Plan 04-07 closure SUMMARY. Phase 4 closure-prep complete; pending independent gsd-verifier audit + closure-ceremony marker flips per Phase 1-3 precedent. Deliverables: - .planning/phases/04-harden-clean-up-optional/04-VERIFICATION.md (253 lines; 13 ## sections; 67 Plan 04-0 citations; 9 operator-ack literal hits; 44 commit refs; covers all 8 Phase 4 plans + 3 /gsd-debug sessions + 4 ROADMAP SC + 3 audit P1 + 6 cross-cutting hardening + 5/5 D-P4-* charters + Phases 1-4 cumulative gates) - .planning/REQUIREMENTS.md (4 Phase 4 closure notes appended; trailing footer updated; no existing REQ-* lines modified) - .planning/ROADMAP.md (Plan 04-07 row [x] flipped + progress table updated 7/8 → 8/8; Phase 4 row [ ] LEFT unflipped per Phase 1-3 precedent) - .planning/STATE.md (completed_plans 29→30 + percent 93→97; completed_phases STAYS 3 + status STAYS executing; Plan 04-07 closure section + decisions + metric + session continuity) - .planning/PROJECT.md (NEW Validated in Phase 4 section; Active section evolution to closure ceremony + v1.1/v2 deferred items) Acceptance criteria all PASS (gates per Plan 04-07 verify block): - 04-VERIFICATION.md exists, parseable YAML, 13 ## sections (>= 5), 253 lines (>= 120), 67 Plan 04-0 citations (>= 6), 9 operator-ack literal hits (>= 1), 44 commit refs (>= 6) - ROADMAP.md Plan 04-07 [x] = 1; Phase 4 [x] = 0 (correctly LEFT unflipped) - STATE.md completed_phases: 3 (UNCHANGED); completed_plans: 30 (+1); status: executing (UNCHANGED); percent: 97 (+4) - REQUIREMENTS.md Phase 4 closure notes = 4 (>= 3); PROJECT.md Validated in Phase 4 = 1 - git diff --stat HEAD~3 HEAD shows only .planning/ files dirty (T-04-07-02 threat mitigation honored — docs-only closure) Phase 4 cumulative tally (final via Plan 04-07 aggregator): - 8 plans closed (04-01..04-08; inserted Plan 04-08 Wave 5.5 post-debug) - 31 plans total across Phases 1-4 (14 + 4 + 5 + 8) - UAT harness 33 → 36 GREEN (+A33 + A34 + A35) - vitest 171 → 188 GREEN (+17 across Plans 04-01/02/06/08) - Pre-checkpoint bundle gates 6/6 PASS (Gate 2 polarity flipped 1→0) - Tier-1 FORBIDDEN_HOOK_STRINGS unchanged at 12 entries - NEW Tier-2 production-bundle filename-leak gate (Plan 04-08) - 3 /gsd-debug sessions documented + resolved - 5/5 D-P4-* charter closures (D-P4-01..D-P4-05) - 1 operator-empirical ack 2026-05-26: "Confirmed fixed — close Plan 04-06" Next step (orchestrator workstream): independent gsd-verifier audit against 04-VERIFICATION.md → Phase 4 row [x] flip + STATE.md completed_phases 3→4 + status:executing→completed → v1.0 tag + alpha redistribution per D-P4-04 charter (out-of-band).
28 KiB
phase, plan, subsystem, tags, requires, provides, affects, tech-stack, key-files, key-decisions, patterns-established, requirements-completed, duration, completed, tasks, files-modified
| phase | plan | subsystem | tags | requires | provides | affects | tech-stack | key-files | key-decisions | patterns-established | requirements-completed | duration | completed | tasks | files-modified | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 04-harden-clean-up-optional | 07 | closure-aggregator |
|
|
|
|
|
|
|
|
~15 min (closure aggregator write + 4 marker file flips + SUMMARY + 3 commits) | 2026-05-26 | 2 | 4 modified + 2 created |
Phase 04 Plan 07: Phase 4 Closure Aggregator — v1 Milestone Close-Prep Summary
04-VERIFICATION.md aggregator created end-to-end (253 lines; 13 ## sections; 67 Plan 04-0 citations; 9 operator-ack literal hits; 44 commit references) + 4 marker file flips (REQUIREMENTS / ROADMAP / STATE / PROJECT) — Phase 4 closure-prep complete; pending independent gsd-verifier audit + closure-ceremony marker flips per Phase 1-3 precedent.
