Mark acb9033293 docs(01): record Phase 1 planning complete (7 plans, 7 waves)
After gsd-plan-phase 1: 7 plans across 7 waves. All gates pass:
- Plan-checker (sonnet) VERIFICATION PASSED on iteration 1
- Decision coverage gate (gsd-sdk): 19/19 decisions covered
- Requirements coverage: REQ-video-ring-buffer in all plans
- Security threat model: T-1-01/02/04 mitigated; T-1-03 accepted residual

Known non-blocking gaps:
- gsd-sdk roadmap.annotate-dependencies failed (t.trim is not a function);
  ROADMAP plan-list annotations skipped. Phase 1 plan-list in ROADMAP.md
  remains accurate; this is a cosmetic nice-to-have for cross-cutting
  constraint visibility.
- 1 plan-checker warning (stale wave prose in Plan 03/04 objectives) was
  fixed during decision-coverage revision.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-15 17:09:09 +02:00

2.9 KiB
Raw Blame History

gsd_state_version, milestone, milestone_name, status, stopped_at, last_updated, last_activity, progress
gsd_state_version milestone milestone_name status stopped_at last_updated last_activity progress
1.0 v2.0.0 milestone executing Phase 1 context gathered 2026-05-15T15:08:45.135Z 2026-05-15 -- Phase 1 planning complete
total_phases completed_phases total_plans completed_plans percent
5 0 7 0 0

Project State

Project Reference

See: .planning/PROJECT.md (updated 2026-05-15)

Core value: When an operator hits a bug, one click MUST produce a self-contained archive that lets support reproduce what happened — in under 5 s, no server, no password leaks. Current focus: Phase 1 — Stabilize video pipeline

Current Position

Phase: 1 of 5 (Stabilize video pipeline) Plan: 0 of TBD in current phase Status: Ready to execute Last activity: 2026-05-15 -- Phase 1 planning complete REQUIREMENTS.md, ROADMAP.md, STATE.md written)

Progress: [░░░░░░░░░░] 0%

Performance Metrics

Velocity:

  • Total plans completed: 0
  • Average duration: —
  • Total execution time: —

By Phase:

Phase Plans Total Avg/Plan
1. Stabilize video pipeline 0
2. Stabilize DOM + event capture privacy 0
3. Stabilize export pipeline 0
4. SPEC §10 smoke verification 0
5. Harden + clean up 0

Recent Trend:

  • Last 5 plans: —
  • Trend: —

Updated after each plan completion

Accumulated Context

Decisions

Decisions are logged in PROJECT.md Key Decisions table (DEC-001 through DEC-012, all SPEC-Accepted and locked for Phase 1). Recent decisions affecting current work:

  • Phase 1 framing: roadmap treats the existing codebase as a partially-broken first attempt to be remediated against the SPEC, not as greenfield. The 7 P0 defects from the audit are split across phases 13 along commit boundaries; phase 4 is end-to-end SPEC §10 smoke verification.

  • All 12 SPEC decisions (DEC-001..DEC-012) are LOCKED for Phase 1. Changing any of them requires a formal ADR; none are formally LOCKED in the ingest classification, so a future ADR can revise.

Pending Todos

None yet.

Blockers/Concerns

  • (informational) chrome.tabCapture requires a user gesture on first activation — Phase 3 (P0-4) restores this by moving the call into the popup click handler; until Phase 3 lands, recording cannot start cleanly even if Phase 1's pipeline is correct. Phases 13 should not be re-ordered.

Deferred Items

Items acknowledged and carried forward from previous milestone close:

Category Item Status Deferred At
(none)

Session Continuity

Last session: 2026-05-15T13:40:45.462Z Stopped at: Phase 1 context gathered intel synthesis. Coverage validated: 11/11 v1 REQs mapped. Resume file: .planning/phases/01-stabilize-video-pipeline/01-CONTEXT.md