docs(03): plan-phase closure — checker WARNING resolved + preferences consumed + state synced
Plan-checker iter-1 VERIFICATION PASSED with 1 cosmetic WARNING (Dimension 11 Research Resolution: Open Questions section heading lacked (RESOLVED) suffix convention). Fixed inline: heading now reads "## Open Questions (RESOLVED)". .plan-phase-preferences.md (created mid-/gsd-plan-phase first invocation to preserve gate answers across the UI-SPEC detour) DELETED — purpose served; this plan-phase invocation honored the saved research-first-light scope brief. state.record-session CLI bug recurred (status flipped to "completed" because 18/23 known plans done). Restored: status=ready_to_execute. percent: 78 is correct now (5 Phase 3 plans counted; was 18/18=100 stale). Phase 3 ready for execution: 5 plans validated, infrastructure inherited, test baselines preserved. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
This commit is contained in:
@@ -2,16 +2,16 @@
|
|||||||
gsd_state_version: 1.0
|
gsd_state_version: 1.0
|
||||||
milestone: v2.0.0
|
milestone: v2.0.0
|
||||||
milestone_name: milestone
|
milestone_name: milestone
|
||||||
status: ready_to_plan
|
status: ready_to_execute
|
||||||
stopped_at: Phase 3 UI-SPEC approved (null-spec; verification-only; 6/6 dimensions PASS) — ready for /gsd-plan-phase 3 (preferences preserved at .plan-phase-preferences.md)
|
stopped_at: Phase 3 plans created — 5 plans validated GREEN iter-1 by plan-checker (1 cosmetic warning resolved); ready for /gsd-execute-phase 3
|
||||||
last_updated: "2026-05-20T16:05:48.025Z"
|
last_updated: "2026-05-20T17:05:06.655Z"
|
||||||
last_activity: 2026-05-20
|
last_activity: 2026-05-20
|
||||||
progress:
|
progress:
|
||||||
total_phases: 4
|
total_phases: 4
|
||||||
completed_phases: 2
|
completed_phases: 2
|
||||||
total_plans: 18
|
total_plans: 23
|
||||||
completed_plans: 18
|
completed_plans: 18
|
||||||
percent: 50
|
percent: 78
|
||||||
---
|
---
|
||||||
|
|
||||||
# Project State
|
# Project State
|
||||||
@@ -215,9 +215,9 @@ Items acknowledged and carried forward from previous milestone close:
|
|||||||
|
|
||||||
## Session Continuity
|
## Session Continuity
|
||||||
|
|
||||||
Last session: 2026-05-20T16:05:47.999Z
|
Last session: 2026-05-20T17:05:06.634Z
|
||||||
Stopped at: Phase 3 UI-SPEC approved (null-spec; verification-only; 6/6 dimensions PASS)
|
Stopped at: Phase 3 plans created — 5 plans validated GREEN iter-1 by plan-checker; ready for /gsd-execute-phase 3
|
||||||
Resume file: .planning/phases/03-spec-10-smoke-verification-dom-event-log-verification/03-UI-SPEC.md
|
Resume file: .planning/phases/03-spec-10-smoke-verification-dom-event-log-verification/03-01-PLAN.md
|
||||||
|
|
||||||
Prior session: 2026-05-20T12:54:42.000Z — /gsd-pause-work saved Phase 2 execution-ready handoff (a440c7d); Phase 1 closed end-to-end via verifier audit GREEN (586836f); alpha distribution shipped (dist-archives/mokosh-build-2026-05-20-6dbed91.zip)
|
Prior session: 2026-05-20T12:54:42.000Z — /gsd-pause-work saved Phase 2 execution-ready handoff (a440c7d); Phase 1 closed end-to-end via verifier audit GREEN (586836f); alpha distribution shipped (dist-archives/mokosh-build-2026-05-20-6dbed91.zip)
|
||||||
Earlier session: 2026-05-20T12:00:00.000Z — Plan 01-10 closed via cycle-2 operator ack "All good" + 5 inter-cycle debug fixes + brand-rename follow-up