Performance
- Duration: ~15 min executor wall-clock (closure aggregator write + 4 marker file flips + SUMMARY + 3 atomic commits)
- Started: 2026-05-26T11:19:00Z
- Completed: 2026-05-26T11:35:00Z
- Tasks: 2 of 2 plan tasks complete (Task 1: 04-VERIFICATION.md; Task 2: 4 marker file flips)
- Files modified: 4 modified + 2 created
- Production source changes: 0 (Plan 04-07 is docs-only per the closure ceremony charter)
Accomplishments
-
04-VERIFICATION.md aggregator created end-to-end (Task 1, commit
7a69865): 253 lines covering all 8 Phase 4 plans + 3 /gsd-debug sessions + 4 ROADMAP SC closures + 3 audit P1 polish items + 6 cross-cutting hardening items + 5/5 D-P4-* charter closures + Phases 1-4 cumulative gate evidence + verbatim operator-empirical ack. 13 ## sections: Goal + Per-Requirement Scorecard (ROADMAP SCs + Audit P1 Polish + Cross-Cutting Hardening Items) + Cross-Cutting Gates + Phase 4 Plan Closure Anchor Map + Operator-Empirical Acks + /gsd-debug Session Inventory + D-P4-* Charter Closures + ROADMAP backfill verification + Per-Phase Plans Across Phases 1-4 + Threat Surface Scan + Deferred Items + Closure Statement + Self-Check. -
REQUIREMENTS.md Phase 4 closure verification status notes added (Task 2, commit
5d0b40c): 4 closure note blocks appended at the end of REQ-video-ring-buffer (ROADMAP SC #1 via Plan 04-08), REQ-rrweb-dom-buffer (A29 cs-injection-world rewrite + UAT 33→36 summary), REQ-user-event-log (ROADMAP SC #2 via Plan 04-05 + audit P1 #11/#14/#15 via Plan 04-01), REQ-install-clean (ROADMAP SC #3 + SC #4 + Plan 04-02 build hygiene + Plan 04-08 Tier-2 leak gate). Existing REQ-* lines + [x] checkboxes UNCHANGED — append-only discipline preserved. -
ROADMAP.md Plan 04-07 row flipped + progress table updated (Task 2, commit
5d0b40c): Plan 04-07 row[ ]→[x]with full closure annotation (04-VERIFICATION.md citation + Phase 4 cumulative totals + D-P4-05 backfill verification + closure-ceremony deferral note). Phase 4 progress table cell updated 7/8 → 8/8 with full closure-prep narrative. Phase 4 row[ ]LEFT UNFLIPPED — verifier audit + closure ceremony flips it per Phase 1-3 precedent. -
STATE.md updated end-to-end (Task 2, commit
5d0b40c): frontmatter progress.completed_plans 29 → 30 + progress.percent 93 → 97; progress.completed_phases STAYS 3 + status STAYS executing (closure ceremony flips them); stopped_at + last_updated + last_activity updated for Plan 04-07 closure; Current Position block updated to reflect Plan 04-07 completion + pending closure ceremony; Plan 04-07 closure section added at top of body; Performance metric row added for Phase 04 P07; Session Continuity entry prepended for Plan 04-07; 2 Phase 04-07 decisions appended to Decisions list. -
PROJECT.md Validated section evolved end-to-end (Task 2, commit
5d0b40c): NEW "Validated in Phase 4" section added (7 bullets covering all closures); Active section evolved from Phase 4 backlog → Phase 4 closure ceremony workstream + Deferred-to-v1.1/v2 maintenance milestone items; trailing footer line updated with 2026-05-26 Phase 4 closure citation. -
D-P4-05 ROADMAP backfill verification CLOSED: Plans 01-08..01-14 rows verified present at ROADMAP.md lines 90-96 with
[x]closure annotations; no row additions needed (PATTERNS.md mapping held). Documented as a per-plan verification table in 04-VERIFICATION.md ROADMAP backfill verification section.
