docs: bootstrap .planning/ via /gsd-ingest-docs (2 docs) /home/parf/projects/work/repremium/.planning/PROJECT.md /home/parf/projects/work/repremium/.planning/REQUIREMENTS.md /home/parf/projects/work/repremium/.planning/ROADMAP.md /home/parf/projects/work/repremium/.planning/STATE.md /home/parf/projects/work/repremium/.planning/intel /home/parf/projects/work/repremium/.planning/INGEST-CONFLICTS.md /home/parf/projects/work/repremium/.ingest-manifest.yaml
This commit is contained in:
85
.planning/STATE.md
Normal file
85
.planning/STATE.md
Normal file
@@ -0,0 +1,85 @@
|
||||
# Project State
|
||||
|
||||
## Project Reference
|
||||
|
||||
See: .planning/PROJECT.md (updated 2026-05-15)
|
||||
|
||||
**Core value:** When an operator hits a bug, one click MUST produce a
|
||||
self-contained archive that lets support reproduce what happened — in under 5 s,
|
||||
no server, no password leaks.
|
||||
**Current focus:** Phase 1 — Stabilize video pipeline
|
||||
|
||||
## Current Position
|
||||
|
||||
Phase: 1 of 5 (Stabilize video pipeline)
|
||||
Plan: 0 of TBD in current phase
|
||||
Status: Ready to plan
|
||||
Last activity: 2026-05-15 — bootstrap from intel synthesis (PROJECT.md,
|
||||
REQUIREMENTS.md, ROADMAP.md, STATE.md written)
|
||||
|
||||
Progress: [░░░░░░░░░░] 0%
|
||||
|
||||
## Performance Metrics
|
||||
|
||||
**Velocity:**
|
||||
- Total plans completed: 0
|
||||
- Average duration: —
|
||||
- Total execution time: —
|
||||
|
||||
**By Phase:**
|
||||
|
||||
| Phase | Plans | Total | Avg/Plan |
|
||||
|-------|-------|-------|----------|
|
||||
| 1. Stabilize video pipeline | 0 | — | — |
|
||||
| 2. Stabilize DOM + event capture privacy | 0 | — | — |
|
||||
| 3. Stabilize export pipeline | 0 | — | — |
|
||||
| 4. SPEC §10 smoke verification | 0 | — | — |
|
||||
| 5. Harden + clean up | 0 | — | — |
|
||||
|
||||
**Recent Trend:**
|
||||
- Last 5 plans: —
|
||||
- Trend: —
|
||||
|
||||
*Updated after each plan completion*
|
||||
|
||||
## Accumulated Context
|
||||
|
||||
### Decisions
|
||||
|
||||
Decisions are logged in PROJECT.md Key Decisions table (DEC-001 through
|
||||
DEC-012, all SPEC-Accepted and locked for Phase 1). Recent decisions affecting
|
||||
current work:
|
||||
|
||||
- Phase 1 framing: roadmap treats the existing codebase as a partially-broken
|
||||
first attempt to be remediated against the SPEC, not as greenfield. The
|
||||
7 P0 defects from the audit are split across phases 1–3 along commit
|
||||
boundaries; phase 4 is end-to-end SPEC §10 smoke verification.
|
||||
- All 12 SPEC decisions (`DEC-001`..`DEC-012`) are LOCKED for Phase 1.
|
||||
Changing any of them requires a formal ADR; none are formally LOCKED in the
|
||||
ingest classification, so a future ADR can revise.
|
||||
|
||||
### Pending Todos
|
||||
|
||||
None yet.
|
||||
|
||||
### Blockers/Concerns
|
||||
|
||||
- (informational) `chrome.tabCapture` requires a user gesture on first
|
||||
activation — Phase 3 (P0-4) restores this by moving the call into the popup
|
||||
click handler; until Phase 3 lands, recording cannot start cleanly even if
|
||||
Phase 1's pipeline is correct. Phases 1–3 should not be re-ordered.
|
||||
|
||||
## Deferred Items
|
||||
|
||||
Items acknowledged and carried forward from previous milestone close:
|
||||
|
||||
| Category | Item | Status | Deferred At |
|
||||
|----------|------|--------|-------------|
|
||||
| *(none)* | | | |
|
||||
|
||||
## Session Continuity
|
||||
|
||||
Last session: 2026-05-15 — bootstrap
|
||||
Stopped at: Wrote PROJECT.md, REQUIREMENTS.md, ROADMAP.md, STATE.md from
|
||||
intel synthesis. Coverage validated: 11/11 v1 REQs mapped.
|
||||
Resume file: None — ready for `/gsd-plan-phase 1`.
|
||||
Reference in New Issue
Block a user