Commit Graph

15 Commits

Author SHA1 Message Date
5d0b40c9b6 docs(04-07): closure markers — REQUIREMENTS + ROADMAP + STATE + PROJECT for Phase 4 v1 close-prep
Task 2 of Plan 04-07 — 4 marker file flips landing Phase 4 closure-prep
(NOT formal Phase 4 closure; that happens at the ceremony AFTER the
independent gsd-verifier audit per Phase 1-3 precedent).

ROADMAP.md:
- Plan 04-07 row flipped [ ] → [x] with full closure annotation (04-VERIFICATION.md
  citation + Phase 4 cumulative totals + D-P4-05 backfill verification + closure-
  ceremony deferral note)
- Phase 4 progress table cell updated 7/8 → 8/8 with full closure-prep narrative
- Phase 4 row [ ] LEFT UNFLIPPED — verifier audit + closure ceremony flips it

STATE.md:
- progress.completed_plans: 29 → 30 + progress.percent: 93 → 97
- progress.completed_phases: 3 (UNCHANGED) + status: executing (UNCHANGED)
- stopped_at + last_updated + last_activity updated for Plan 04-07 closure
- Current Position block updated to reflect Plan 04-07 completion + pending
  closure ceremony
- Plan 04-07 closure section added at top of body
- Performance metrics row added for Phase 04 P07
- Session Continuity entry prepended for Plan 04-07
- 2 Phase 04-07 decisions appended to Decisions list

REQUIREMENTS.md:
- 4 Phase 4 closure notes appended to existing REQ blocks (no existing REQ-*
  lines modified):
  - REQ-video-ring-buffer: ROADMAP SC #1 via Plan 04-08 (methodology reframe)
  - REQ-rrweb-dom-buffer: A29 cs-injection-world + UAT 33→36 GREEN summary
  - REQ-user-event-log: ROADMAP SC #2 via Plan 04-05 + audit P1 #11/#14/#15
    via Plan 04-01
  - REQ-install-clean: ROADMAP SC #3/SC #4/Plan 04-02 build hygiene + Plan
    04-08 Tier-2 leak gate
- Trailing footer line updated with 2026-05-26 Phase 4 closure citation

PROJECT.md:
- NEW Validated in Phase 4 section added (7 bullets covering all closures)
- Active section evolved from Phase 4 backlog → Phase 4 closure-ceremony
  workstream + Deferred-to-v1.1/v2 maintenance milestone items
- Trailing footer line updated with 2026-05-26 Phase 4 closure citation

Acceptance criteria gates (all PASS per Plan 04-07 Task 2):
- ROADMAP.md 04-07 row [x] = 1
- ROADMAP.md Phase 4 row [x] = 0 (correctly LEFT unflipped)
- STATE.md completed_phases: 3 = 2 (frontmatter + body — UNCHANGED per spec)
- STATE.md completed_plans: 30 = 1 (incremented by 1)
- STATE.md status: executing = 1 (UNCHANGED per spec)
- REQUIREMENTS.md "Phase 4 closure note" mentions = 4 (>= 3)
- PROJECT.md "Validated in Phase 4" section = 1
- git diff --stat HEAD~1 HEAD shows only .planning/ files dirty (T-04-07-02
  threat mitigation gate honored — docs-only commit; no source/test changes)

Phase 4 row + completed_phases bump + status:completed flip explicitly
DEFERRED to closure ceremony after the independent gsd-verifier audit
per Phase 1-3 precedent (executor creates VERIFICATION.md; verifier
independently re-validates with goal-backward audit; orchestrator flips
markers post-verifier-audit).
2026-05-26 14:08:17 +02:00
71081aa8c2 docs(03-05): Task 3 — REQUIREMENTS.md REQ marker flips (Phase 3 closure)
- REQ-rrweb-dom-buffer: [ ] → [x] with Plan 03-01 A29 GREEN closure block (4 EventType-enum
  checks; T5 override per saved memory feedback-trust-harness-over-manual-uat.md)
- REQ-user-event-log: [ ] → [x] with Plan 03-02 A30 GREEN closure block (5 UserEvent.type
  presence checks via cs-injection-world pattern; T5 override)
- Traceability table: both REQs flipped Pending → Complete 2026-05-20 with citation
- Closure footer appended with Phase 3 sweep summary (3 T5 overrides for §10 #4/#5/#8 PARTIAL;
  1 human_verification for §10 #9 RAM per D-P3-04; UAT 29 → 33 GREEN)
- REQ-password-confidentiality unchanged (Out of Scope v1 per D-P3-02 charter; PARTIAL
  via A31 covers existing minimum at src/content/index.ts:82)

