Phase 2 (Stabilize export pipeline) planning ceremony complete: - /gsd-discuss-phase 2 → 02-CONTEXT.md (cc042a5) with 3 locked decisions (D-P2-01 offscreen Blob URL; D-P2-02 meta.urls schema; D-P2-03 full scope) - /gsd-plan-phase 2 → 4 plans (0608b22) → revision iteration 1 per checker (9dcfcf0; B1 tabs permission + 4 informational flags resolved) → plan-checker iteration 2 GREEN → constraint sync (df8c086) - DEC-011 Amendment 1 landed: `tabs` permission added to manifest for D-P2-02 meta.urls feature HANDOFF.json + .continue-here.md capture: - 10 completed-this-session items (resume + researcher + Plan 01-14 + Plan 01-12 + Plan 01-10 cycle-2 + Phase 1 verifier + alpha distribution + re-phasing + Phase 2 discuss + Phase 2 plan) - 3 remaining tasks (Phase 2 execute, Phase 3 prep, Phase 4 optional) - 5 decisions this session - 2 advisory anti-patterns (/gsd-remove-phase CLI cascading bug; charter-shift-via-discuss-phase pattern) - Phase 4 backlog (8 items accumulated) - Test baselines (vitest 153, UAT 24, FORBIDDEN_HOOK_STRINGS 12) Branch identity preserved at gsd/phase-01-stabilize-video-pipeline per /gsd-plan-phase workflow invariant — ROADMAP phase rename does NOT mutate branch name. Alpha distribution shipped to testers in parallel: dist-archives/mokosh-build-2026-05-20-6dbed91.zip SHA256: 2a9ffe6797534d6a4cf5e040dccde8772245407483693efa17fdd1caca8b1f66 Next session: /gsd-resume-work → /gsd-execute-phase 2. Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
110 lines
8.2 KiB
Markdown
110 lines
8.2 KiB
Markdown
---
|
|
context: phase
|
|
phase: 02-stabilize-export-pipeline
|
|
plan_count: 4
|
|
status: paused
|
|
last_updated: 2026-05-20T12:54:42.079Z
|
|
---
|
|
|
|
# BLOCKING CONSTRAINTS — None
|
|
|
|
> No blocking constraints introduced this session. Two **advisory** anti-patterns logged below (do not gate resumption).
|
|
|
|
## Critical Anti-Patterns
|
|
|
|
| Pattern | Description | Severity | Prevention Mechanism |
|
|
|---------|-------------|----------|---------------------|
|
|
| `/gsd-remove-phase` CLI cascading rename | gsd-sdk query phase.remove (and its /gsd-remove-phase Skill wrapper) has a bug at `~/.claude/get-shit-done/bin/lib/phase.cjs:670-679`: reverse-iteration loop cascades renames — Phase 5→4, then 4→3 catches just-renamed-from-5, then 3→2 catches all → collapses subsequent phases to "Phase 2". Plus line 676 regex corrupts "2026-XX" → "2002-XX". Verified in this session's first /gsd-remove-phase 2 attempt; recovered via manual edits + revert. | advisory | Upstream GSD-framework bug, NOT Mokosh-side. NEXT-SESSION: if removing a future phase, prefer manual ROADMAP/STATE/REQUIREMENTS edits over /gsd-remove-phase until upstream fixed. /gsd-discuss-phase + /gsd-plan-phase Skills work correctly. |
|
|
| Charter shift mid-project | User's "log is internal" realization mid-session triggered roadmap re-scope (Phase 2 DOM/privacy removed entirely). | advisory | Charter shifts are LEGITIMATE; user is the visionary. /gsd-discuss-phase is the canonical surface; PROJECT.md DEC-* table is where amendments land with provenance. |