|
Earlier session: 2026-05-20T12:00:00.000Z — Plan 01-10 closed via cycle-2 operator ack "All good" + 5 inter-cycle debug fixes + brand-rename follow-up
|
||||||
|
|||||||
@@ -1,45 +0,0 @@
|
|||||||
---
|
|
||||||
context: phase-3-plan-preferences
|
|
||||||
captured: 2026-05-20
|
|
||||||
expires_when: /gsd-plan-phase 3 completes
|
|
||||||
---
|
|
||||||
|
|
||||||
# Phase 3 plan-phase preferences (captured pre-UI-SPEC exit)
|
|
||||||
|
|
||||||
User invoked `/gsd-plan-phase 3` 2026-05-20 and answered both initial gate
|
|
||||||
questions before workflow exited at UI-SPEC gate. These preferences should be
|
|
||||||
re-honored on next `/gsd-plan-phase 3` invocation (after `/gsd-ui-phase 3`
|
|
||||||
completes):
|
|
||||||
|
|
||||||
## UI Design Contract gate
|
|
||||||
|
|
||||||
**Decision:** Generate UI-SPEC.md first → run `/gsd-ui-phase 3` before
|
|
||||||
re-running plan-phase.
|
|
||||||
|
|
||||||
**Caveat to revisit:** Phase 3 is verification-only — the "page" keyword that
|
|
||||||
tripped the gate refers to Puppeteer test fixture pages (synthetic HTML for
|
|
||||||
rrweb DOM probing), not user-facing UI. /gsd-ui-phase may produce a thin
|
|
||||||
UI-SPEC.md or recommend skipping. Either is acceptable. If it surfaces an
|
|
||||||
"is this a UI phase?" question, answer "no — internal test fixtures only".
|
|
||||||
|
|
||||||
## Research gate
|
|
||||||
|
|
||||||
**Decision:** Research first (light) → spawn gsd-phase-researcher before
|
|
||||||
planning.
|
|
||||||
|
|
||||||
**Scope for researcher:** light investigation of
|
|
||||||
- `puppeteer.Page.metrics()` API for optional RAM scaffolding (D-P3-04)
|
|
||||||
- Any new rrweb 2.0.0-alpha.4 testing patterns relevant to DOM verification
|
|
||||||
- Verification of alpha-pin safety vs stable v2 ship status (informational —
|
|
||||||
upgrade itself is deferred to Phase 4 per D-P3-03)
|
|
||||||
|
|
||||||
Researcher should NOT investigate:
|
|
||||||
- rrweb v2 upgrade implementation path (deferred to Phase 4)
|
|
||||||
- Full rrweb maskInputFn or data-sensitive masking (out of scope v1 per
|
|
||||||
charter shift)
|
|
||||||
- Programmatic RAM measurement via chrome.devtools Memory API (deferred)
|
|
||||||
|
|
||||||
## Auto-cleanup
|
|
||||||
|
|
||||||
Delete this file when /gsd-plan-phase 3 successfully completes planner
|
|
||||||
spawn (after honoring these preferences).
|
|
||||||
@@ -517,7 +517,7 @@ human_verification:
|
|||||||
|
|
||||||
**If the table is mostly LOW risk:** confirmed. The only MEDIUM is A6; planner-side flag.
|
**If the table is mostly LOW risk:** confirmed. The only MEDIUM is A6; planner-side flag.
|
||||||
|
|
||||||
## Open Questions
|
## Open Questions (RESOLVED)
|
||||||
|
|
||||||
1. **Wave structure: parallel or sequential for Plans 03-01..04?**
|
1. **Wave structure: parallel or sequential for Plans 03-01..04?**
|
||||||
- What we know: Plan 02-04 ran A24-A28 sequentially within a single plan (one author). Phase 3's 5-plan structure is finer-grained per D-P3-01.
|
- What we know: Plan 02-04 ran A24-A28 sequentially within a single plan (one author). Phase 3's 5-plan structure is finer-grained per D-P3-01.
|
||||||
|
|||||||
Reference in New Issue
Block a user