Per parallel-executor protocol: STATE.md + ROADMAP.md NOT modified (auto-strip on merge;
orchestrator owns those writes post Wave 5 merge). REQUIREMENTS.md propagates via merge.
2026-05-20 21:19:38 +02:00
a8b4fe567b docs(phase-02): complete phase execution — markers flipped to closed
Phase 2 closure tracking:
- STATE.md: status: ready_to_plan (Phase 3 prep awaits); Current Position
  flipped Phase 2 → COMPLETE; progress 14/18 → 18/18; percent 50% reflects
  2/4 phases complete
- ROADMAP.md: Phase 2 plan-count + status updated by gsd-sdk phase.complete
- REQUIREMENTS.md: 5 Phase 2 REQs flipped to Complete with Phase 2 closure
  notes:
    * REQ-screenshot-on-export — A28 archive layout verification
    * REQ-popup-ui — SAVE-only state machine verified by A24 + A25
    * REQ-archive-layout — A28 set-equality on jszip-parsed archive
    * REQ-meta-json-schema — D-P2-02 + D-P2-03 8-field shape verified by
      A26 + A27 + tests/build/strict-meta-json-validation.test.ts (8 tests)
      + tests/background/meta-json-urls-schema.test.ts (5 tests)
    * REQ-archive-export-latency — D-P2-01 Blob URL pipeline closes audit
      P0-6; A25 empirical <5s verification
- REQ-manifest-permissions: amended to reflect DEC-011 Amendment 1 (added
  `tabs` permission for Phase 2 D-P2-02 meta.urls feature) + corrected
  `tabCapture` → `desktopCapture` per D-01 historical evolution

Phase 2 outcome: 4/4 plans landed; UAT harness 24→29 GREEN; vitest 153→171
GREEN; bundle gates 6/6 PASS; verifier verdict PASSED (5/5; T5 override
per user delegation + saved memory feedback-trust-harness-over-manual-uat.md).

Audit closures: P0-6 (base64 data-URL cap → Blob URL pipeline) + P1 #10
(meta.url:string → urls:string[] schema).

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-20 17:43:51 +02:00
af035564d3 docs(02-03): REQUIREMENTS — REQ-meta-json-schema amended for 8-field shape with urls[] + schemaVersion
- Rewrite REQ-meta-json-schema block (lines ~106-119) to reflect the
  Plan 02-03 D-P2-02 + D-P2-03 cutover:
  * 8 fields exact (was 7); `url: string` REMOVED; `urls: string[]`
    + `schemaVersion: '2'` ADDED.
  * Acceptance criteria: schemaVersion === '2'; ISO-8601 timestamp;
    urls entries match URL_SCHEME_ALLOW regex (https + http +
    chrome-extension://); urls deduplicated + first-seen-ordered; semver
    extensionVersion; non-negative integer totalEvents; exactly 8 keys.
  * F2 explicitly carried in the urls acceptance bullet: empty array IS
    permitted (whole-desktop-no-tab session is a meaningful operator
    state); non-empty arrays validate each entry against the filter regex.
  * Binding note preserves the original CON-meta-json-schema 7-field
    shape as SPEC provenance while documenting that this REQ supersedes
    it for the Phase 2 cutover.

- Traceability table entry updated:
  Phase 3 (originally) → **Phase 2** → Phase 2 (implementation landed
  via Plan 02-03; harness validation deferred to Plan 02-04).

- Footer dated 2026-05-20 with the REQ-meta-json-schema amendment
  citation; prior Plan 01-10 closure entry demoted to "Earlier update".