|
|
|
|
---
|
|
|
|
## Current State
|
|
|
|
**Phase 2 (Stabilize export pipeline) PLANNING COMPLETE.** Ready for execution.
|
|
|
|
- Branch: `gsd/phase-01-stabilize-video-pipeline` at HEAD `df8c086`
|
|
- 4 plans validated + plan-checker iteration 2 GREEN
|
|
- Test baselines: vitest 153/153 GREEN · UAT 24/24 GREEN · build clean · Tier-1 FORBIDDEN_HOOK_STRINGS = 12 · production bundle hook-free
|
|
- Working tree: clean
|
|
- Alpha distribution shipped: `dist-archives/mokosh-build-2026-05-20-6dbed91.zip` (testers running in parallel)
|
|
|
|
## Plans Ready for Execution
|
|
|
|
| Plan | Wave | Type | Scope | Closes |
|
|
|---|---|---|---|---|
|
|
| **02-01** | 1 | tdd | RED tests scaffold — `blob-url-download.test.ts` + `meta-json-urls-schema.test.ts` + `strict-meta-json-validation.test.ts`; 15 it() blocks total | Test contracts for D-P2-01/02/03 |
|
|
| **02-02** | 2 | auto | Blob URL pipeline — offscreen `URL.createObjectURL` + SW `chrome.downloads.download(url)` + `onChanged` revoke lifecycle; new PortMessageType (CREATE_DOWNLOAD_URL / DOWNLOAD_URL / REVOKE_DOWNLOAD_URL); depends_on [02-01] | **P0-6** |
|
|
| **02-03** | 2 | auto | meta.urls + tab-url-tracker module + manifest "tabs" permission + PROJECT.md DEC-011 Amendment 1 + manifest-i18n test update; depends_on [02-01] | **P1 #10** |
|
|
| **02-04** | 3 | auto + human-verify | UAT harness A24-A28 (Blob URL, <5s latency, 8-field meta, multi-tab urls, archive-layout set-equality) + operator empirical UAT cycle 1; depends_on [02-02, 02-03] | Phase 2 closure |
|
|
|
|
## Recent commit chain (most recent first)
|
|
|
|
- `df8c086` docs(02): sync CON-manifest-permissions constraint with DEC-011 Amendment 1
|
|
- `9dcfcf0` fix(02): revise plans per checker (B1 + 4 flags) — add tabs permission for D-P2-02
|
|
- `0608b22` feat(02): plans 01-04 — Phase 2 export pipeline closure (Blob URL + meta.urls + schema + harness)
|
|
- `cc042a5` docs(02): capture phase context — discuss-phase complete
|
|
- `6dbed91` docs(roadmap): re-phase milestone — remove Phase 2 (DOM/event-capture privacy)
|
|
- `586836f` docs(01): VERIFICATION + Phase 1 closure markers — goal-backward audit GREEN
|
|
- (… Phase 1 closure commits earlier)
|
|
|
|
## Required Reading (in order)
|
|
|
|
1. `.planning/HANDOFF.json` — machine-readable handoff (sibling to this file)
|
|
2. `.planning/STATE.md` — current progress (Phase 1 CLOSED; Phase 2 ready)
|
|
3. `.planning/ROADMAP.md` — post-re-phasing structure (4 phases now; Phase 2 = export)
|
|
4. `.planning/REQUIREMENTS.md` — REQ-meta-json-schema, REQ-archive-export-latency, etc.
|
|
5. `.planning/PROJECT.md` — DEC-011 Amendment 1 + CON-manifest-permissions sync
|
|
6. `.planning/phases/02-stabilize-export-pipeline/02-CONTEXT.md` — D-P2-01/02/03 locked decisions + Revision Log
|
|
7. `.planning/phases/02-stabilize-export-pipeline/02-01-PLAN.md` — first plan to execute (Wave 1 RED tests)
|
|
8. `.planning/phases/02-stabilize-export-pipeline/02-02-PLAN.md` — Wave 2 Blob URL pipeline
|
|
9. `.planning/phases/02-stabilize-export-pipeline/02-03-PLAN.md` — Wave 2 meta.urls + tab-tracker + tabs permission
|
|
10. `.planning/phases/02-stabilize-export-pipeline/02-04-PLAN.md` — Wave 3 harness + operator UAT
|
|
11. Auto-memory at `/home/parf/.claude/projects/-home-parf-projects-work-repremium/memory/MEMORY.md` — feedback constraints from prior sessions
|
|
|
|
## Decisions Locked This Session
|
|
|
|
- **DEC-011 Amendment 1** (committed `9dcfcf0`): `tabs` added to manifest permissions for Phase 2 D-P2-02 meta.urls feature. Audit T-1-02 acknowledged but overridden — permission is genuinely USED.
|
|
- **D-P2-01** (in 02-CONTEXT.md): Offscreen-minted Blob URL pipeline replaces base64 data: URL download. Closes audit P0-6.
