Mark a440c7d76b wip: phase-02 paused — 4 plans validated, ready for execution
Phase 2 (Stabilize export pipeline) planning ceremony complete:

- /gsd-discuss-phase 2 → 02-CONTEXT.md (cc042a5) with 3 locked decisions
  (D-P2-01 offscreen Blob URL; D-P2-02 meta.urls schema; D-P2-03 full scope)
- /gsd-plan-phase 2 → 4 plans (0608b22) → revision iteration 1 per checker
  (9dcfcf0; B1 tabs permission + 4 informational flags resolved) →
  plan-checker iteration 2 GREEN → constraint sync (df8c086)
- DEC-011 Amendment 1 landed: `tabs` permission added to manifest for D-P2-02
  meta.urls feature

HANDOFF.json + .continue-here.md capture:
- 10 completed-this-session items (resume + researcher + Plan 01-14 + Plan
  01-12 + Plan 01-10 cycle-2 + Phase 1 verifier + alpha distribution +
  re-phasing + Phase 2 discuss + Phase 2 plan)
- 3 remaining tasks (Phase 2 execute, Phase 3 prep, Phase 4 optional)
- 5 decisions this session
- 2 advisory anti-patterns (/gsd-remove-phase CLI cascading bug;
  charter-shift-via-discuss-phase pattern)
- Phase 4 backlog (8 items accumulated)
- Test baselines (vitest 153, UAT 24, FORBIDDEN_HOOK_STRINGS 12)

Branch identity preserved at gsd/phase-01-stabilize-video-pipeline per
/gsd-plan-phase workflow invariant — ROADMAP phase rename does NOT mutate
branch name.

Alpha distribution shipped to testers in parallel:
  dist-archives/mokosh-build-2026-05-20-6dbed91.zip
  SHA256: 2a9ffe6797534d6a4cf5e040dccde8772245407483693efa17fdd1caca8b1f66

Next session: /gsd-resume-work → /gsd-execute-phase 2.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-20 14:56:53 +02:00

8.2 KiB

context, phase, plan_count, status, last_updated
context phase plan_count status last_updated
phase 02-stabilize-export-pipeline 4 paused 2026-05-20T12:54:42.079Z

BLOCKING CONSTRAINTS — None

No blocking constraints introduced this session. Two advisory anti-patterns logged below (do not gate resumption).

Critical Anti-Patterns

Pattern Description Severity Prevention Mechanism
/gsd-remove-phase CLI cascading rename gsd-sdk query phase.remove (and its /gsd-remove-phase Skill wrapper) has a bug at ~/.claude/get-shit-done/bin/lib/phase.cjs:670-679: reverse-iteration loop cascades renames — Phase 5→4, then 4→3 catches just-renamed-from-5, then 3→2 catches all → collapses subsequent phases to "Phase 2". Plus line 676 regex corrupts "2026-XX" → "2002-XX". Verified in this session's first /gsd-remove-phase 2 attempt; recovered via manual edits + revert. advisory Upstream GSD-framework bug, NOT Mokosh-side. NEXT-SESSION: if removing a future phase, prefer manual ROADMAP/STATE/REQUIREMENTS edits over /gsd-remove-phase until upstream fixed. /gsd-discuss-phase + /gsd-plan-phase Skills work correctly.
Charter shift mid-project User's "log is internal" realization mid-session triggered roadmap re-scope (Phase 2 DOM/privacy removed entirely). advisory Charter shifts are LEGITIMATE; user is the visionary. /gsd-discuss-phase is the canonical surface; PROJECT.md DEC-* table is where amendments land with provenance.

Current State

Phase 2 (Stabilize export pipeline) PLANNING COMPLETE. Ready for execution.