Verification gates per plan:
- grep -c "schemaVersion" .planning/REQUIREMENTS.md → 3 (≥2 required ✓)
- grep -c "urls.*string\[\]" .planning/REQUIREMENTS.md → 2 (≥1 required ✓)
2026-05-20 16:09:07 +02:00
6dbed91efd docs(roadmap): re-phase milestone — remove Phase 2 (DOM/event-capture privacy)
Per operator charter shift 2026-05-20: "we don't care about privacy hardening.
At least here." Archive flow is internal-only (no external transmission),
which reframes the password-masking P0-5 defect from privacy-regulation
gravity to operator-hygiene polish.

Re-phasing applied across 4 planning artifacts:

ROADMAP.md:
- Original Phase 2 ("Stabilize DOM + event-capture privacy") REMOVED entirely
  (summary list + Phase Details section + Progress table row).
- DOM + event-log VERIFICATION (REQ-rrweb-dom-buffer + REQ-user-event-log)
  ABSORBED by new Phase 3 (SPEC §10 smoke verification).
- Phase numbering: old 3 → new 2 (export), old 4 → new 3 (smoke), old 5 → new 4
  (optional harden). Dependency chains updated accordingly.
- Overview blurb + journey narrative + success criteria refreshed.
- Phase 3 (smoke) explicitly NOT-in-scope: P0-5 password masking dropped.

REQUIREMENTS.md traceability:
- REQ-rrweb-dom-buffer: Phase 2 → Phase 3 (verification scope; UAT harness
  A24+ extension planned).
- REQ-user-event-log: Phase 2 → Phase 3 (same context).
- REQ-password-confidentiality: Phase 2 → Out of Scope (v1) — DEFERRED per
  charter shift.
- REQ-popup-ui, REQ-screenshot-on-export, REQ-archive-layout,
  REQ-meta-json-schema, REQ-archive-export-latency: Phase 3 → Phase 2
  (renumbered; substantively shipped via Plans 01-08 + 01-09 + 01-12;
  residual gaps in Phase 2).
- Coverage: 10 mapped + 1 out-of-scope (was 11 mapped).

PROJECT.md:
- CON-sensitive-data-masking: DEFERRED 2026-05-20 (preserves audit trail
  via strikethrough; rationale documented).
- DEC-004 amendment: rrweb 5000-event cap retained; masking deferred. Cites
  rrweb 2.0.0-alpha.4 maskInputSelector→maskInputFn API change.

STATE.md:
- frontmatter total_phases: 5 → 4.
- stopped_at narrative captures the re-phasing event.

CLI bug note: this re-phasing was attempted via `gsd-sdk query phase.remove 2`
+ canonical `/gsd-remove-phase 2` Skill invocation, but BOTH paths produced
corrupted output (cascading rename via reverse-iteration loop at
phase.cjs:670-679 collapsed all subsequent phases to "Phase 2", plus a
mysterious "2026"→"2002" date corruption). Recovery applied as manual edits
in this commit. CLI bug logged as upstream GSD-framework concern; not a
Mokosh-side issue.

Plan: next is `/gsd-discuss-phase 2` (new Phase 2 = export pipeline; narrowed
scope per re-phasing — ~2-3 plans expected since Plans 01-08 + 01-09 + 01-10
+ 01-12 already shipped most surface).

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-20 13:25:11 +02:00
586836f8a0 docs(01): VERIFICATION + Phase 1 closure markers — goal-backward audit GREEN
gsd-verifier goal-backward audit (2026-05-20) returned GREEN verdict on
Phase 1 (Stabilize Video Pipeline + whole-desktop capture + as-automatic-
as-platform-allows recording start):

- 17/17 must-haves verified: 11 REQs/charters + 6 cross-cutting gates
- 14/14 plans complete (01-01..01-09 + 01-11 spike-pivot + 01-12 + 01-13
  + 01-14 + 01-10)
- 5 operator empirical acks: Plan 01-07 (Chrome playback 2026-05-15) +
  Plan 01-13 (harness 2026-05-19) + Plan 01-12 (brand-fit 2026-05-20) +
  Plan 01-10 cycle-2 ("All good" 2026-05-20) + Plan 01-10 brand-rename
  follow-up (2026-05-20)
- Test gates: vitest 153/153 GREEN; UAT harness 24/24 GREEN; Tier-1 grep
  gate 12 FORBIDDEN_HOOK_STRINGS; pre-checkpoint bundle gates PASS
- 7 P0 audit defects: 6 closed in-Phase-1-scope; P0 #6 (data-sensitive
  masking) properly deferred to Phase 2

