context, phase, plan_count, status, last_updated
| context | phase | plan_count | status | last_updated |
|---|---|---|---|---|
| phase | 04-harden-clean-up-optional | 7 | paused | 2026-05-21T08:22:59.958Z |
BLOCKING CONSTRAINTS — None
No blocking constraints introduced this session. Three advisory anti-patterns logged below (do not gate resumption).
Critical Anti-Patterns
| Pattern | Description | Severity | Prevention Mechanism |
|---|---|---|---|
| state.record-session CLI bug — recurring | gsd-sdk query state.record-session flips STATE.md status to completed when total_plans/completed_plans ratio triggers it. Recurred at 8+ state.record-session calls this session. |
advisory | NEXT-SESSION: manually fix STATE.md status field after every state.record-session call. Upstream GSD framework concern; not Mokosh-side. |
| /gsd-plan-phase UI gate auto-exits on manual invocation | Manual /gsd-plan-phase cannot nested-Skill-spawn /gsd-ui-phase due to AskUserQuestion-in-subcontext issue #1009. Workflow correctly exits + tells user to run /gsd-ui-phase separately. | advisory | Pattern used twice this session (Phase 3 + Phase 4); preserve gate answers in .plan-phase-preferences.md (auto-deleted on next plan-phase consumption). Standard pattern; not a defect. |
| Plan-checker line-range disjointness check missing | Plan-checker only validates file-level overlap; doesn't check line-range disjointness for potential parallelization wins. | advisory | NEXT-SESSION: when reviewing wave structure, manually check line-range disjointness if files_modified overlap is present. |
Current State
Phase 4 (Harden + clean up — optional) PLANNING COMPLETE. Ready for execution. This is the final v1 milestone phase.
- Branch:
gsd/phase-03-spec-10-smoke-verification-dom-event-log-verificationat HEAD55369b8(Phase 4 branch NOT yet created — happens in/gsd-execute-phase 4per branching_strategy=phase) - 7 plans validated + plan-checker iter-2 PASSED + 3 cosmetic advisories fixed
- Test baselines: vitest 171/171 GREEN · UAT 33/33 GREEN · Tier-1 FORBIDDEN_HOOK_STRINGS 12 · pre-checkpoint bundle gates 6/6 PASS
- Working tree: clean
Plans Ready for Execution
| Plan | Wave | Type | Scope | Closes |
|---|---|---|---|---|
| 04-01 | 1 | tdd | Audit P1 polish (RED→GREEN 3 unit tests in src/content/index.ts:147 + 99-109 + 36-42) | Audit P1 #11/#14/#15 |
| 04-02 | 1 (parallel) | tdd | Build/CSP hygiene — setimmediate polyfill Option a + dead-code grep + generate-icons.cjs | ROADMAP SC #3 + #4 |
| 04-03 | 2 | auto | A29 cs-injection-world rewrite (strict-sentinel filter for IncrementalSource.Mutation) | ~1/3 flake from Phase 3 |
| 04-04 | 3 | spike→auto | A33 SW state persistence — Wave 0 SPIKE FIRST; chrome.runtime.sendMessage Option B | ROADMAP SC #1 |
| 04-05 | 4 | auto | A34 fetch+XHR network_error empirical (validates 04-01 P1#11 end-to-end) | ROADMAP SC #2 |
| 04-06 | 5 | auto + human-verify | Visual polish — dark-logo currentColor (5 UI-SPEC edits) + cursor verification + operator empirical | D-P4-03 |
| 04-07 | 6 | auto | VERIFICATION.md aggregator + ROADMAP backfill + REQ marker flips + milestone v1 close prep | D-P4-05 + Phase 4 closure |
Wave 1 parallelization: 04-01 + 04-02 are file-disjoint (04-01 src/content/* + 04-02 vite/SW/build-tests) — safe parallel. Waves 2-6 sequential: file-overlap on tests/uat/* harness files.