  • Branch: gsd/phase-01-stabilize-video-pipeline at HEAD df8c086
  • 4 plans validated + plan-checker iteration 2 GREEN
  • Test baselines: vitest 153/153 GREEN · UAT 24/24 GREEN · build clean · Tier-1 FORBIDDEN_HOOK_STRINGS = 12 · production bundle hook-free
  • Working tree: clean
  • Alpha distribution shipped: dist-archives/mokosh-build-2026-05-20-6dbed91.zip (testers running in parallel)

Plans Ready for Execution

Plan Wave Type Scope Closes
02-01 1 tdd RED tests scaffold — blob-url-download.test.ts + meta-json-urls-schema.test.ts + strict-meta-json-validation.test.ts; 15 it() blocks total Test contracts for D-P2-01/02/03
02-02 2 auto Blob URL pipeline — offscreen URL.createObjectURL + SW chrome.downloads.download(url) + onChanged revoke lifecycle; new PortMessageType (CREATE_DOWNLOAD_URL / DOWNLOAD_URL / REVOKE_DOWNLOAD_URL); depends_on [02-01] P0-6
02-03 2 auto meta.urls + tab-url-tracker module + manifest "tabs" permission + PROJECT.md DEC-011 Amendment 1 + manifest-i18n test update; depends_on [02-01] P1 #10
02-04 3 auto + human-verify UAT harness A24-A28 (Blob URL, <5s latency, 8-field meta, multi-tab urls, archive-layout set-equality) + operator empirical UAT cycle 1; depends_on [02-02, 02-03] Phase 2 closure

Recent commit chain (most recent first)

  • df8c086 docs(02): sync CON-manifest-permissions constraint with DEC-011 Amendment 1
  • 9dcfcf0 fix(02): revise plans per checker (B1 + 4 flags) — add tabs permission for D-P2-02
  • 0608b22 feat(02): plans 01-04 — Phase 2 export pipeline closure (Blob URL + meta.urls + schema + harness)
  • cc042a5 docs(02): capture phase context — discuss-phase complete
  • 6dbed91 docs(roadmap): re-phase milestone — remove Phase 2 (DOM/event-capture privacy)
  • 586836f docs(01): VERIFICATION + Phase 1 closure markers — goal-backward audit GREEN
  • (… Phase 1 closure commits earlier)

Required Reading (in order)

  1. .planning/HANDOFF.json — machine-readable handoff (sibling to this file)
  2. .planning/STATE.md — current progress (Phase 1 CLOSED; Phase 2 ready)
  3. .planning/ROADMAP.md — post-re-phasing structure (4 phases now; Phase 2 = export)
  4. .planning/REQUIREMENTS.md — REQ-meta-json-schema, REQ-archive-export-latency, etc.
  5. .planning/PROJECT.md — DEC-011 Amendment 1 + CON-manifest-permissions sync
  6. .planning/phases/02-stabilize-export-pipeline/02-CONTEXT.md — D-P2-01/02/03 locked decisions + Revision Log
  7. .planning/phases/02-stabilize-export-pipeline/02-01-PLAN.md — first plan to execute (Wave 1 RED tests)
  8. .planning/phases/02-stabilize-export-pipeline/02-02-PLAN.md — Wave 2 Blob URL pipeline
  9. .planning/phases/02-stabilize-export-pipeline/02-03-PLAN.md — Wave 2 meta.urls + tab-tracker + tabs permission
  10. .planning/phases/02-stabilize-export-pipeline/02-04-PLAN.md — Wave 3 harness + operator UAT
  11. Auto-memory at /home/parf/.claude/projects/-home-parf-projects-work-repremium/memory/MEMORY.md — feedback constraints from prior sessions