Task Commits
Each plan task was committed atomically with normal git commits + pre-commit hooks (sequential foreground mode; in-line with Plans 04-01 through 04-06 + 04-08 protocol):
-
Task 1 — Phase 4 closure aggregator (04-VERIFICATION.md) —
7a69865(docs). 1 file created:.planning/phases/04-harden-clean-up-optional/04-VERIFICATION.md(253 lines; 13 ## sections; 67 Plan 04-0 citations; 9 operator-ack literal hits; 44 commit refs). Acceptance criteria all met: >= 5 ## sections (13); >= 6 Plan 04-0 citations (67); >= 1 operator-ack literal (9); >= 120 lines (253); >= 6 commit mentions (44). -
Task 2 — Closure markers REQUIREMENTS + ROADMAP + STATE + PROJECT —
5d0b40c(docs). 4 files modified: REQUIREMENTS.md (4 Phase 4 closure notes + footer); ROADMAP.md (Plan 04-07 row flip + progress table); STATE.md (counter + position + decisions + metrics + session continuity); PROJECT.md (Validated section evolution + Active section evolution + footer). Acceptance criteria all met: ROADMAP 04-07 [x] = 1; ROADMAP Phase 4 [x] = 0 (correctly LEFT unflipped); STATE.md completed_phases: 3 = UNCHANGED; STATE.md completed_plans: 30 = incremented; STATE.md status: executing = UNCHANGED; REQUIREMENTS.md Phase 4 closure note count = 4 (>= 3); PROJECT.md Validated in Phase 4 = 1.
Plan metadata commit (this SUMMARY): to be committed atomically after this file lands.
Files Created/Modified
Created
.planning/phases/04-harden-clean-up-optional/04-VERIFICATION.md— CREATED (253 lines). 13 ## sections covering:- Goal (verbatim ROADMAP.md + PROJECT.md)
- Per-Requirement Scorecard (ROADMAP SCs 4/4 + Audit P1 Polish 3/3 + Cross-Cutting Hardening 6/6)
- Cross-Cutting Gates (vitest 171→188 + UAT 33→36 + Tier-1 12 + 6/6 bundle gates + tsc + NEW Tier-2 gate)
- Phase 4 Plan Closure Anchor Map (8 plans + 1 SPIKE FAILED outcome)
- Operator-Empirical Acks (verbatim "Confirmed fixed — close Plan 04-06" + TWEAK cycle-1)
- /gsd-debug Session Inventory (3 sessions: canvas-throttling sessions 1+2; Plan 04-06 dark-mode; A33.1 SAVE-ack race)
- D-P4-* Charter Closures (5/5)
- ROADMAP backfill verification (D-P4-05)
- Per-Phase Plans Across Phases 1-4
- Threat Surface Scan
- Deferred Items (8 entries: rrweb v2 + SW-RAM measurement + REQ-password-confidentiality + spike script + alpha-tester + A29/A30/A31 flake + 04-CONTEXT #9/#10 parallel-vitest + A33 SAVE-ack race resolved)
- Closure Statement
- Self-Check
.planning/phases/04-harden-clean-up-optional/04-07-SUMMARY.md— CREATED (this file).
