Commit Graph

6 Commits

Author SHA1 Message Date
30e5efd364 docs(01-03): complete offscreen recorder TDD plan
- Add 01-03-SUMMARY.md documenting RED -> GREEN gate (Plan 02 tests now
  pass), 3 Rule-3 auto-fixes (OffscreenLogger inline, defensive
  bootstrap, SW dead-code removal), and Plan 04 / 05 handoff notes.
- Update STATE.md: advance plan counter to 4 of 7 (43%), append
  metrics + 3 execution decisions, record session.
- Update ROADMAP.md: mark Plan 01-03 [x] complete.

REQ-video-ring-buffer remains NOT complete — still pending Plans 04
(port keepalive) and 07 (ffprobe acceptance gate).

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-15 17:42:21 +02:00
edc605d475 docs(01-02): complete wave-0 test infrastructure plan
- 01-02-SUMMARY.md created (Vitest 4.1.6 installed; 4 RED test files
  pinning Plans 03+04 contracts; tests/fixtures/.gitkeep marker)
- STATE.md advanced: plan 2/7 -> 3/7; progress 14% -> 29%; metric row
  added; 3 decisions logged; session continuity updated
- ROADMAP.md progress row updated: Phase 1 = 2/7 In Progress
- REQUIREMENTS.md: REVERTED premature [x] + "Complete" marking of
  REQ-video-ring-buffer (Plan 01-01 mistakenly marked it; the requirement
  is satisfied by Plans 03+04+07's implementation + ffprobe gate, not by
  RED test scaffolding). Now reads "[ ]" + "In Progress" — honest state.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-15 17:28:49 +02:00
13b67f5136 docs(01-01): complete doc-cascade plan
Plan 01-01 (Wave-0 doc cascade) complete. Six tasks landed atomically
in commits 125c032, fb88830, b1ed2cb, 597d967, 32bc996, 4a5194e. Every
code-touching plan in Phase 1 (01-02..01-07) now reads a consistent
baseline: getDisplayMedia replaces tabCapture in DEC-003; long-lived
port replaces alarms in DEC-010; manifest.json carries the final
Phase-1 permissions set (desktopCapture, activeTab, downloads,
scripting, storage, offscreen).

SUMMARY: .planning/phases/01-stabilize-video-pipeline/01-01-SUMMARY.md
2026-05-15 17:19:48 +02:00
acb9033293 docs(01): record Phase 1 planning complete (7 plans, 7 waves)
After gsd-plan-phase 1: 7 plans across 7 waves. All gates pass:
- Plan-checker (sonnet) VERIFICATION PASSED on iteration 1
- Decision coverage gate (gsd-sdk): 19/19 decisions covered
- Requirements coverage: REQ-video-ring-buffer in all plans
- Security threat model: T-1-01/02/04 mitigated; T-1-03 accepted residual

Known non-blocking gaps:
- gsd-sdk roadmap.annotate-dependencies failed (t.trim is not a function);
  ROADMAP plan-list annotations skipped. Phase 1 plan-list in ROADMAP.md
  remains accurate; this is a cosmetic nice-to-have for cross-cutting
  constraint visibility.
- 1 plan-checker warning (stale wave prose in Plan 03/04 objectives) was
  fixed during decision-coverage revision.

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-05-15 17:09:09 +02:00
4909f3155a docs(state): record phase 1 context session .planning/STATE.md 2026-05-15 15:40:51 +02:00
89ca09ccec docs: bootstrap .planning/ via /gsd-ingest-docs (2 docs) /home/parf/projects/work/repremium/.planning/PROJECT.md /home/parf/projects/work/repremium/.planning/REQUIREMENTS.md /home/parf/projects/work/repremium/.planning/ROADMAP.md /home/parf/projects/work/repremium/.planning/STATE.md /home/parf/projects/work/repremium/.planning/intel /home/parf/projects/work/repremium/.planning/INGEST-CONFLICTS.md /home/parf/projects/work/repremium/.ingest-manifest.yaml 2026-05-15 15:16:30 +02:00