Phase 2 (Stabilize export pipeline) planning ceremony complete: - /gsd-discuss-phase 2 → 02-CONTEXT.md (cc042a5) with 3 locked decisions (D-P2-01 offscreen Blob URL; D-P2-02 meta.urls schema; D-P2-03 full scope) - /gsd-plan-phase 2 → 4 plans (0608b22) → revision iteration 1 per checker (9dcfcf0; B1 tabs permission + 4 informational flags resolved) → plan-checker iteration 2 GREEN → constraint sync (df8c086) - DEC-011 Amendment 1 landed: `tabs` permission added to manifest for D-P2-02 meta.urls feature HANDOFF.json + .continue-here.md capture: - 10 completed-this-session items (resume + researcher + Plan 01-14 + Plan 01-12 + Plan 01-10 cycle-2 + Phase 1 verifier + alpha distribution + re-phasing + Phase 2 discuss + Phase 2 plan) - 3 remaining tasks (Phase 2 execute, Phase 3 prep, Phase 4 optional) - 5 decisions this session - 2 advisory anti-patterns (/gsd-remove-phase CLI cascading bug; charter-shift-via-discuss-phase pattern) - Phase 4 backlog (8 items accumulated) - Test baselines (vitest 153, UAT 24, FORBIDDEN_HOOK_STRINGS 12) Branch identity preserved at gsd/phase-01-stabilize-video-pipeline per /gsd-plan-phase workflow invariant — ROADMAP phase rename does NOT mutate branch name. Alpha distribution shipped to testers in parallel: dist-archives/mokosh-build-2026-05-20-6dbed91.zip SHA256: 2a9ffe6797534d6a4cf5e040dccde8772245407483693efa17fdd1caca8b1f66 Next session: /gsd-resume-work → /gsd-execute-phase 2. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
8.2 KiB
context, phase, plan_count, status, last_updated
| context | phase | plan_count | status | last_updated |
|---|---|---|---|---|
| phase | 02-stabilize-export-pipeline | 4 | paused | 2026-05-20T12:54:42.079Z |
BLOCKING CONSTRAINTS — None
No blocking constraints introduced this session. Two advisory anti-patterns logged below (do not gate resumption).
Critical Anti-Patterns
| Pattern | Description | Severity | Prevention Mechanism |
|---|---|---|---|
/gsd-remove-phase CLI cascading rename |
gsd-sdk query phase.remove (and its /gsd-remove-phase Skill wrapper) has a bug at ~/.claude/get-shit-done/bin/lib/phase.cjs:670-679: reverse-iteration loop cascades renames — Phase 5→4, then 4→3 catches just-renamed-from-5, then 3→2 catches all → collapses subsequent phases to "Phase 2". Plus line 676 regex corrupts "2026-XX" → "2002-XX". Verified in this session's first /gsd-remove-phase 2 attempt; recovered via manual edits + revert. |
advisory | Upstream GSD-framework bug, NOT Mokosh-side. NEXT-SESSION: if removing a future phase, prefer manual ROADMAP/STATE/REQUIREMENTS edits over /gsd-remove-phase until upstream fixed. /gsd-discuss-phase + /gsd-plan-phase Skills work correctly. |
| Charter shift mid-project | User's "log is internal" realization mid-session triggered roadmap re-scope (Phase 2 DOM/privacy removed entirely). | advisory | Charter shifts are LEGITIMATE; user is the visionary. /gsd-discuss-phase is the canonical surface; PROJECT.md DEC-* table is where amendments land with provenance. |
Current State
Phase 2 (Stabilize export pipeline) PLANNING COMPLETE. Ready for execution.
- Branch:
gsd/phase-01-stabilize-video-pipelineat HEADdf8c086 - 4 plans validated + plan-checker iteration 2 GREEN
- Test baselines: vitest 153/153 GREEN · UAT 24/24 GREEN · build clean · Tier-1 FORBIDDEN_HOOK_STRINGS = 12 · production bundle hook-free
- Working tree: clean
- Alpha distribution shipped:
dist-archives/mokosh-build-2026-05-20-6dbed91.zip(testers running in parallel)
Plans Ready for Execution
| Plan | Wave | Type | Scope | Closes |
|---|---|---|---|---|
| 02-01 | 1 | tdd | RED tests scaffold — blob-url-download.test.ts + meta-json-urls-schema.test.ts + strict-meta-json-validation.test.ts; 15 it() blocks total |
Test contracts for D-P2-01/02/03 |
| 02-02 | 2 | auto | Blob URL pipeline — offscreen URL.createObjectURL + SW chrome.downloads.download(url) + onChanged revoke lifecycle; new PortMessageType (CREATE_DOWNLOAD_URL / DOWNLOAD_URL / REVOKE_DOWNLOAD_URL); depends_on [02-01] |
P0-6 |
| 02-03 | 2 | auto | meta.urls + tab-url-tracker module + manifest "tabs" permission + PROJECT.md DEC-011 Amendment 1 + manifest-i18n test update; depends_on [02-01] | P1 #10 |
| 02-04 | 3 | auto + human-verify | UAT harness A24-A28 (Blob URL, <5s latency, 8-field meta, multi-tab urls, archive-layout set-equality) + operator empirical UAT cycle 1; depends_on [02-02, 02-03] | Phase 2 closure |
Recent commit chain (most recent first)
df8c086docs(02): sync CON-manifest-permissions constraint with DEC-011 Amendment 19dcfcf0fix(02): revise plans per checker (B1 + 4 flags) — add tabs permission for D-P2-020608b22feat(02): plans 01-04 — Phase 2 export pipeline closure (Blob URL + meta.urls + schema + harness)cc042a5docs(02): capture phase context — discuss-phase complete6dbed91docs(roadmap): re-phase milestone — remove Phase 2 (DOM/event-capture privacy)586836fdocs(01): VERIFICATION + Phase 1 closure markers — goal-backward audit GREEN- (… Phase 1 closure commits earlier)
