docs(04-07): closure markers — REQUIREMENTS + ROADMAP + STATE + PROJECT for Phase 4 v1 close-prep

Task 2 of Plan 04-07 — 4 marker file flips landing Phase 4 closure-prep
(NOT formal Phase 4 closure; that happens at the ceremony AFTER the
independent gsd-verifier audit per Phase 1-3 precedent).

ROADMAP.md:
- Plan 04-07 row flipped [ ] → [x] with full closure annotation (04-VERIFICATION.md
  citation + Phase 4 cumulative totals + D-P4-05 backfill verification + closure-
  ceremony deferral note)
- Phase 4 progress table cell updated 7/8 → 8/8 with full closure-prep narrative
- Phase 4 row [ ] LEFT UNFLIPPED — verifier audit + closure ceremony flips it

STATE.md:
- progress.completed_plans: 29 → 30 + progress.percent: 93 → 97
- progress.completed_phases: 3 (UNCHANGED) + status: executing (UNCHANGED)
- stopped_at + last_updated + last_activity updated for Plan 04-07 closure
- Current Position block updated to reflect Plan 04-07 completion + pending
  closure ceremony
- Plan 04-07 closure section added at top of body
- Performance metrics row added for Phase 04 P07
- Session Continuity entry prepended for Plan 04-07
- 2 Phase 04-07 decisions appended to Decisions list

REQUIREMENTS.md:
- 4 Phase 4 closure notes appended to existing REQ blocks (no existing REQ-*
  lines modified):
  - REQ-video-ring-buffer: ROADMAP SC #1 via Plan 04-08 (methodology reframe)
  - REQ-rrweb-dom-buffer: A29 cs-injection-world + UAT 33→36 GREEN summary
  - REQ-user-event-log: ROADMAP SC #2 via Plan 04-05 + audit P1 #11/#14/#15
    via Plan 04-01
  - REQ-install-clean: ROADMAP SC #3/SC #4/Plan 04-02 build hygiene + Plan
    04-08 Tier-2 leak gate
- Trailing footer line updated with 2026-05-26 Phase 4 closure citation

PROJECT.md:
- NEW Validated in Phase 4 section added (7 bullets covering all closures)
- Active section evolved from Phase 4 backlog → Phase 4 closure-ceremony
  workstream + Deferred-to-v1.1/v2 maintenance milestone items
- Trailing footer line updated with 2026-05-26 Phase 4 closure citation

Acceptance criteria gates (all PASS per Plan 04-07 Task 2):
- ROADMAP.md 04-07 row [x] = 1
- ROADMAP.md Phase 4 row [x] = 0 (correctly LEFT unflipped)
- STATE.md completed_phases: 3 = 2 (frontmatter + body — UNCHANGED per spec)
- STATE.md completed_plans: 30 = 1 (incremented by 1)
- STATE.md status: executing = 1 (UNCHANGED per spec)
- REQUIREMENTS.md "Phase 4 closure note" mentions = 4 (>= 3)
- PROJECT.md "Validated in Phase 4" section = 1
- git diff --stat HEAD~1 HEAD shows only .planning/ files dirty (T-04-07-02
  threat mitigation gate honored — docs-only commit; no source/test changes)

Phase 4 row + completed_phases bump + status:completed flip explicitly
DEFERRED to closure ceremony after the independent gsd-verifier audit
per Phase 1-3 precedent (executor creates VERIFICATION.md; verifier
independently re-validates with goal-backward audit; orchestrator flips
markers post-verifier-audit).
This commit is contained in:
2026-05-26 14:08:17 +02:00
parent 7a69865843
commit 5d0b40c9b6
4 changed files with 113 additions and 28 deletions