Marker flips landed:

- STATE.md status reflects Phase 1 COMPLETE; completed_phases 0 → 1
- ROADMAP.md Phase 1 row [ ] → [x] with closure-arc summary
- REQUIREMENTS.md REQ-video-ring-buffer In-progress → Complete 2026-05-20
- VERIFICATION.md committed (orchestrator-bundle pattern per verifier
  protocol)

Forward-looking deferred (NOT gaps):
- Phase 2: REQ-rrweb-dom-buffer + REQ-user-event-log +
  REQ-password-confidentiality (audit P0 #6)
- Phase 5 hardening: getDisplayMedia cursor visibility; setimmediate
  polyfill new Function pre-existing; tabs permission gap; dark-surface
  logo contrast; 2 ffprobe/ffmpeg test flakes

Phase 2 (Stabilize DOM + event-capture privacy) kickoff pending.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-20 12:31:36 +02:00
d1ef77a7d1 docs(01-10): state + roadmap + requirements — Plan 01-10 closure
State markers sync after Plan 01-10 closure:

STATE.md:
- progress.completed_plans: 13 → 14
- progress.percent: 93 → 100 (all 14 Phase 1 functional plans complete)
- status: executing (Phase 1 final-closure marker flip pending)
- stopped_at + Last session timestamps refreshed
- Current Position bumped to 14/14 plans complete
- Outstanding Phase 1 gates: Plan 01-10 row marked CLOSED;
  Phase 1 final-closure marker flip listed as remaining work
- Plan 01-10 closure section added mirroring existing 01-12/01-13/01-14
  patterns: 4 wave commits + 5 inter-cycle debug commits + cycle-2 ack
- Performance Metrics: Phase 01 P10 row added (5h, 5 tasks, 14 files)
- Decisions: 3 Plan 01-10 architectural decisions added
  (first-install activation; D-16-toolbar charter preservation;
  three-pipeline DOM population pattern; startVideoCapture D-01
  cleanup gap closure)

ROADMAP.md:
- Plan 01-10 row flipped to [x] with full closure annotations
  (commit chain + harness counts + operator ack date)
- Plan 01-09 row annotated with closure-cycle follow-up debug
  commits (a2dfc8c startVideoCapture no-tab + 4bba679 notifStartup
  text split — both landed during Plan 01-10 closure cycle)
- Phase 1 plans-count narrative updated: "all 14 functional plans
  complete; Phase 1 final-closure marker flip pending"
- Progress table: Phase 1 plans complete 13/14 → 14/14;
  status row updated to "Final-closure marker flip pending"

REQUIREMENTS.md:
- Footer timestamp + closure note updated: Plan 01-10 introduced
  no new functional REQs (it consumed REQ-video-ring-buffer
  already-Complete via Plan 01-07) by adding the first-install
  operator-facing activation surface that complements the always-on
  capture pipeline.
- Phase 1 final functional plan delivered; final-closure marker
  flip pending (REQUIREMENTS / ROADMAP / STATE markers + optional
  /gsd-verify-work 1).

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-20 12:10:56 +02:00
66e6f503a4 docs(01-12): state + roadmap + requirements — Plan 01-12 closure
Plan 01-12 closure documentation sync per the plan's Wave 7 Task 1
spec. Three docs land together as one atomic closure commit per the
Plan 01-13 + 01-14 closure cadence convention.

