Mark 30e5efd364 docs(01-03): complete offscreen recorder TDD plan
- Add 01-03-SUMMARY.md documenting RED -> GREEN gate (Plan 02 tests now
  pass), 3 Rule-3 auto-fixes (OffscreenLogger inline, defensive
  bootstrap, SW dead-code removal), and Plan 04 / 05 handoff notes.
- Update STATE.md: advance plan counter to 4 of 7 (43%), append
  metrics + 3 execution decisions, record session.
- Update ROADMAP.md: mark Plan 01-03 [x] complete.

REQ-video-ring-buffer remains NOT complete — still pending Plans 04
(port keepalive) and 07 (ffprobe acceptance gate).

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-15 17:42:21 +02:00

4.3 KiB
Raw Blame History

gsd_state_version, milestone, milestone_name, status, stopped_at, last_updated, last_activity, progress
gsd_state_version milestone milestone_name status stopped_at last_updated last_activity progress
1.0 v2.0.0 milestone executing Completed Plan 01-03 — recorder.ts ring-buffer + codec strict-mode GREEN; Plan 04 next (port keepalive + REQUEST_BUFFER wiring) 2026-05-15T15:41:54.994Z 2026-05-15
total_phases completed_phases total_plans completed_plans percent
5 0 7 3 43

Project State

Project Reference

See: .planning/PROJECT.md (updated 2026-05-15)

Core value: When an operator hits a bug, one click MUST produce a self-contained archive that lets support reproduce what happened — in under 5 s, no server, no password leaks. Current focus: Phase 1 — Stabilize Video Pipeline

Current Position

Phase: 1 (Stabilize Video Pipeline) — EXECUTING Plan: 4 of 7 Status: Ready to execute Last activity: 2026-05-15 REQUIREMENTS.md, ROADMAP.md, STATE.md written)

Progress: [████░░░░░░] 43%

Performance Metrics

Velocity:

  • Total plans completed: 0
  • Average duration: —
  • Total execution time: —

By Phase:

Phase Plans Total Avg/Plan
1. Stabilize video pipeline 0
2. Stabilize DOM + event capture privacy 0
3. Stabilize export pipeline 0
4. SPEC §10 smoke verification 0
5. Harden + clean up 0

Recent Trend:

  • Last 5 plans: —
  • Trend: —

Updated after each plan completion | Phase 01 P01 | 4min | 6 tasks | 6 files | | Phase 01 P02 | 4min | 5 tasks | 8 files | | Phase 1 P03 | 8min | 3 tasks | 5 files |

Accumulated Context

Decisions

Decisions are logged in PROJECT.md Key Decisions table (DEC-001 through DEC-012, all SPEC-Accepted and locked for Phase 1). Recent decisions affecting current work:

  • Phase 1 framing: roadmap treats the existing codebase as a partially-broken first attempt to be remediated against the SPEC, not as greenfield. The 7 P0 defects from the audit are split across phases 13 along commit boundaries; phase 4 is end-to-end SPEC §10 smoke verification.

  • All 12 SPEC decisions (DEC-001..DEC-012) are LOCKED for Phase 1. Changing any of them requires a formal ADR; none are formally LOCKED in the ingest classification, so a future ADR can revise.

  • [Phase ?]: Doc cascade: amendments append (do not replace) original DEC/CON blocks to preserve SPEC provenance — Established convention for future SPEC-amending phases; downstream readers see both old + new with citation

  • [Phase ?]: Manifest: drop alarms permission entirely rather than retain for re-use — Plan 05 deletes the alarms code path; declaring unused permissions expands attack surface (T-1-02)

  • [Phase ?]: Pinned vitest at ^4 (4.1.6 latest stable; 5.x still beta on 2026-05-15)

  • [Phase ?]: Phase 1 Wave-0 test infra: 4 RED tests committed against not-yet-existent src/offscreen/recorder.ts — pins contracts for Plans 03+04

  • [Phase ?]: Reverted premature REQ-video-ring-buffer Complete marking left by Plan 01-01; satisfied by Plans 03+04+07, not by Wave-0 RED tests

  • [Phase 01-03]: Bundled OffscreenLogger into Task 2 commit (Rule 3 blocking dependency — recorder.ts cannot typecheck without the import)

  • [Phase 01-03]: Defensive bootstrap guard (typeof chrome check) lets pure ring-buffer test import recorder module without chrome stub

  • [Phase 01-03]: Removed SW-side VIDEO_CHUNK/VIDEO_CHUNK_SAVED branches + IndexedDB helpers inline (tsc-clean requires; Plan 05 owns remaining SW shrink)

Pending Todos

None yet.

Blockers/Concerns

  • (informational) chrome.tabCapture requires a user gesture on first activation — Phase 3 (P0-4) restores this by moving the call into the popup click handler; until Phase 3 lands, recording cannot start cleanly even if Phase 1's pipeline is correct. Phases 13 should not be re-ordered.

Deferred Items

Items acknowledged and carried forward from previous milestone close:

Category Item Status Deferred At
(none)

Session Continuity

Last session: 2026-05-15T15:41:54.976Z Stopped at: Completed Plan 01-03 — recorder.ts ring-buffer + codec strict-mode GREEN; Plan 04 next (port keepalive + REQUEST_BUFFER wiring) intel synthesis. Coverage validated: 11/11 v1 REQs mapped. Resume file: .planning/phases/01-stabilize-video-pipeline/01-04-PLAN.md