Modified
.planning/REQUIREMENTS.md— MODIFIED. 4 Phase 4 closure notes appended to existing REQ blocks (REQ-video-ring-buffer + REQ-rrweb-dom-buffer + REQ-user-event-log + REQ-install-clean). Trailing footer line updated with 2026-05-26 Phase 4 closure citation. NO existing REQ-* lines modified (append-only discipline; preserves canonical REQ semantic text + [x] checkbox state from prior phase closures)..planning/ROADMAP.md— MODIFIED. Plan 04-07 row[ ]→[x]with full closure annotation. Phase 4 progress table cell updated 7/8 → 8/8 with full closure-prep narrative. Phase 4 row[ ]LEFT UNFLIPPED (verifier audit + closure ceremony flips it)..planning/STATE.md— MODIFIED. Frontmatter: stopped_at + last_updated + last_activity updated; progress.completed_plans 29 → 30 + progress.percent 93 → 97; progress.completed_phases STAYS 3; status STAYS executing. Body: Current Position updated; Plan 04-07 closure section added at top; Performance metric row added; Session Continuity entry prepended; 2 Phase 04-07 decisions appended to Decisions list..planning/PROJECT.md— MODIFIED. NEW "Validated in Phase 4" section added (7 bullets). Active section evolved from Phase 4 backlog → Phase 4 closure ceremony workstream + Deferred-to-v1.1/v2 maintenance milestone items. Trailing footer line updated with 2026-05-26 Phase 4 closure citation.
Decisions Made
See key-decisions in frontmatter for the canonical list (6 decisions). Highlights:
- Closure-ceremony deferral honored — Phase 4 row [x] flip + completed_phases 3→4 + status:executing→completed flip are DEFERRED to the closure ceremony AFTER the independent gsd-verifier audit per Phase 1-3 precedent.
- STATE.md status STAYS executing during Plan 04-07 — per the project_specific_constraints, status flips to completed ONLY after the gsd-verifier audit passes.
- REQUIREMENTS.md Phase 4 closure note placement — appended as NEW closure-note blocks; NO existing REQ-* lines modified (append-only discipline).
- D-P4-05 ROADMAP backfill verification — Plans 01-08..01-14 rows VERIFIED present; no row additions needed (PATTERNS.md mapping held).
- 04-VERIFICATION.md scope per stale_plan_frontmatter_corrections — written against the ACTUAL Phase 4 state (8 plans, UAT 36/36, vitest 188/188, 3 /gsd-debug sessions) per the orchestrator's correction block (NOT the stale plan frontmatter claims of 6 plans / UAT 33→35 / 0 debug sessions).
- Operator-empirical ack verbatim grep gate (REVISION iter-2 WARNING 4) — 9 hits on
approved|All good|APPROVED|approved by|operator ack|all good|Confirmed fixed(far exceeds >=1 threshold); verbatim ack 'Confirmed fixed — close Plan 04-06' appears in multiple sections.
Deviations from Plan
Minor adjustment for actual Phase 4 state per stale_plan_frontmatter_corrections block (NOT a Rule 1-4 deviation; orchestrator-provided correction):
The Plan 04-07 frontmatter was written BEFORE the SC#1 saga + Plan 04-08 insertion + A35 + 04-06 multi-iteration ceremony, so several frontmatter claims were stale:
- Plan frontmatter said
score: 4/4 ROADMAP success criteria + 3/3 audit P1 polish items + 5/5 hardening items (setimmediate + dead-code + generate-icons + A29 race + cursor verify + dark-logo)— ACTUAL: 4/4 ROADMAP SC + 3/3 audit P1 + 6/6 hardening items (added: theme decoupling via--mks-mark-strokebrand-component token as a separate H6 row distinct from "dark-logo contrast strategy"). - Plan frontmatter said
UAT harness count updated from 33 to 35— ACTUAL: 33 → 36 (Plan 04-08 added A33; Plan 04-05 added A34; Plan 04-06 added A35 with 5 sub-checks). - Plan frontmatter said
vitest baseline 171 -> >=185 GREEN— ACTUAL: 171 → 188 GREEN. - Plan frontmatter said
total_plans: 30 (was 23; +7 from Phase 4)— ACTUAL: total_plans is 31 (Plan 04-08 was inserted; 14+4+5+8 = 31). - Plan frontmatter said
Plans 04-01..04-07— ACTUAL: 8 plans (04-01 through 04-08, including inserted Wave 5.5 plan 04-08).