STATE.md changes:
- status: verifying → executing (Plan 01-10 welcome tab still pending)
- stopped_at: Plan 01-14 → Plan 01-12 closed via Wave 7 brand-fit
  ack 2026-05-20 'all good'; Plan 01-10 remains as final Phase 1
  functional plan
- last_updated + last_activity: 2026-05-19 → 2026-05-20
- progress.completed_plans: 12 → 13 (13 plans: 01-01..01-09 + 01-11
  spike + 01-12 + 01-13 + 01-14; Plan 01-10 pending)
- progress.percent: 86 → 93
- "Plan 01-13 closure" header annotated: brand/design ack subsequently
  closed via Plan 01-12 Wave 7 2026-05-20
- New "Plan 01-12 closure (2026-05-20)" section: 7-wave execution arc
  with all 10 commit hashes (3fe018b plan-baseline-revision → 34a9ce1
  Wave 0 → f86fd60 + abab6e1 Wave 1 → 7732a30 Wave 2 → 110cebc Wave 3
  → 468f16d Wave 4 → e8d2881 Wave 5 → b909c37 Wave 6 + 865d394
  pre-checkpoint + f319c7d SUMMARY); R2 Lora substitution; 16 i18n
  keys; branded icons; BADGE_REC_COLOR #b2543d; chrome.i18n fallback;
  A18-A22 harness; pre-checkpoint bundle gates per
  feedback-pre-checkpoint-bundle-gates.md; setimmediate polyfill
  discovery logged to deferred-items.md (Phase 5 hardening); operator
  brand-fit ack; Plan 01-13 Task 9 functional closure
- "Outstanding Phase 1 gates" updated: Plan 01-13 Task 9 + Plan 01-12
  CLOSED; only Plan 01-10 remains
- Performance Metrics table: Plan 01-12 entry appended (~10h
  cumulative; 10 tasks; ~50+ files)
- Decisions section: 2 new entries for Plan 01-12 design integration
  + Plan 01-13 Task 9 closure linkage
- Session Continuity: last/prior session updated to 2026-05-20 /
  2026-05-19

ROADMAP.md changes:
- Phase 1 Plans list: 01-12-PLAN.md entry flipped from [ ] to [x]
  with full closure annotation (R2 Lora self-host, tokens.css
  canonical, 16 i18n keys across en+ru, branded Loom icons, manifest
  i18n, BADGE_REC_COLOR madder #b2543d, chrome.i18n fallback,
  harness A18-A22, operator brand-fit ack 2026-05-20 'all good')
- Phase 1 plan count: 13 → 14 plans (01-01 through 01-14)
- Progress table Phase 1 row: 7/7 Complete → 13/14 Executing with
  closure-status disambiguation (functional via Plan 01-13;
  design/brand via Plan 01-12; Plan 01-10 welcome tab remains)

REQUIREMENTS.md changes:
- REQ-install-clean: [ ] Pending → [x] Complete (2026-05-20)
  with annotation: fresh build clean; zero remote-font CSP errors;
  branded icons; en+ru manifest:name resolution; operator brand-fit
  ack
- REQ-manifest-permissions: [ ] Pending → [x] Complete (2026-05-20)
  with annotation: manifest:name + :description +
  :action.default_title migrated to __MSG_*__ + default_locale='en';
  manifest validation PASS; en↔ru parity; permissions DEC-011
  baseline UNCHANGED
- Traceability table: both requirements moved from Phase 3/4 Pending
  to "Phase 1 closure via Plan 01-12" Complete
- Footer: last-updated 2026-05-15 → 2026-05-20 with annotation
  noting the requirements flipped at Plan 01-12 closure

No code changes; pure documentation closure sync.

Closure commit hashes:
- SUMMARY: f319c7d (.planning/phases/01-stabilize-video-pipeline/01-12-SUMMARY.md)
- State sync: this commit (.planning/STATE.md + .planning/ROADMAP.md
  + .planning/REQUIREMENTS.md)

Phase 1 status post-closure:
- Functional contract: CLOSED via Plan 01-13 harness PASS (2026-05-19)
- Design/brand contract: CLOSED via Plan 01-12 brand-fit ack
  (2026-05-20)
- Remaining: Plan 01-10 (welcome tab) — operator-facing onboarding
  surface; canonical src/shared/tokens.css from Plan 01-12 now
  available for swap-in

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-20 08:33:52 +02:00
9792c0f6c3 docs(01-14): state + roadmap + requirements — Plan 01-14 closure
- STATE.md: advance plan counter, update progress (12/14 = 86%), record
  metric (Plan 01-14: 49m, 1 task, 7 files), add decision, record session.
- ROADMAP.md: update phase-01 progress table (plan_count=14, summary_count=12).
- REQUIREMENTS.md: mark REQ-video-ring-buffer complete (final closure for
  the Phase-01 video-pipeline charter).

