docs(state): record phase 3 UI-SPEC session — null-spec approved 6/6 dimensions

state.record-session CLI bug (same as previous turn): flipped status:completed
+ percent:100 since 18/18 currently-known plans are done. Restored:
status:ready_to_plan, percent:50 (2/4 phases truly complete).

UI-SPEC.md at:
  .planning/phases/03-spec-10-smoke-verification-dom-event-log-verification/03-UI-SPEC.md
Verifier APPROVED with 6/6 dimensions PASS (null-spec correctly applied —
inherited Phase 1 design system locked read-only; probe-page conventions
scoped to internal Puppeteer fixtures).

Next: /gsd-plan-phase 3 (preferences preserved at .plan-phase-preferences.md
auto-deletes when consumed).

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
This commit is contained in:
2026-05-20 18:06:09 +02:00
parent 03d4b3343c
commit 0d2bc74dae

View File

@@ -3,8 +3,8 @@ gsd_state_version: 1.0
milestone: v2.0.0
milestone_name: milestone
status: ready_to_plan
stopped_at: Phase 3 context gathered — 5 plans + 4 D-P3-* locked decisions; ready for /gsd-plan-phase 3
last_updated: "2026-05-20T15:55:50.099Z"
stopped_at: Phase 3 UI-SPEC approved (null-spec; verification-only; 6/6 dimensions PASS) — ready for /gsd-plan-phase 3 (preferences preserved at .plan-phase-preferences.md)
last_updated: "2026-05-20T16:05:48.025Z"
last_activity: 2026-05-20
progress:
total_phases: 4
@@ -215,9 +215,9 @@ Items acknowledged and carried forward from previous milestone close:
## Session Continuity
Last session: 2026-05-20T15:55:50.071Z
Stopped at: Phase 3 context gathered — 5 plans + 4 D-P3-* locked decisions; ready for /gsd-plan-phase 3
Resume file: .planning/phases/03-spec-10-smoke-verification-dom-event-log-verification/03-CONTEXT.md
Last session: 2026-05-20T16:05:47.999Z
Stopped at: Phase 3 UI-SPEC approved (null-spec; verification-only; 6/6 dimensions PASS)
Resume file: .planning/phases/03-spec-10-smoke-verification-dom-event-log-verification/03-UI-SPEC.md
Prior session: 2026-05-20T12:54:42.000Z — /gsd-pause-work saved Phase 2 execution-ready handoff (a440c7d); Phase 1 closed end-to-end via verifier audit GREEN (586836f); alpha distribution shipped (dist-archives/mokosh-build-2026-05-20-6dbed91.zip)
Earlier session: 2026-05-20T12:00:00.000Z — Plan 01-10 closed via cycle-2 operator ack "All good" + 5 inter-cycle debug fixes + brand-rename follow-up