14)
- Progress table Phase 1 row: 7/7 Complete → 13/14 Executing with
closure-status disambiguation (functional via Plan 01-13;
design/brand via Plan 01-12; Plan 01-10 welcome tab remains)
REQUIREMENTS.md changes:
- REQ-install-clean: [ ] Pending → [x] Complete (2026-05-20)
with annotation: fresh build clean; zero remote-font CSP errors;
branded icons; en+ru manifest:name resolution; operator brand-fit
ack
- REQ-manifest-permissions: [ ] Pending → [x] Complete (2026-05-20)
with annotation: manifest:name + :description +
:action.default_title migrated to __MSG_*__ + default_locale='en';
manifest validation PASS; en↔ru parity; permissions DEC-011
baseline UNCHANGED
- Traceability table: both requirements moved from Phase 3/4 Pending
to "Phase 1 closure via Plan 01-12" Complete
- Footer: last-updated 2026-05-15 → 2026-05-20 with annotation
noting the requirements flipped at Plan 01-12 closure
No code changes; pure documentation closure sync.
Closure commit hashes:
- SUMMARY: f319c7d (.planning/phases/01-stabilize-video-pipeline/01-12-SUMMARY.md)
- State sync: this commit (.planning/STATE.md + .planning/ROADMAP.md
+ .planning/REQUIREMENTS.md)
Phase 1 status post-closure:
- Functional contract: CLOSED via Plan 01-13 harness PASS (2026-05-19)
- Design/brand contract: CLOSED via Plan 01-12 brand-fit ack
(2026-05-20)
- Remaining: Plan 01-10 (welcome tab) — operator-facing onboarding
surface; canonical src/shared/tokens.css from Plan 01-12 now
available for swap-in
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>