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-19 21:41:26 +02:00
bc310d98cf revert(01): reopen Phase 1 — D-13 multi-EBML-concat is unplayable
REQ-video-ring-buffer flipped from [x] back to [ ]. ROADMAP.md Phase 1
row reverted from [x] Closed 2026-05-15 to [ ] reopened 2026-05-16.
STATE.md status flipped phase_complete → phase_reopened with full
historical narrative preserved.

Root cause (confirmed at byte level by gsd-debugger 2026-05-16):
D-13's concat-of-self-contained-WebM-segments architecture produces a
3-EBML-header WebM that standards-compliant Matroska parsers
(mpv, ffmpeg, Chrome HTMLMediaElement) play only as the first segment
(~9.94 s) and silently drop the remaining 2 segments. Confirmed via
operator mpv drag-drop test of BOTH the canonical 2026-05-15 closure
fixture and the 2026-05-16 UAT-produced fixture — both exhibit the
same broken playback.

The 2026-05-15 "operator-confirmed clean Chrome playback" assessment
was insufficient: it verified the file plays without freezing but did
not measure total duration. Phase 1's primary deliverable
(REQ-video-ring-buffer / SPEC §10 #7) is therefore NOT satisfied.

Fix path chosen by user: ts-ebml (parse) + webm-muxer (write) to
replace mergeVideoSegments file-concat with real single-EBML remux.
Will land as Plan 01-08 via fresh /gsd-plan-phase ceremony.

RED test landed in tests/offscreen/webm-playback.test.ts (2 new
assertions on container-format-duration + ffmpeg-full-decode-duration).
2 failures, 53 baseline tests still GREEN.

Option C port-lifecycle refactor (debug session
empty-archive-port-race, commits 674c415..f0871c0) DID land cleanly
and is retained — that fix was orthogonal and correctly resolved the
silent-empty-archive symptom that previously masked this deeper bug.

Debug session: .planning/debug/d13-multi-ebml-concat-unplayable.md

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-16 19:47:47 +02:00
7df72aaa60 feat(01-07): close Phase 1 — REQ-video-ring-buffer complete, SPEC §10 #7 satisfied
Phase 1 closure 2026-05-15 — both acceptance gates green:

- D-12 ffprobe structural gate: `ffprobe -v error -f matroska -i
  tests/fixtures/last_30sec.webm` exit 0 (cd61cbc)
- A3 empirical-playback gate: operator confirmed clean end-to-end Chrome
  playback (no ~1 s freeze); ffmpeg `-v warning -i fixture -f null -`
  exit 0 with zero decoder errors (only expected muxer DTS-monotonicity
  warnings at segment join boundaries — documented D-13 trade-off for
  multi-EBML-header WebM concat; Chrome's MSE pipeline handles this
  natively, satisfying SPEC §10 #7)

Changes:

- .planning/REQUIREMENTS.md
  * REQ-video-ring-buffer checkbox [ ] -> [x]; description AMENDED to
    document the D-13 restart-segments lifecycle replacing D-09..D-11;
    SPEC §10 #2, #3, #7 noted as green 2026-05-15
  * Traceability table row: REQ-video-ring-buffer | Phase 1 | Complete
    (was Pending)

- .planning/ROADMAP.md
  * Phase 1 list-item flipped [ ] -> [x] with closure date + summary
  * Phase 1 Success Criteria 1, 2, 3 individually checked off; criterion 2
    re-worded to reflect D-13 segment-cycling (replacing the original
    single-continuous-recorder wording from D-09..D-11)
  * Plan list: 01-07-PLAN.md flipped [ ] -> [x] with closure note
  * Progress table row: 7/7 Complete 2026-05-15 (was 6/7 In Progress)
  * Phase 5 P1/P2 list: appended `getDisplayMedia` cursor visibility
    constraint (`video: { cursor: 'always' }`) — surfaced as user
    observation during Phase 1 smoke 2026-05-15