The 04-VERIFICATION.md was written against the ACTUAL state (verified via grep against STATE.md + ROADMAP.md + per-plan SUMMARYs at HEAD c790c6a) per the orchestrator-provided stale_plan_frontmatter_corrections block. This is NOT a Rule 1-4 deviation; the corrections were explicit input from the orchestrator (the plan author had already acknowledged the staleness by providing the full corrected state inline in the prompt).
Total deviations: 0 (none; the stale_plan_frontmatter_corrections block was orchestrator-provided input, not an executor-side correction).
Issues Encountered
None. The 04-VERIFICATION.md write was a clean aggregation of prior SUMMARYs (read 04-01..04-08 SUMMARYs + 3 /gsd-debug session notes + Phase 1+2+3 VERIFICATION.md precedents). The 4 marker file flips followed the canonical Phase 1-3 closure-prep pattern. No code changes needed (docs-only). No deviations triggered (Rules 1-4 inapplicable). No checkpoint stops. No auth gates.
Verification — Acceptance Criteria
Per Plan 04-07 <verify><automated> + <acceptance_criteria>:
Task 1 (04-VERIFICATION.md) acceptance gates
| Gate | Threshold | Actual | Status |
|---|---|---|---|
File exists at .planning/phases/04-harden-clean-up-optional/04-VERIFICATION.md |
YES | YES | PASS |
| Frontmatter valid YAML (parseable; required fields present) | YES | YES | PASS |
File has >= 5 top-level ## sections |
>= 5 | 13 | PASS |
| File >= 120 lines | >= 120 | 253 | PASS |
grep -c 'Plan 04-0' 04-VERIFICATION.md |
>= 6 | 67 | PASS |
grep -c 'commit' 04-VERIFICATION.md |
>= 6 | 44 | PASS |
Operator ack gate grep -cE 'approved|All good|APPROVED|approved by|operator ack|all good|Confirmed fixed' |
>= 1 | 9 | PASS |
Task 2 (Marker flips) acceptance gates
| Gate | Threshold | Actual | Status |
|---|---|---|---|
grep -c '^- \[x\] 04-07-PLAN' ROADMAP.md |
>= 1 | 1 | PASS |
grep -c '^- \[x\] \*\*Phase 4' ROADMAP.md |
== 0 (LEFT unflipped) | 0 | PASS |
grep -c 'completed_phases: 3' STATE.md |
UNCHANGED | 2 (frontmatter + body) | PASS |
grep -c 'completed_plans: 30' STATE.md |
== 1 (incremented from 29) | 1 | PASS |
grep -c '^status: executing' STATE.md |
== 1 (UNCHANGED) | 1 | PASS |
grep -c 'Phase 4 closure note' REQUIREMENTS.md |
>= 3 | 4 | PASS |
grep -c 'Validated in Phase 4' PROJECT.md |
>= 1 | 1 | PASS |
Threat-model gates honored
| Threat ID | Mitigation | Status |
|---|---|---|
| T-04-07-01 (over-claim closure) | Scorecard rows cite specific UAT assertion ID (A33.1/A34.1-A34.5/A35.1-A35.5) + commit hash for each | PASS |
| T-04-07-02 (docs-pure closure commit) | git diff --stat HEAD~1 HEAD shows only .planning/ files dirty (Task 1 + Task 2 commits both pure docs) |
PASS |
| T-04-07-03 (advisory not gating for alpha decision) | Documented in scorecard + STATE.md status field clarifies v1 close-pending-verifier-audit distinction | PASS |
| T-04-07-04 (REVISION iter-2 WARNING 4 placeholder ack) | Operator-empirical ack literal greps to 9 hits; verbatim 'Confirmed fixed — close Plan 04-06' appears in 04-VERIFICATION.md human_verification[0].evidence frontmatter field + multiple body sections | PASS |
Self-Check
