docs(03): plan-phase closure — checker WARNING resolved + preferences consumed + state synced

Plan-checker iter-1 VERIFICATION PASSED with 1 cosmetic WARNING (Dimension 11
Research Resolution: Open Questions section heading lacked (RESOLVED) suffix
convention). Fixed inline: heading now reads "## Open Questions (RESOLVED)".

.plan-phase-preferences.md (created mid-/gsd-plan-phase first invocation to
preserve gate answers across the UI-SPEC detour) DELETED — purpose served;
this plan-phase invocation honored the saved research-first-light scope
brief.

state.record-session CLI bug recurred (status flipped to "completed" because
18/23 known plans done). Restored: status=ready_to_execute. percent: 78 is
correct now (5 Phase 3 plans counted; was 18/18=100 stale).

Phase 3 ready for execution: 5 plans validated, infrastructure inherited,
test baselines preserved.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
This commit is contained in:
2026-05-20 19:06:00 +02:00
parent b3bfbf4a8d
commit de3f14722f
3 changed files with 9 additions and 54 deletions

View File

@@ -2,16 +2,16 @@
gsd_state_version: 1.0 gsd_state_version: 1.0
milestone: v2.0.0 milestone: v2.0.0
milestone_name: milestone milestone_name: milestone
status: ready_to_plan status: ready_to_execute
stopped_at: Phase 3 UI-SPEC approved (null-spec; verification-only; 6/6 dimensions PASS) — ready for /gsd-plan-phase 3 (preferences preserved at .plan-phase-preferences.md) stopped_at: Phase 3 plans created — 5 plans validated GREEN iter-1 by plan-checker (1 cosmetic warning resolved); ready for /gsd-execute-phase 3
last_updated: "2026-05-20T16:05:48.025Z" last_updated: "2026-05-20T17:05:06.655Z"
last_activity: 2026-05-20 last_activity: 2026-05-20
progress: progress:
total_phases: 4 total_phases: 4
completed_phases: 2 completed_phases: 2
total_plans: 18 total_plans: 23
completed_plans: 18 completed_plans: 18
percent: 50 percent: 78
--- ---
# Project State # Project State
@@ -215,9 +215,9 @@ Items acknowledged and carried forward from previous milestone close:
## Session Continuity ## Session Continuity
Last session: 2026-05-20T16:05:47.999Z Last session: 2026-05-20T17:05:06.634Z
Stopped at: Phase 3 UI-SPEC approved (null-spec; verification-only; 6/6 dimensions PASS) Stopped at: Phase 3 plans created — 5 plans validated GREEN iter-1 by plan-checker; ready for /gsd-execute-phase 3
Resume file: .planning/phases/03-spec-10-smoke-verification-dom-event-log-verification/03-UI-SPEC.md Resume file: .planning/phases/03-spec-10-smoke-verification-dom-event-log-verification/03-01-PLAN.md
Prior session: 2026-05-20T12:54:42.000Z — /gsd-pause-work saved Phase 2 execution-ready handoff (a440c7d); Phase 1 closed end-to-end via verifier audit GREEN (586836f); alpha distribution shipped (dist-archives/mokosh-build-2026-05-20-6dbed91.zip) Prior session: 2026-05-20T12:54:42.000Z — /gsd-pause-work saved Phase 2 execution-ready handoff (a440c7d); Phase 1 closed end-to-end via verifier audit GREEN (586836f); alpha distribution shipped (dist-archives/mokosh-build-2026-05-20-6dbed91.zip)
Earlier session: 2026-05-20T12:00:00.000Z — Plan 01-10 closed via cycle-2 operator ack "All good" + 5 inter-cycle debug fixes + brand-rename follow-up Earlier session: 2026-05-20T12:00:00.000Z — Plan 01-10 closed via cycle-2 operator ack "All good" + 5 inter-cycle debug fixes + brand-rename follow-up

View File

@@ -1,45 +0,0 @@
---
context: phase-3-plan-preferences
captured: 2026-05-20
expires_when: /gsd-plan-phase 3 completes
---
# Phase 3 plan-phase preferences (captured pre-UI-SPEC exit)
User invoked `/gsd-plan-phase 3` 2026-05-20 and answered both initial gate
questions before workflow exited at UI-SPEC gate. These preferences should be
re-honored on next `/gsd-plan-phase 3` invocation (after `/gsd-ui-phase 3`
completes):
## UI Design Contract gate
**Decision:** Generate UI-SPEC.md first → run `/gsd-ui-phase 3` before
re-running plan-phase.
**Caveat to revisit:** Phase 3 is verification-only — the "page" keyword that
tripped the gate refers to Puppeteer test fixture pages (synthetic HTML for
rrweb DOM probing), not user-facing UI. /gsd-ui-phase may produce a thin
UI-SPEC.md or recommend skipping. Either is acceptable. If it surfaces an
"is this a UI phase?" question, answer "no — internal test fixtures only".
## Research gate
**Decision:** Research first (light) → spawn gsd-phase-researcher before
planning.
**Scope for researcher:** light investigation of
- `puppeteer.Page.metrics()` API for optional RAM scaffolding (D-P3-04)
- Any new rrweb 2.0.0-alpha.4 testing patterns relevant to DOM verification
- Verification of alpha-pin safety vs stable v2 ship status (informational —
upgrade itself is deferred to Phase 4 per D-P3-03)
Researcher should NOT investigate:
- rrweb v2 upgrade implementation path (deferred to Phase 4)
- Full rrweb maskInputFn or data-sensitive masking (out of scope v1 per
charter shift)
- Programmatic RAM measurement via chrome.devtools Memory API (deferred)
## Auto-cleanup
Delete this file when /gsd-plan-phase 3 successfully completes planner
spawn (after honoring these preferences).

View File

@@ -517,7 +517,7 @@ human_verification:
**If the table is mostly LOW risk:** confirmed. The only MEDIUM is A6; planner-side flag. **If the table is mostly LOW risk:** confirmed. The only MEDIUM is A6; planner-side flag.
## Open Questions ## Open Questions (RESOLVED)
1. **Wave structure: parallel or sequential for Plans 03-01..04?** 1. **Wave structure: parallel or sequential for Plans 03-01..04?**
- What we know: Plan 02-04 ran A24-A28 sequentially within a single plan (one author). Phase 3's 5-plan structure is finer-grained per D-P3-01. - What we know: Plan 02-04 ran A24-A28 sequentially within a single plan (one author). Phase 3's 5-plan structure is finer-grained per D-P3-01.