View File

@@ -42,23 +42,31 @@ output.
- [x] 10 min user/runtime event log (REQ-user-event-log; A30 harness coverage verifies all 5 UserEvent types — click + input + navigation + js_error + network_error; password filtering verified via A31 PARTIAL per D-P3-02 charter)
- [x] SPEC §10 full acceptance criteria sweep #1-#9 — Phase 1 (§10 #1/#2/#3/#7) + Phase 2 (§10 #6) + Phase 3 (§10 #4/#5/#8 PARTIAL/#9 best-effort) — 03-VERIFICATION.md aggregates evidence with T5 override pattern
**Validated in Phase 4 (closed 2026-05-26 via executor-created aggregator 04-VERIFICATION.md; pending independent gsd-verifier audit + closure-ceremony marker flips):**
- [x] All 4 ROADMAP success criteria CLOSED (SC #1 SW state persistence via Plan 04-08 methodology reframe — HTMLVideoElement.captureStream replaces canvas.captureStream; 1.8 MB videoSize vs 8505 baseline; SC #2 fetch + XHR network_error empirical via Plan 04-05 A34 — 2 entries with meta.status===404; SC #3 generate-icons ESM/CJS via Plan 04-02 `git mv .js → .cjs`; SC #4 dead-code grep via Plan 04-02 tests/build/dead-code-grep.test.ts regression pin)
- [x] All 3 audit P1 polish items CLOSED (P1 #11 fetch URL extraction + P1 #14 navigation URL tracking + P1 #15 rrweb timestamp normalization — all via Plan 04-01 D-P4-02 single dedicated TDD plan; src/content/index.ts surgical edits + 9 unit tests at NEW tests/content/ directory)
- [x] All 6 cross-cutting hardening items GREEN (setimmediate polyfill 4-mechanism mitigation via Plan 04-02; A29 cs-injection-world rewrite via Plan 04-03 — 5/5 PASS stress vs ~2/3 historical; cursor visibility regression-pinned via Plan 04-06 — shipped opportunistically by Plan 01-09; dark-surface logo contrast via Plan 04-06 — currentColor + DOMParser inline-SVG + NEW `--mks-mark-stroke` brand-component token decoupled from theme-flipping `--mks-fg-inverse` semantic token)
- [x] D-P4-02 + D-P4-03 + D-P4-05 charters CLOSED (D-P4-02 all 3 audit P1 polish items via Plan 04-01; D-P4-03 both visual polish items via Plan 04-06; D-P4-05 ROADMAP backfill verification for Plans 01-08..01-14 via Plan 04-07). D-P4-01 + D-P4-04 honored throughout (D-P4-01 full Phase 4 scope; D-P4-04 alpha out-of-band).
- [x] Cross-cutting gates: UAT harness 33 → 36 GREEN (+A33 + A34 + A35 with 5 sub-checks incl. A35.5 light+dark equality decouple-proof); vitest 171 → 188 GREEN (+17 tests across Plans 04-01/02/06/08); pre-checkpoint bundle gates 6/6 PASS (Gate 2 polarity flipped 1 → 0 via Plan 04-02 — closes Plan 01-12 Wave 7 setimmediate deferred-items entry end-to-end); Tier-1 FORBIDDEN_HOOK_STRINGS unchanged at 12; NEW Tier-2 production-bundle filename-leak gate added by Plan 04-08
- [x] /gsd-debug sessions: 3 documented + resolved (canvas-throttling sessions 1+2 → REFUTED-architecture verdict authorizing Plan 04-08 insertion; Plan 04-06 dark-mode mark decoupling → fix at commit a8bcc17; A33.1 SAVE-ack race → fix at commit 7e0da63)
- [x] Operator-empirical ack 2026-05-26 verbatim "Confirmed fixed — close Plan 04-06" (Plan 04-06 Task 4 cycle-2 after debug-fix; canonical aesthetics-judgment-is-non-automatable case per `feedback-trust-harness-over-manual-uat.md`)
### Active
<!-- Current scope. Building toward these. See REQUIREMENTS.md for IDs. -->
**Phase 4 (Harden + clean up — optional):**
- Phase 5-style P1/P2 follow-ups + accumulated session backlog (12 deferred items in 03-VERIFICATION.md):