Recent commit chain (most recent first)
55369b8docs(state): record phase 4 plan-phase closure — iter-2 PASSED + 3 cosmetic advisories fixed3c1280edocs(04): plan-phase closure — 3 cosmetic advisories from checker iter-2 resolved76fffb3fix(04): revise plans per checker iter-1 — 2 BLOCKERS + 2 WARNINGS fixed526ac78docs(04): create phase plan — 7 plans for Phase 4 hardeningf012c8cdocs(04): pattern map — ~30 anticipated files mapped7178d14docs(phase-04): add validation strategyd1f6767docs(04): research phase domain — 5 findings incl. cursor:'always' ALREADY shipped61caf04docs(state): record phase 4 UI-SPEC session — APPROVED 5/6 + 1 FLAG266aa95docs(04): UI-SPEC.md status approved (5/6 PASS + 1 FLAG non-blocking)55cefbadocs(04): UI design contract — thin scope (dark-logo currentColor strategy)- (… Phase 3 closure + Phase 2 closure earlier)
Required Reading (in order)
.planning/HANDOFF.json— machine-readable handoff (sibling).planning/STATE.md— current progress (Phase 3 CLOSED; Phase 4 ready).planning/ROADMAP.md— 4-phase milestone structure; Phase 4 optional.planning/REQUIREMENTS.md— all v1 REQs verified (Phase 4 has no new REQs).planning/PROJECT.md— Validated section split by phase.planning/phases/04-harden-clean-up-optional/04-CONTEXT.md— 5 D-P4-* locked decisions.planning/phases/04-harden-clean-up-optional/04-UI-SPEC.md— thin-design-surface dark-logo (Option A currentColor; 5 prescribed file edits).planning/phases/04-harden-clean-up-optional/04-RESEARCH.md— 5 findings; CRITICAL finding 4: cursor:'always' ALREADY SHIPPED at src/offscreen/recorder.ts:285 (Plan 04-06 cursor task = verification only).planning/phases/04-harden-clean-up-optional/04-PATTERNS.md— ~30 files mapped + DEPRECATED banner at line 886 (citing Plan 04-04 Option B).planning/phases/04-harden-clean-up-optional/04-VALIDATION.md— 16-row per-task verification map; iter-2 revised.planning/phases/04-harden-clean-up-optional/04-0{1..7}-PLAN.md— 7 plans ready- Auto-memory at
/home/parf/.claude/projects/-home-parf-projects-work-repremium/memory/MEMORY.md— 4 feedback constraints from prior sessions
Decisions Locked This Session (Phase 4)
- D-P4-01: Full Phase 4 scope (all 4 ROADMAP SC + ~10 of 12 deferred items)
- D-P4-02: Audit P1 all three (#11 fetch + #14 nav URL + #15 rrweb timestamps)
- D-P4-03: Both visual polish items (cursor + dark-logo)
- D-P4-04: Alpha tester integration user-handled out-of-band
- D-P4-05: ROADMAP backfill in scope (docs hygiene)
- UI-SPEC Option A: currentColor SVG + ?raw import + DOMParser inline (5 file edits)
- Plan 04-04 Option B: chrome.runtime.sendMessage inline for SAVE_ARCHIVE dispatch (BLOCKER 2 fix — no dispatchSaveArchive helper)
- Plan 04-06 Task 4 glob:
dist/assets/index.ts-*.js(BLOCKER 1 fix + glob-existence pre-gate) - §10 #9 RAM closure: user explicit ack 2026-05-20 on harness scaffolding + alpha distribution coverage path
Next-Session Order of Operations
/gsd-resume-workto load this.continue-here.md+.planning/HANDOFF.json- Acknowledge any blocking constraints (none this session; 3 advisory anti-patterns above)
/gsd-execute-phase 4to start Phase 4 execution (~6-8h foreground; canonical Skill)- Alternative:
/gsd-execute-phase 4 --wave 1lands Wave 1 (04-01 + 04-02 parallel) only (~30-60 min)
- Alternative:
- After Phase 4 closes: milestone v1 close prep (fresh alpha re-distribution + v1.0 tag + release notes per D-P4-04)
Infrastructure State
- Branch:
gsd/phase-03-spec-10-smoke-verification-dom-event-log-verificationat HEAD55369b8— Phase 4 branch NOT yet created (happens in /gsd-execute-phase 4) - Working tree clean
- Test baselines preserved: vitest 171/171 GREEN · UAT 33/33 GREEN · Tier-1 12 · bundle gates 6/6 PASS
- Saved memories applied throughout: feedback-no-unilateral-scope-reduction + feedback-gsd-ceremony-for-fixes + feedback-pre-checkpoint-bundle-gates + feedback-trust-harness-over-manual-uat
Phase 4 Expected Outcomes
- vitest: 171 → ~180 GREEN (+~10 Wave 0 unit tests: P1 #11/#14/#15 + 2 build gates + welcome inline-svg)
- UAT harness: 33 → 35 GREEN (+A33 SW persistence + A34 fetch/XHR network_error)
- Tier-1 FORBIDDEN_HOOK_STRINGS: 12 unchanged (A33+A34 ride production surfaces)
- Bundle gates 6/6 PASS — Gate 2 (SW CSP-safety
new Function) flips from 1 documented exception to 0 hits after Plan 04-02 setimmediate polyfill replacement - ROADMAP success criteria #1-#4 all verified
- Plan 04-06 Task 4 operator empirical UAT (dark-logo aesthetic judgment in OS dark mode)
- Milestone v1 ready for tag + release notes after Phase 4 closure
Pending Human Action (non-blocking, deferred to Phase 4 execution)
- Plan 04-06 Task 4 operator empirical UAT — dark-logo aesthetic judgment in OS dark mode (UI-SPEC AC #6; canonical Phase 4 human-verify case)
- All other Phase 4 surfaces are harness-covered or grep-verifiable
Context
Massive session arc: 2026-05-20 → 2026-05-21 spanning Phase 2 execution + closure, Phase 3 full lifecycle (discuss + UI + plan + execute + closure), Phase 4 full pre-execution lifecycle (discuss + UI + research + pattern + plan + 2-iteration plan-checker revision). Three phases closed end-to-end; Phase 4 fully planned + validated; ready for execution. User explicitly chose canonical GSD ceremony throughout (consistent pattern across all phases). Test baseline growth this session: vitest 153→171 GREEN (+18); UAT 24→33 GREEN (+9 incl. A24-A32). 4 saved memories cited throughout. Phase 4 is the final v1 milestone phase; after closure, milestone v1 is ready for release.
Next action
Start with: /gsd-resume-work to load this handoff, then /gsd-execute-phase 4 to start Phase 4 execution.