Required Reading (in order)
.planning/HANDOFF.json— machine-readable handoff (sibling to this file).planning/STATE.md— current progress (Phase 1 CLOSED; Phase 2 ready).planning/ROADMAP.md— post-re-phasing structure (4 phases now; Phase 2 = export).planning/REQUIREMENTS.md— REQ-meta-json-schema, REQ-archive-export-latency, etc..planning/PROJECT.md— DEC-011 Amendment 1 + CON-manifest-permissions sync.planning/phases/02-stabilize-export-pipeline/02-CONTEXT.md— D-P2-01/02/03 locked decisions + Revision Log.planning/phases/02-stabilize-export-pipeline/02-01-PLAN.md— first plan to execute (Wave 1 RED tests).planning/phases/02-stabilize-export-pipeline/02-02-PLAN.md— Wave 2 Blob URL pipeline.planning/phases/02-stabilize-export-pipeline/02-03-PLAN.md— Wave 2 meta.urls + tab-tracker + tabs permission.planning/phases/02-stabilize-export-pipeline/02-04-PLAN.md— Wave 3 harness + operator UAT- Auto-memory at
/home/parf/.claude/projects/-home-parf-projects-work-repremium/memory/MEMORY.md— feedback constraints from prior sessions
Decisions Locked This Session
- DEC-011 Amendment 1 (committed
9dcfcf0):tabsadded to manifest permissions for Phase 2 D-P2-02 meta.urls feature. Audit T-1-02 acknowledged but overridden — permission is genuinely USED. - D-P2-01 (in 02-CONTEXT.md): Offscreen-minted Blob URL pipeline replaces base64 data: URL download. Closes audit P0-6.
- D-P2-02 (in 02-CONTEXT.md): meta.json schema migrates
url:string→urls:string[]. Closes audit P1 #10. SessionMetadata interface + CON-meta-json-schema both amended. - D-P2-03 (in 02-CONTEXT.md): Full scope = bug fixes + strict schema validation + harness <5s latency assertion. ~3-4 plans (4 produced).
- Re-phasing 2026-05-20 (committed
6dbed91): Original Phase 2 (DOM/event-capture privacy) REMOVED entirely. REQ-rrweb-dom-buffer + REQ-user-event-log absorbed by new Phase 3 (SPEC §10 smoke). REQ-password-confidentiality → Out of Scope (v1). Total phases 5 → 4.
Next-Session Order of Operations
/gsd-resume-workto load this.continue-here.md+.planning/HANDOFF.json- Acknowledge any blocking constraints (none this time; only advisory anti-patterns above)
/gsd-execute-phase 2to start Phase 2 execution (canonical Skill)- Alternative:
/gsd-execute-phase 2 --wave 1lands just the RED tests scaffold (~15-30min) for tomorrow's first iteration
- Alternative:
- After Phase 2 closes:
/gsd-verify-work 2(canonical Phase 2 goal-backward audit) - After Phase 2 marker flip:
/gsd-discuss-phase 3(new Phase 3 = SPEC §10 smoke + DOM/event-log verification absorbed from old Phase 2) - Phase 3 → Phase 4 (optional) per ROADMAP
Infrastructure State
- Branch:
gsd/phase-01-stabilize-video-pipelineat HEADdf8c086— branch name preserved per /gsd-plan-phase workflow invariant (branch identity is owned by user's git workflow; ROADMAP phase rename does NOT mutate branch name) - Build clean:
npm run build2.87s;dist/reflects current code state (post-re-phasing, post-Plan-01-10, post-all-debug-fixes) - Alpha distribution:
dist-archives/mokosh-build-2026-05-20-6dbed91.zip+ INSTALL.md (testers running in parallel) - Two pre-existing vitest flakes (ffprobe/ffmpeg) deferred to Phase 4 hardening; do NOT block Phase 2
Phase 4 Backlog (informational; not gating Phase 2)
Accumulated through this session for future Phase 4 hardening:
- 2 pre-existing vitest flakes (ffprobe/ffmpeg)
setimmediatepolyfillnew Functionin SW chunk viavite-plugin-node-polyfills(pre-existing)getDisplayMediacursor visibility refinement (Plan 01-07 operator observation 2026-05-15)- Dark-surface logo contrast (Plan 01-10 operator observation 2026-05-20)
- rrweb 2.0.0-alpha.4 → stable v2 upgrade research (in Phase 3 plans now? or defer to Phase 4)
- ROADMAP backfill for Plans 01-08..01-13 entries (Plan 01-13 plan-checker flag #4)
- REQ-password-confidentiality v2 candidate
- Audit P1 #11 (fetch Request→[object Request]), #14 (navigation URL), #15 (rrweb timestamp semantics)
Context
Massive session: 2026-05-19 morning → 2026-05-20 afternoon overnight. Phase 1 closed end-to-end (14/14 plans + 5 operator acks + verifier GREEN); alpha distributed; charter shifted ("log is internal"); roadmap re-phased; Phase 2 fully planned + validated. User explicitly chose canonical GSD ceremony throughout: /gsd-discuss-phase + /gsd-plan-phase + plan-checker revision loop all worked correctly (only /gsd-remove-phase had the upstream CLI bug; recovered manually). Phase 2 is ready to execute as soon as next session opens.
Next action
Start with: /gsd-resume-work to load this handoff, then /gsd-execute-phase 2 to start Phase 2 execution.