After gsd-plan-phase 1: 7 plans across 7 waves. All gates pass: - Plan-checker (sonnet) VERIFICATION PASSED on iteration 1 - Decision coverage gate (gsd-sdk): 19/19 decisions covered - Requirements coverage: REQ-video-ring-buffer in all plans - Security threat model: T-1-01/02/04 mitigated; T-1-03 accepted residual Known non-blocking gaps: - gsd-sdk roadmap.annotate-dependencies failed (t.trim is not a function); ROADMAP plan-list annotations skipped. Phase 1 plan-list in ROADMAP.md remains accurate; this is a cosmetic nice-to-have for cross-cutting constraint visibility. - 1 plan-checker warning (stale wave prose in Plan 03/04 objectives) was fixed during decision-coverage revision. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2.9 KiB
gsd_state_version, milestone, milestone_name, status, stopped_at, last_updated, last_activity, progress
| gsd_state_version | milestone | milestone_name | status | stopped_at | last_updated | last_activity | progress | ||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.0 | v2.0.0 | milestone | executing | Phase 1 context gathered | 2026-05-15T15:08:45.135Z | 2026-05-15 -- Phase 1 planning complete |
|
Project State
Project Reference
See: .planning/PROJECT.md (updated 2026-05-15)
Core value: When an operator hits a bug, one click MUST produce a self-contained archive that lets support reproduce what happened — in under 5 s, no server, no password leaks. Current focus: Phase 1 — Stabilize video pipeline
Current Position
Phase: 1 of 5 (Stabilize video pipeline) Plan: 0 of TBD in current phase Status: Ready to execute Last activity: 2026-05-15 -- Phase 1 planning complete REQUIREMENTS.md, ROADMAP.md, STATE.md written)
Progress: [░░░░░░░░░░] 0%
Performance Metrics
Velocity:
- Total plans completed: 0
- Average duration: —
- Total execution time: —
By Phase:
| Phase | Plans | Total | Avg/Plan |
|---|---|---|---|
| 1. Stabilize video pipeline | 0 | — | — |
| 2. Stabilize DOM + event capture privacy | 0 | — | — |
| 3. Stabilize export pipeline | 0 | — | — |
| 4. SPEC §10 smoke verification | 0 | — | — |
| 5. Harden + clean up | 0 | — | — |
Recent Trend:
- Last 5 plans: —
- Trend: —
Updated after each plan completion
Accumulated Context
Decisions
Decisions are logged in PROJECT.md Key Decisions table (DEC-001 through DEC-012, all SPEC-Accepted and locked for Phase 1). Recent decisions affecting current work:
-
Phase 1 framing: roadmap treats the existing codebase as a partially-broken first attempt to be remediated against the SPEC, not as greenfield. The 7 P0 defects from the audit are split across phases 1–3 along commit boundaries; phase 4 is end-to-end SPEC §10 smoke verification.
-
All 12 SPEC decisions (
DEC-001..DEC-012) are LOCKED for Phase 1. Changing any of them requires a formal ADR; none are formally LOCKED in the ingest classification, so a future ADR can revise.
Pending Todos
None yet.
Blockers/Concerns
- (informational)
chrome.tabCapturerequires a user gesture on first activation — Phase 3 (P0-4) restores this by moving the call into the popup click handler; until Phase 3 lands, recording cannot start cleanly even if Phase 1's pipeline is correct. Phases 1–3 should not be re-ordered.
Deferred Items
Items acknowledged and carried forward from previous milestone close:
| Category | Item | Status | Deferred At |
|---|---|---|---|
| (none) |
Session Continuity
Last session: 2026-05-15T13:40:45.462Z Stopped at: Phase 1 context gathered intel synthesis. Coverage validated: 11/11 v1 REQs mapped. Resume file: .planning/phases/01-stabilize-video-pipeline/01-CONTEXT.md