|
|
- **D-P2-02** (in 02-CONTEXT.md): meta.json schema migrates `url:string` → `urls:string[]`. Closes audit P1 #10. SessionMetadata interface + CON-meta-json-schema both amended.
|
|
- **D-P2-03** (in 02-CONTEXT.md): Full scope = bug fixes + strict schema validation + harness <5s latency assertion. ~3-4 plans (4 produced).
|
|
- **Re-phasing 2026-05-20** (committed `6dbed91`): Original Phase 2 (DOM/event-capture privacy) REMOVED entirely. REQ-rrweb-dom-buffer + REQ-user-event-log absorbed by new Phase 3 (SPEC §10 smoke). REQ-password-confidentiality → Out of Scope (v1). Total phases 5 → 4.
|
|
|
|
## Next-Session Order of Operations
|
|
|
|
1. **`/gsd-resume-work`** to load this `.continue-here.md` + `.planning/HANDOFF.json`
|
|
2. **Acknowledge any blocking constraints** (none this time; only advisory anti-patterns above)
|
|
3. **`/gsd-execute-phase 2`** to start Phase 2 execution (canonical Skill)
|
|
- Alternative: `/gsd-execute-phase 2 --wave 1` lands just the RED tests scaffold (~15-30min) for tomorrow's first iteration
|
|
4. After Phase 2 closes: `/gsd-verify-work 2` (canonical Phase 2 goal-backward audit)
|
|
5. After Phase 2 marker flip: `/gsd-discuss-phase 3` (new Phase 3 = SPEC §10 smoke + DOM/event-log verification absorbed from old Phase 2)
|
|
6. Phase 3 → Phase 4 (optional) per ROADMAP
|
|
|
|
## Infrastructure State
|
|
|
|
- Branch: `gsd/phase-01-stabilize-video-pipeline` at HEAD `df8c086` — branch name preserved per /gsd-plan-phase workflow invariant (branch identity is owned by user's git workflow; ROADMAP phase rename does NOT mutate branch name)
|
|
- Build clean: `npm run build` 2.87s; `dist/` reflects current code state (post-re-phasing, post-Plan-01-10, post-all-debug-fixes)
|
|
- Alpha distribution: `dist-archives/mokosh-build-2026-05-20-6dbed91.zip` + INSTALL.md (testers running in parallel)
|
|
- Two pre-existing vitest flakes (ffprobe/ffmpeg) deferred to Phase 4 hardening; do NOT block Phase 2
|
|
|
|
## Phase 4 Backlog (informational; not gating Phase 2)
|
|
|
|
Accumulated through this session for future Phase 4 hardening:
|
|
|
|
- 2 pre-existing vitest flakes (ffprobe/ffmpeg)
|
|
- `setimmediate` polyfill `new Function` in SW chunk via `vite-plugin-node-polyfills` (pre-existing)
|
|
- `getDisplayMedia` cursor visibility refinement (Plan 01-07 operator observation 2026-05-15)
|
|
- Dark-surface logo contrast (Plan 01-10 operator observation 2026-05-20)
|
|
- rrweb 2.0.0-alpha.4 → stable v2 upgrade research (in Phase 3 plans now? or defer to Phase 4)
|
|
- ROADMAP backfill for Plans 01-08..01-13 entries (Plan 01-13 plan-checker flag #4)
|
|
- REQ-password-confidentiality v2 candidate
|
|
- Audit P1 #11 (fetch Request→[object Request]), #14 (navigation URL), #15 (rrweb timestamp semantics)
|
|
|
|
## Context
|
|
|
|
Massive session: 2026-05-19 morning → 2026-05-20 afternoon overnight. Phase 1 closed end-to-end (14/14 plans + 5 operator acks + verifier GREEN); alpha distributed; charter shifted ("log is internal"); roadmap re-phased; Phase 2 fully planned + validated. User explicitly chose canonical GSD ceremony throughout: /gsd-discuss-phase + /gsd-plan-phase + plan-checker revision loop all worked correctly (only /gsd-remove-phase had the upstream CLI bug; recovered manually). Phase 2 is ready to execute as soon as next session opens.
|
|
|
|
## Next action
|
|
|
|
Start with: `/gsd-resume-work` to load this handoff, then `/gsd-execute-phase 2` to start Phase 2 execution.
|