Decisions Locked This Session

  • DEC-011 Amendment 1 (committed 9dcfcf0): tabs added to manifest permissions for Phase 2 D-P2-02 meta.urls feature. Audit T-1-02 acknowledged but overridden — permission is genuinely USED.
  • D-P2-01 (in 02-CONTEXT.md): Offscreen-minted Blob URL pipeline replaces base64 data: URL download. Closes audit P0-6.
  • D-P2-02 (in 02-CONTEXT.md): meta.json schema migrates url:stringurls:string[]. Closes audit P1 #10. SessionMetadata interface + CON-meta-json-schema both amended.
  • D-P2-03 (in 02-CONTEXT.md): Full scope = bug fixes + strict schema validation + harness <5s latency assertion. ~3-4 plans (4 produced).
  • Re-phasing 2026-05-20 (committed 6dbed91): Original Phase 2 (DOM/event-capture privacy) REMOVED entirely. REQ-rrweb-dom-buffer + REQ-user-event-log absorbed by new Phase 3 (SPEC §10 smoke). REQ-password-confidentiality → Out of Scope (v1). Total phases 5 → 4.

Next-Session Order of Operations

  1. /gsd-resume-work to load this .continue-here.md + .planning/HANDOFF.json
  2. Acknowledge any blocking constraints (none this time; only advisory anti-patterns above)
  3. /gsd-execute-phase 2 to start Phase 2 execution (canonical Skill)
    • Alternative: /gsd-execute-phase 2 --wave 1 lands just the RED tests scaffold (~15-30min) for tomorrow's first iteration
  4. After Phase 2 closes: /gsd-verify-work 2 (canonical Phase 2 goal-backward audit)
  5. After Phase 2 marker flip: /gsd-discuss-phase 3 (new Phase 3 = SPEC §10 smoke + DOM/event-log verification absorbed from old Phase 2)
  6. Phase 3 → Phase 4 (optional) per ROADMAP

Infrastructure State

  • Branch: gsd/phase-01-stabilize-video-pipeline at HEAD df8c086 — branch name preserved per /gsd-plan-phase workflow invariant (branch identity is owned by user's git workflow; ROADMAP phase rename does NOT mutate branch name)
  • Build clean: npm run build 2.87s; dist/ reflects current code state (post-re-phasing, post-Plan-01-10, post-all-debug-fixes)
  • Alpha distribution: dist-archives/mokosh-build-2026-05-20-6dbed91.zip + INSTALL.md (testers running in parallel)
  • Two pre-existing vitest flakes (ffprobe/ffmpeg) deferred to Phase 4 hardening; do NOT block Phase 2

Phase 4 Backlog (informational; not gating Phase 2)

Accumulated through this session for future Phase 4 hardening:

  • 2 pre-existing vitest flakes (ffprobe/ffmpeg)
  • setimmediate polyfill new Function in SW chunk via vite-plugin-node-polyfills (pre-existing)
  • getDisplayMedia cursor visibility refinement (Plan 01-07 operator observation 2026-05-15)
  • Dark-surface logo contrast (Plan 01-10 operator observation 2026-05-20)
  • rrweb 2.0.0-alpha.4 → stable v2 upgrade research (in Phase 3 plans now? or defer to Phase 4)
  • ROADMAP backfill for Plans 01-08..01-13 entries (Plan 01-13 plan-checker flag #4)
  • REQ-password-confidentiality v2 candidate
  • Audit P1 #11 (fetch Request→[object Request]), #14 (navigation URL), #15 (rrweb timestamp semantics)

Context

Massive session: 2026-05-19 morning → 2026-05-20 afternoon overnight. Phase 1 closed end-to-end (14/14 plans + 5 operator acks + verifier GREEN); alpha distributed; charter shifted ("log is internal"); roadmap re-phased; Phase 2 fully planned + validated. User explicitly chose canonical GSD ceremony throughout: /gsd-discuss-phase + /gsd-plan-phase + plan-checker revision loop all worked correctly (only /gsd-remove-phase had the upstream CLI bug; recovered manually). Phase 2 is ready to execute as soon as next session opens.

Next action

Start with: /gsd-resume-work to load this handoff, then /gsd-execute-phase 2 to start Phase 2 execution.