After gsd-plan-phase 1: 7 plans across 7 waves. All gates pass:
- Plan-checker (sonnet) VERIFICATION PASSED on iteration 1
- Decision coverage gate (gsd-sdk): 19/19 decisions covered
- Requirements coverage: REQ-video-ring-buffer in all plans
- Security threat model: T-1-01/02/04 mitigated; T-1-03 accepted residual
Known non-blocking gaps:
- gsd-sdk roadmap.annotate-dependencies failed (t.trim is not a function);
ROADMAP plan-list annotations skipped. Phase 1 plan-list in ROADMAP.md
remains accurate; this is a cosmetic nice-to-have for cross-cutting
constraint visibility.
- 1 plan-checker warning (stale wave prose in Plan 03/04 objectives) was
fixed during decision-coverage revision.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>