- rrweb v2 stable upgrade (D-P3-03 defer)
- Programmatic SW-context RAM measurement via chrome.devtools Memory API (D-P3-04 defer)
- REQ-password-confidentiality v2 candidate (only if charter reverses)
- A29 iana.org leftover race (cs-injection-world is natural fix candidate per Plan 03-02)
- Pre-existing ffprobe/ffmpeg vitest intermittent flake
- getDisplayMedia cursor visibility refinement (Plan 01-07 obs)
- Dark-surface logo contrast (Plan 01-10 obs)
- setimmediate polyfill hardening (Plan 01-12 obs)
- Audit P1 #11/#14/#15 polish (fetch Request→[object], navigation URL, rrweb timestamp semantics)
**Phase 4 closure ceremony (post Plan 04-07):**
- Independent gsd-verifier audit of `.planning/phases/04-harden-clean-up-optional/04-VERIFICATION.md` (Phase 1-3 precedent — verifier re-validates executor-created aggregator with goal-backward audit)
- ROADMAP.md Phase 4 row `[ ]``[x]` flip + CLOSED 2026-05-26 annotation
- STATE.md `progress.completed_phases: 3 → 4` + `progress.percent: 97 → 100` + `status: executing → completed` flip
- v1.0 tag + release notes + alpha redistribution (separate workstream per D-P4-04 charter — user-routed out-of-band)
**Milestone v1 may close at Phase 3** if Phase 4 is deferred to v2 — Phase 4 is explicitly optional per ROADMAP.
**Deferred to v1.1 / v2 maintenance milestones:**
- rrweb 2.0.0-alpha.4 → stable v2 upgrade (D-P3-03 + D-P4-01 charter; alpha-pin stable across all 31 plans + 36/36 UAT GREEN)
- Programmatic SW-context RAM measurement via chrome.devtools.Memory API (D-P3-04 + D-P4-01 charter; A32 best-effort + chrome://memory-internals + alpha distribution coverage accepted)
- REQ-password-confidentiality v2 candidate (D-P3-02 charter shift 2026-05-20 — only revisit if charter reverses on "we don't care about privacy hardening")
- A29/A30/A31 cs-injection-world flake family (intermittent in full-suite runs; A29 specifically CLOSED via Plan 04-03 strict-sentinel; A30/A31 NOT in Plan 04-03 charter)
- 04-CONTEXT #9/#10 parallel-vitest ffprobe-timeout flake family (true clean baseline corrected to 188/188 GREEN; canonical Vitest mitigation: poolOptions.threads.singleThread:true OR raised testTimeout)
### Out of Scope
@@ -179,4 +187,4 @@ The verbatim list lives in REQUIREMENTS.md under "Phase 1 Acceptance Criteria
(SPEC §10 verbatim)".
---
*Last updated: 2026-05-20 — Phase 3 closure (verifier audit PASSED 5/5 ROADMAP + 9/9 SPEC §10 with 4 overrides; REQ-rrweb-dom-buffer + REQ-user-event-log + SPEC §10 sweep all moved Active → Validated; §10 #9 RAM user-acked on A32 best-effort + alpha distribution coverage). Prior: 2026-05-20 Phase 2 closure; 2026-05-15 initial bootstrap.*
*Last updated: 2026-05-26 — Phase 4 closure aggregator created via Plan 04-07 (`.planning/phases/04-harden-clean-up-optional/04-VERIFICATION.md`; 253 lines; 4/4 ROADMAP SC + 3/3 audit P1 + 6/6 hardening items GREEN; UAT 36/36 + vitest 188/188 + 6/6 bundle gates + Tier-1=12 + NEW Tier-2; 3 /gsd-debug sessions; operator empirical ack "Confirmed fixed — close Plan 04-06" 2026-05-26). Phase 4 row [x] flip + completed_phases 3→4 + status:completed flip DEFERRED to closure ceremony after independent gsd-verifier audit (Phase 1-3 precedent). Prior: 2026-05-20 Phase 3 closure (verifier audit PASSED 5/5 ROADMAP + 9/9 SPEC §10 with 4 overrides); 2026-05-20 Phase 2 closure; 2026-05-15 initial bootstrap.*