Verifying claims before declaring plan complete (per executor protocol §self_check):
Files created:
.planning/phases/04-harden-clean-up-optional/04-VERIFICATION.md— FOUND (253 lines verified via wc -l; committed at7a69865).planning/phases/04-harden-clean-up-optional/04-07-SUMMARY.md— FOUND (this file, just written)
Files modified:
.planning/REQUIREMENTS.md— FOUND (4 Phase 4 closure notes + footer; committed at5d0b40c).planning/ROADMAP.md— FOUND (Plan 04-07 row flipped + progress table updated; committed at5d0b40c).planning/STATE.md— FOUND (counter + position + decisions + metrics + session continuity updated; committed at5d0b40c).planning/PROJECT.md— FOUND (Validated in Phase 4 section + Active section evolution + footer updated; committed at5d0b40c)
Commits:
7a69865Task 1 (docs(04-07): Phase 4 closure — 04-VERIFICATION.md aggregator) — FOUND ingit log --oneline -35d0b40cTask 2 (docs(04-07): closure markers — REQUIREMENTS + ROADMAP + STATE + PROJECT for Phase 4 v1 close-prep) — FOUND ingit log --oneline -3
Verification gates (all PASS):
- 04-VERIFICATION.md: 253 lines / 13 ## sections / 67 Plan 04-0 citations / 9 operator-ack literal hits / 44 commit references
- ROADMAP.md Plan 04-07 row [x] = 1; Phase 4 row [x] = 0 (correctly LEFT unflipped)
- STATE.md completed_phases: 3 (UNCHANGED); completed_plans: 30 (+1); status: executing (UNCHANGED); percent: 97 (+4)
- REQUIREMENTS.md Phase 4 closure note count = 4 (>= 3 required)
- PROJECT.md Validated in Phase 4 section count = 1 (>= 1 required)
git diff --stat HEAD~2 HEADshows only.planning/files dirty (T-04-07-02 threat mitigation honored)- Working tree clean post-commits
Self-Check: PASSED
All claims verified. Plan 04-07 closes at Task 2 with all acceptance criteria GREEN.
Next Step (out of Plan 04-07 scope; orchestrator workstream)
Phase 4 formal closure ceremony:
- Independent gsd-verifier audit: orchestrator spawns gsd-verifier to perform a goal-backward audit against
.planning/phases/04-harden-clean-up-optional/04-VERIFICATION.md. Verifier independently re-validates the 4 ROADMAP SC + 3 audit P1 polish + 6 cross-cutting hardening items + 5/5 D-P4-* charter closures against codebase HEAD; emits a verifier-pass annotation or surfaces gaps. Phase 1-3 precedent: verifier elevates Phase to formally-CLOSED state. - ROADMAP.md Phase 4 row flip: orchestrator flips
- [ ] **Phase 4: ...→- [x] **Phase 4: ...with CLOSED 2026-05-26 annotation + verifier audit cite + 04-VERIFICATION.md cite. Progress table row also flipped to CLOSED. - STATE.md final flip: orchestrator flips
progress.completed_phases: 3 → 4+progress.percent: 97 → 100+status: executing → completed. - v1.0 tag + release notes + alpha redistribution: separate workstream per D-P4-04 charter (user-routed out-of-band).
Phase: 04-harden-clean-up-optional Plan: 07 (Phase 4 closure aggregator + v1 milestone close-prep) Completed: 2026-05-26 Outcome: 04-VERIFICATION.md aggregator created end-to-end + 4 marker file flips for Phase 4 close-prep + D-P4-05 ROADMAP backfill verification; pending independent gsd-verifier audit + closure-ceremony marker flips per Phase 1-3 precedent.