Project State
Project Reference
See: .planning/PROJECT.md (updated 2026-05-15)
Core value: When an operator hits a bug, one click MUST produce a self-contained archive that lets support reproduce what happened — in under 5 s, no server, no password leaks. Current focus: Phase 1 — Stabilize video pipeline
Current Position
Phase: 1 of 5 (Stabilize video pipeline) Plan: 0 of TBD in current phase Status: Ready to plan Last activity: 2026-05-15 — bootstrap from intel synthesis (PROJECT.md, REQUIREMENTS.md, ROADMAP.md, STATE.md written)
Progress: [░░░░░░░░░░] 0%
Performance Metrics
Velocity:
- Total plans completed: 0
- Average duration: —
- Total execution time: —
By Phase:
| Phase | Plans | Total | Avg/Plan |
|---|---|---|---|
| 1. Stabilize video pipeline | 0 | — | — |
| 2. Stabilize DOM + event capture privacy | 0 | — | — |
| 3. Stabilize export pipeline | 0 | — | — |
| 4. SPEC §10 smoke verification | 0 | — | — |
| 5. Harden + clean up | 0 | — | — |
Recent Trend:
- Last 5 plans: —
- Trend: —
Updated after each plan completion
Accumulated Context
Decisions
Decisions are logged in PROJECT.md Key Decisions table (DEC-001 through DEC-012, all SPEC-Accepted and locked for Phase 1). Recent decisions affecting current work:
- Phase 1 framing: roadmap treats the existing codebase as a partially-broken first attempt to be remediated against the SPEC, not as greenfield. The 7 P0 defects from the audit are split across phases 1–3 along commit boundaries; phase 4 is end-to-end SPEC §10 smoke verification.
- All 12 SPEC decisions (
DEC-001..DEC-012) are LOCKED for Phase 1. Changing any of them requires a formal ADR; none are formally LOCKED in the ingest classification, so a future ADR can revise.
Pending Todos
None yet.
Blockers/Concerns
- (informational)
chrome.tabCapturerequires a user gesture on first activation — Phase 3 (P0-4) restores this by moving the call into the popup click handler; until Phase 3 lands, recording cannot start cleanly even if Phase 1's pipeline is correct. Phases 1–3 should not be re-ordered.
Deferred Items
Items acknowledged and carried forward from previous milestone close:
| Category | Item | Status | Deferred At |
|---|---|---|---|
| (none) |
Session Continuity
Last session: 2026-05-15 — bootstrap
Stopped at: Wrote PROJECT.md, REQUIREMENTS.md, ROADMAP.md, STATE.md from
intel synthesis. Coverage validated: 11/11 v1 REQs mapped.
Resume file: None — ready for /gsd-plan-phase 1.