Full re-plan via /gsd-plan-phase ceremony. The prior 04-06-PLAN.md hit a
blocking checkpoint (plan-assumption defect). Three defects corrected;
thesis preserved (dark-logo currentColor Option A + cursor verification-only
+ A17.8 + operator-empirical Task 4).

DEFECT 1 — false jsdom premise: prior Task 1 assumed vitest configures a
jsdom environment. FALSE — vitest.config.ts:18 sets environment:'node' and
no DOM-emulation library is in node_modules. Resolution: STRATEGY (a) —
reframe tests/welcome/inline-svg.test.ts as a node-env source-contract test
(the canonical tests/i18n/manifest-i18n.test.ts file-read + string-assert
pattern); delegate live-DOM injection + currentColor cascade verification to
the A17.8 harness sub-check in real Chrome. Rejected (b) jsdom devDependency
(deviates from a twice-reaffirmed no-DOM-library stance) and (c) manual
DOMParser stub (fragile for SVG-namespace fidelity).

DEFECT 2 — stale back-patch line numbers: verified the genuine stale
'deferred to Phase 5' lines in 01-07-SUMMARY.md are 22/47/82/135/205;
historical commit-description lines 40/89/109/110 left unchanged.

DEFECT 3 — wrong vitest baseline: real baseline is 183 GREEN / 1 pre-existing
RED (strict-meta-json-validation.test.ts, logged to deferred-items.md, routed
to /gsd-debug). Test-count target reframed to 187 GREEN / 1 pre-existing RED.

revision_history block added. files_modified updated (welcome.css dropped —
the bare class selector matches <svg> identically; no CSS edit needed).
must_haves truths/artifacts/key_links updated to match the corrected plan.
frontmatter.validate + verify.plan-structure both green.