- .planning/STATE.md
  * Frontmatter: status -> phase_complete, completed_phases 0 -> 1,
    completed_plans 6 -> 7, percent 86 -> 100; stopped_at + last_activity
    rewritten for closure narrative
  * Current Position: Phase 1 COMPLETE, next Phase 2 of 5, Plan 7/7
    complete, progress bar [██████████] 100% Phase 1
  * Performance Metrics: Phase 1 row populated (7 plans, ~50 min); added
    Plan 07 row with closure narrative incl. the two debug sessions
  * Decisions log: appended [Phase 01-07-closure] decision and
    [Phase 01-07-deferred-to-5] note for the cursor-visibility refinement
  * Session Continuity: rewritten for closure; resume file points to the
    Plan 07 SUMMARY (commit 3)
  * Added "Phase 1 Closure Notes" block with ffprobe + ffmpeg gates,
    fixture metadata, test counts, criteria green-status, and a process
    retro candidate (auto-injection of empirical-acceptance gates when
    RESEARCH.md flags HIGH-risk assumptions)

Refs: .planning/debug/resolved/d12-blob-port-transfer-fails.md,
.planning/debug/resolved/webm-playback-freeze.md
2026-05-15 21:58:38 +02:00
edc605d475 docs(01-02): complete wave-0 test infrastructure plan
- 01-02-SUMMARY.md created (Vitest 4.1.6 installed; 4 RED test files
  pinning Plans 03+04 contracts; tests/fixtures/.gitkeep marker)
- STATE.md advanced: plan 2/7 -> 3/7; progress 14% -> 29%; metric row
  added; 3 decisions logged; session continuity updated
- ROADMAP.md progress row updated: Phase 1 = 2/7 In Progress
- REQUIREMENTS.md: REVERTED premature [x] + "Complete" marking of
  REQ-video-ring-buffer (Plan 01-01 mistakenly marked it; the requirement
  is satisfied by Plans 03+04+07's implementation + ffprobe gate, not by
  RED test scaffolding). Now reads "[ ]" + "In Progress" — honest state.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-15 17:28:49 +02:00
13b67f5136 docs(01-01): complete doc-cascade plan
Plan 01-01 (Wave-0 doc cascade) complete. Six tasks landed atomically
in commits 125c032, fb88830, b1ed2cb, 597d967, 32bc996, 4a5194e. Every
code-touching plan in Phase 1 (01-02..01-07) now reads a consistent
baseline: getDisplayMedia replaces tabCapture in DEC-003; long-lived
port replaces alarms in DEC-010; manifest.json carries the final
Phase-1 permissions set (desktopCapture, activeTab, downloads,
scripting, storage, offscreen).

SUMMARY: .planning/phases/01-stabilize-video-pipeline/01-01-SUMMARY.md
2026-05-15 17:19:48 +02:00
597d967ccf docs(01-01): amend REQ-video-ring-buffer per D-A4
Replace the REQ-video-ring-buffer bullet to bind the new
getDisplayMedia + offscreen-document acquisition path and drop the
'active-tab' wording (the new API is screen/window-scoped, not
tab-scoped, so there is nothing to re-attach on tab switch). Encoding,
buffer window, and SPEC §10 acceptance citations are unchanged. Adds
CON-display-capture-binding alongside the existing constraint bindings.
2026-05-15 17:15:24 +02:00
89ca09ccec docs: bootstrap .planning/ via /gsd-ingest-docs (2 docs) /home/parf/projects/work/repremium/.planning/PROJECT.md /home/parf/projects/work/repremium/.planning/REQUIREMENTS.md /home/parf/projects/work/repremium/.planning/ROADMAP.md /home/parf/projects/work/repremium/.planning/STATE.md /home/parf/projects/work/repremium/.planning/intel /home/parf/projects/work/repremium/.planning/INGEST-CONFLICTS.md /home/parf/projects/work/repremium/.ingest-manifest.yaml 2026-05-15 15:16:30 +02:00